Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
28 May 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Supertending Engineer
EDC, Ayodhya
134 H(F)(W)/2024-25
2025_MVVNL_1010395_3
134 H(F)(W)/2024-25
Open Tender
Electrical Works
Item Wise
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹5,000
16 Jun 2025
22 May 2025
29 May 2025
22 May 2025
28 May 2025
22 May 2025
Amount
The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 30 Km.)
PCC Pole 8.5 Mtr. Long
ACSR Weasel Conductor
Transformer 250 KVA
Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of ST/PCC Pole as per RESPO Norms.
Fabrication and Erection of Double Pole Support on ST/PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Erection of Single Pole Support on ST/PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Mounting of 250 KVA Transformer as per RESPO Norms
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Construction of Plinth of 250 KVA Transformer including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms
Fencing of Transformer Plinth 250 KVA with the help of wire mesh/Barbed wire after grouting proper size of angle as per RESSPO Norms. Inclusive of all material such as Wiremesh/Barbed Wire, Angle Flats, Nut Bolts etc.
Ramendra Pratap Singh (BID ID -5215461)
M/S BALAJI ENTERPRISES (BID ID -5220567)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .