Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC B 134 GANESH MURTHI NAGAR PART III COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹15.7 L+₹1.2 L (8.28%)Rejected-Finance BLOCK NO 6 7 WING NO 3 RAHUL COMPLEX I ST BUS STAND GANESHPETH GANESHPETH NAGPUR NAGPUR MAHARASHTRA 440018 | NAGPUR | MAHARASHTRA | 440018 | L2 | Rejected-Finance Other than lowest bidder |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
21 Jan 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF NAGPUR
OFFICE OF GARRISON ENGINEER AIR FORCE VAYUSENA NAGAR NAGPUR- 440007
REPAIR MAINTANENCE OF AIR COOLING DUCT SYSTEM AND CONNECTED ACCESSORIES AT COMMAND BLDG AT VSN NAGPUR
2020_MES_400272_2
GE/NAG/20-21/8402/50
Open Tender
Miscellaneous Works
Item Rate
180 days
GE AF NAGPUR
As per NIT
8 documents required · 8 mandatory
₹500
GE AF NAGPUR
₹30,000
18 Feb 2021
6 Jan 2021
23 Jan 2021
6 Jan 2021
21 Jan 2021
7 Jan 2021
60 days
Amount
Taking down electric motor 30/25 HP 415 volt coupled to pump after disconnecting the electrical connection, and earth connections from its foundation and transportation to work shop , checking the serviceability of ball bearing gboth side of motor , greasing of bearing up to free rotation of shaft of motor complete, greasing on reassemblying the motor to reinstallation on foundation, reconnecting back the cable and earth connections etc complete in all respect and starting the pump all as directed. Note : Cost of Rewinding & Bearings shall be measured and paid separately.
Taking down electric motor 0.5 415 volt coupled to pump after disconnecting the electrical connection, and earth connections from its foundation and transportation to work shop , checking the serviceability of ball bearin gboth side of motor , greasing of bearing up to free rotation of shaft of motor complete, greasing on reassemblying the motor to reinstallation on foundation, reconnecting back the cable and earth connections etc complete in all respect and starting the pump all as directed. Note : Cost of Bearings shall be measured and paid separately under relevent item.
M & L for Rewinding of pump motor 415 Volt 3 phase after disconnecting electric cable and eath lead, suction and delivery pipes, shifting to work shop, dismantling the motor assembly and removing the burnt out copper winding of stator and cleaning the stator slots and core assembly, rewinding to stator with suitable gauge super enamelled copper wire with insulating papers and insulation cloths, varnishing the winding and baking heating for achieving the required insulation resistance, re-assembling the motor and testing complete, incl transporting back to site and fixing motor to its original place, reconnecting electric cable and earth leads etc testing and commissioning complete in all respect all as specified and as directed by Engr-in-charge for the following capacity: -
(a) up to 1 HP
M&L for painting of air blower motor /blower stand / and floor of ambient chamber , water pump with motor of capacity upto 35 HP Including 0.5 hp wter pump after removing all dust, dirt etc and clean the surface thoroughly with two coats of synthetic enamel paint including writing the complete all as specified and directed.
S&F Motor protection relay MPR 300 make L& T range 32-88
Supply and laying LT Rubber mating chequered of size 2 mtr x 1 mtr x12 mm thick as per ISI mark
Taking out U/S and S&F Power contactor 3 pole 415 V AC type MNX 50, Make : L&T Cat No . ST19001 or equivalent in Siemens, C&S.
Taking out U/S S&F electronic timer type ET 100 with time range 0 to 60 seconds, 360 Volt Make : L&T Cat No 3 Q1748 or equivalent in Siemens, C&S.
Taking out U/S & supply and fix ball Bearing for Blower shaft , (sample available as AGE E/M office)
Taking down U/S & Supply & fixing V belt cat part MN 30 for capacity of 30000 to 40000 cfm blower motor suitable for the existing plant size 32/20
Takin down U/S & Supply & install Blower pully as per existing blower capacity (Sample availabe as AGE E/M office)
M & L for cleaning and removing all scales and dirt etc, from PVC tanks of capacity exc 250 Ltrs and n. exc 500 Ltrs and from mouth by emptying, drying, cleaning by scrubbing the dust with wire brush, after removing inlet and out let pipes (also cleaning the mouths of circulating pipe) and refixig including printing date of cleaning with synthetic enamel white paint in proper format and reconnecting all inlet and outlet pipes all as specified and as directed.NOTE: If float valve broken at the time of cleaning by the contractor has to replace it without any extra payment.
Taking down U/S & Supply & fix 25 mm ball valves high pressure of PTMT with epoxy coated Aluminium rod and high density plastic ball screwed for iron pipe and fixing with all connected accessories (Minimum weight-455 gms)
Taking down U/S old nitrile insulation / glass insulation & supply and fix new Nitrile insulation 12 mm thick nitrile rubber sheet with suitable adahisive of duct work fixed out side of duct/ inside duct and air washer chamber for weather proofing using 12 mm thick nitrile rubber sheet fixing with nylon cloth complete all as specified and all as directed by Engr-In--Chargre 1. Note: The cost of Nitrile insulation patch occured during contract period maintnence shall be deemed to be included in this item rate. Note No-02 The cost shall be included fixing of GI sheet strip given in item No 16 all as specified and as directed by engr-in-charge
Taking down U/S old nitrile insulation / glass insulation & supply and fix new Nitrile insulation 25 mm thick nitrile rubber sheet with suitable adahisive of duct work fixed out side of duct/ inside duct and air washer chamber for weather proofing using 25 mm thick nitrile rubber sheet fixing with complete all as specified and all as directed by Engr-In--Chargre 1. Note: The cost of Nitrile insulation patch occured during contract period maintnence shall be deemed to be included in this item rate. Note No-02 The cost shall be included fixing of GI sheet strip given in schedule item No 16 all as specified and as directed by engr-in-charge
Suply and fix aluminium strip 25x3 mm thick using suitable support to fixing of nitrile insulation inisde/outside of AHU and duct for air washer plant Note: The cost shall be deemed to be included making holes in strip , nut bolts and washers etc all as specified and as directed,
Provision of scraffolding for repair of Existing duct insulation & defected portion of duct & material and labour for erected with steel structure for repairing work in cmd building site and rigidly supported safe working height 13 mtrs . Removing structure after completion of repairing work cost of included transportation and labour all as specified and directed.
Taking down U/S and S & F short neck of duct connected with air diffuser with long type and complete fixing with air sealed diffuser for avoiding of noise and air leakge all as specified and directed. Note : If found leakge or noise in the duct or plant the contractor has responsible to repair without any extra cost.
M&L for cleanig of rusted portion of duct and dust settled in existing duct & dampers in whole building where is passing of duct and all floors going from main duct to branch duct number unit duct and diffusers and plant by using suitable equipment or suction machine/compressor from AHU to neck duct all as specified and directed.
M&L for Comprhensive mainnence /overhauling /repair of complete air washer ambiator chamber including necessary oiling/greasing , cleaning and realignment motor with blower of existing plant of capacity 10000 to 40000 CFM all as directed
Supply and replace blower shaft as per existing size all as specified and directed.
Supply only grease for suitable for pump bearings all as specified and directed.
Taking down U/S & supply and fix high performance plated panel or air pre-filters for hvac and general ventilation used as pre filtration made of GI /Aluminium construction having efficiency 90% down to 20 micron suitable for existing plant size of filter 60cmx60cm, having features low initial pressure drop, disposable,washable , maintenance free, compact design (sample available as AGE E/M office)all as specified and directed.
Taking down U/S Cellulose or celldek pads and supply and fix new consists for cellulose wood fibres in paper form . having high quality standard and posses on efficiency of more than 85% (sample available as AGE E/M office) all as specified and directed. Make Hutek/Munters
Taking down U/S & supply and fix GI sheet in to the water cooler ambient chamber tray (Tray size sample availble at site) and fixing in rusted portion and make tray leake proof arrangement . The gi sheet will be made out of galvanised steel sheet of 22 swg including any accessories in rubber gasket , ribbets, hinges from door and gate installed at duct chamber etc required for fabrication and tightining of door and fixing of new hinges in to the door and fixing of thee gae and door ofter rectification of fault of door complete all as specified directed Note No -01 The cost shall be included suitbale arrangemnt of welding machine , electric arrangemnet / gas cyclinder . Note No-02 The cost shall also included dismantling of pre air fileter, water pump , water piping and cellulose pads from water cooler tray and refixing of the same after rectification of leakage and completely leak proof arrangementof tray as specified and as directed. If the any air filter / celluose pads damaged during execution , The contractor will rectify the same free of cost.
Taking down U/S & supply and fix aluminium grills for air supply made out of powder coated extruded aluminium grils adjustable type with variable angle and verticle and horizantal louvers and gape between louvers should be 25 mm with volume controls dampers complete all as directed
Taking down U/S & supply and fix GI duct of difference sizes made out of MS flat iron of any size duly cutting , bending to shape required , welding as required for different size ducts and making hole on flat iron for fixing anchor bolts at RCC slab complete all as specified and directed
Taking down U/S & supply and fix MS angle frame work for installation of GI duct of different sizes , made out of MS angle iron of any size including fabrication of suitbale frames for GI ducts different size ducts and making hole for fixing nut bolts complete all as directed
Taking down u/s and Supply and fix MCB 4 pole 63 amps, breaking capacity 10 KA, confirming to IEC60947-2, 415 volts, 50 Hz including making necessary incoming and out going electrical connection with suitable size of copper lugs etc. Make : Legrand Cat No. 408702 /hager Siemens
Taking out unservicable & S & F MCCB 4 pole 100 amp , breaking capacity 16 Ka, 415 volts, 50 Hz including necessary incoming and out going electric connection with suitable size of copper lugs etc. Make : Legrand /hager Siemens Hager,
Taking down U/s insulation/aluminium cladding and supply and fix (ACP Sheet thicknes 0.5 mm ) aluminium cladding 0.5 mm thick for AHU fixing in out side of AHU all as specified and directed. Note : The cost shall be included for nitrile insulation 12 mm thick on outer side of aluminium clading.
Taking down u/s and Supply and fix industrial Exhaust fan axial flow motor with blade and frame heavy duty industrial exhaust fan (36 inch/ with IP 55 specification, rigid frame with rubber mounting for silent operation epoxy powder coated and better resistance to corrosion and scid alkali fumes, totally enclosed highly efficient heavy duty copper motor including testing of motor with suitable copper wire winding ,incl refixing of exhaust fan motor with blade and frame, AC, volts, Heavy duty and blades 36 inch sweep, suitable for air washer plant all as specified and directed. Make :- CG,Havells or bajaj.
Taking out u/s and supply and fix PVC insulated 1100 volt grade heavy duty cable multistranded copper conductor and connectinf upto the electrical system of size 4 sqmm 3 core complete all as specified
Taking out u/s and supply and fix PVC insulated 1100 volt grade heavy duty cable multistranded copper conductor and connectinf upto the electrical system of size 2.5 sqmm 3 core complete all as specified
Taking out unserviceable PLC (porgrammble logic control unit) from existing size and capacity / model & supply and install new PLC of same capacity in existing panle , testing and commissioning with removing of burnt wiring and supply and fix copper control wiring and spare parts required to full fuctional of PLC and one year warranty of plc and maintenance of / motor control panel . The cost shall be included repalcement of unserviceable of minor spare parts to required to make serviceable to PLC all as specified and directed.
Taking down u/s and supply and fix RYB indicator
Taking down u/s and supply and fix voltmeter as per sample Digital type
Taking down u/s and supply and fix Amp meter as per Digital type
Taking down u/s and supply and fix over laod relay as per existing capacity
Taking out U/s and supply and fix Auxillary contactor 2 NO-2 NC as per sample
Taking out U/s and supply and fix on delay timer as per sample
Taking out U/s and supply and fix push button start/ stop as per sample
Taking out U/s and supply and fix red indication as per sample
Taking out U/s and supply and fix ryellow indication as per sample
Taking out U/s and supply and fix green indication as per sample
Taking down u/s and supply and fix 4 sqmm copper wire for internal wiring
Taking down u/s and supply and fix lugs as per sample
Taking down u/s and supply and fix Add on 2 NO - 02 NC as per sample
Taking down U/s and supply and fix spreader link kit as per sample
(i) Taking out old unserviceable fan blade unit made of PVC body of industrial type direct desert cooler (Air blower unit) of capacity 40000 CFM from a height of 10 ' from ground level-21 Nos
Advance Refrigeration Engineering Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .