| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance | ₹1.3 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.3 CrRejected-Finance | ₹1.3 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.3 CrRejected-Finance | ₹1.3 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.4 CrRejected-Finance | ₹1.4 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.4 CrRejected-Finance 3 39 TEACHERS COLONY LALGUDI TRICHY 621 601 | LALGUDI | TIRUCHIRAPPALLI | TAMIL NADU | 621601 | ₹1.4 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | creepers engineering contractors L5 | SHAKTHI CONSTRUCTION L3 | ALAGAPPA CONSTRUCTIONS L2 | K DHINAKARAN L8 | HARISH CONSTRUCTION L9 | N.CHITRA L6 | HRITHIC CONSTRUCTIONS L1 | M.RAMALINGAM L7 | K.KARUPPASAMY WORKS CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.MR & DMR not requiring blasting in earthwork excavation. | 610.2 | m3 | 100 ₹61,020 | 100 ₹61,020 | 100 ₹61,020 | 300 ₹1.8 L | 350 ₹2.1 L | 126 ₹76,885.20 | 200 ₹1.2 L | 350 ₹2.1 L | 100 ₹61,020 |
| 2.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.Removing hard rock by wedging,chiseling and trimming to proper shape where blasting is prohibited | 406.8 | m3 | 150 ₹61,020 | 250 ₹1.0 L | 300 ₹1.2 L | 300 ₹1.2 L | 800 ₹3.3 L | 126 ₹51,256.80 | 1,100 ₹4.5 L | 1,300 ₹5.3 L | 50 ₹20,340 |
| 3.00 | Supplying and filling with M. sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 47 | m3 | 3,000 ₹1.4 L | 1,800 ₹84,600 | 2,000 ₹94,000 | 1,500 ₹70,500 | 2,240 ₹1.1 L | 1,800 ₹84,600 | 2,000 ₹94,000 | 2,000 ₹94,000 | 1,000 ₹47,000 |
| 4.00 | PCC 1:3:6, using 40mm HBG metal foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 97 | m3 | 5,800 ₹5.6 L | 5,000 ₹4.8 L | 3,500 ₹3.4 L | 7,000 ₹6.8 L | 5,300 ₹5.1 L | 5,400 ₹5.2 L | 5,000 ₹4.8 L | 6,000 ₹5.8 L | 7,500 ₹7.3 L |
| 5.00 | RCC 1:1.5:3 using 12-20mm ( M20 ) graded hard machine broken granite stone with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.(Raft ) | 154 | m3 | 7,500 ₹11.6 L | 9,500 ₹14.6 L | 8,000 ₹12.3 L | 7,000 ₹10.8 L | 10,900 ₹16.8 L | 5,940 ₹9.1 L | 8,000 ₹12.3 L | 8,000 ₹12.3 L | 10,000 ₹15.4 L |
| 6.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For FPW column concrete. | 6 | m3 | 10,000 ₹60,000 | 12,000 ₹72,000 | 25,000 ₹1.5 L | 7,000 ₹42,000 | 30,500 ₹1.8 L | 45,000 ₹2.7 L | 15,000 ₹90,000 | 8,500 ₹51,000 | 12,000 ₹72,000 |
| 7.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For FPW beam concrete. | 5 | m3 | 10,000 ₹50,000 | 13,000 ₹65,000 | 12,000 ₹60,000 | 7,000 ₹35,000 | 15,000 ₹75,000 | 45,000 ₹2.3 L | 10,000 ₹50,000 | 9,500 ₹47,500 | 12,000 ₹60,000 |
| 8.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Pedestal concrete. | 38 | m3 | 9,000 ₹3.4 L | 12,000 ₹4.6 L | 10,000 ₹3.8 L | 7,000 ₹2.7 L | 15,000 ₹5.7 L | 14,400 ₹5.5 L | 8,500 ₹3.2 L | 9,500 ₹3.6 L | 12,000 ₹4.6 L |
| 9.00 | PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete. | 232 | m3 | 6,000 ₹13.9 L | 8,000 ₹18.6 L | 7,000 ₹16.2 L | 7,000 ₹16.2 L | 10,600 ₹24.6 L | 9,000 ₹20.9 L | 7,800 ₹18.1 L | 8,500 ₹19.7 L | 9,000 ₹20.9 L |
| 10.00 | RCC 1:1.5:3 using 12-20mm ( M20 ) graded hard machine broken granite stone with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.(Cable Duct side wall) | 97 | m³ | 7,000 ₹6.8 L | 9,500 ₹9.2 L | 9,000 ₹8.7 L | 7,000 ₹6.8 L | 11,600 ₹11.3 L | 10,800 ₹10.5 L | 7,800 ₹7.6 L | 9,000 ₹8.7 L | 9,000 ₹8.7 L |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
23 Mar 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE/TP SO/Madurai
Providing Tr. Plinth, Structural Plinths, Cable duct, Fire Protection wall Alagarkovil 230 KV SS
2026_EB_673542_1
CE/TP SO/MDU Specn.No.022/2025-26
Open Tender
Civil Works - Others
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.6 L
15 May 2026
11 Mar 2026
24 Mar 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.MR & DMR not requiring blasting in earthwork excavation.
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.Removing hard rock by wedging,chiseling and trimming to proper shape where blasting is prohibited
Supplying and filling with M. sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete.
PCC 1:3:6, using 40mm HBG metal foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 using 12-20mm ( M20 ) graded hard machine broken granite stone with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.(Raft )
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For FPW column concrete.
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For FPW beam concrete.
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Pedestal concrete.
PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 using 12-20mm ( M20 ) graded hard machine broken granite stone with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.(Cable Duct side wall)
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone with steel mould, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab concrete.
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Labour charges for transporting from casting yard to curing tank,curing tank to cable duct , aligning and laying of RCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete
Supplying and fixing PVC pipes for the cable entry for inside the cable duct including cost of PVC pipes fixing charges etc complete
Brickwork in CM 1:5 mix using II class chamber bricks of size 9"x 4 3/8"x2"3/4" for super structure including cost of all materials, labour, lead, lift, curing, etc., complete.
Plastering with CM 1:5, 12mm thick including cost of all materials, labour, lead, lift, etc. complete.
colour washing two coats with approved qulity of ASIAN ULTIMA paint over one coat of white cement including cost of all materials , labour lead and lift etc complete.
Refilling with excavated earth other than sand in foundation and sides of masonry, consolidation as per std.specn.with water including all, labour, lead , lift, etc., complete.
Removing the excess earth to the nearby bund or low laying area instructed by field engineer including all lead, lift, etc., complete.
Supplying and fabricating perforated G.I. tray including cost of materials fixing them in position GI Bolt and nut labour lead etc complete
Fixing of rails over the transformer plinth including cutting to the required length welding of MS flat at bottom of rails including MS boils and aligning all lead, lifts, labour etc., complete
Assembling of stub and cleat using template for 'H' type towers including cost of template and transport of template,stubs& cleats to site, all labour lead, lift, etc, complete.
Supplying , transport and erection of GI tower angles for H type, VC , WC towers & booms and all other lattice struct. Including cost of all materials for GI angles, galvanising, all labour lead, lift , etc., complete
Supplying GI bolt and nut and washer as per IS std. and sample to be approved by competent authority before erection including cost of material transport charges , lead, lift , labour , etc., complete
Fabrication and suppy of foundation bolts including providing L angle at bottom and threading at top and galvanizing the top of bolt including cost rod, 3 nos nuts and necessary plate washer ,lead,lift,all materials, labour lead lift etc. complete.
Supply and fabrication charges of template set to suit WCand VC columns foundation bolts fixing etc including cost of all labour lead and lift etc complete .
Labour charges for setting of template set for WC and VC columns foundation as per standard drawing and aligning and fixing in position bolts fixing, etc including cost of all labour lead and lift etc complete
Painting with anticorrosive paint two coats including cost of all materials, labour, lead, lift etc complete.,
supply and fixing of Earth trough of 60cms dia. 40mm tk. And 60cm height
Providing pipe type earthing using 40mm dia GI pipe 3m length including cost of pipe, labour, fabrication of earth strip lead, lift, etc., complete.
Dismantling the existing PCC including all labour charges including initial lead, lift, etc. complete.
Supply and providing of 450-600 mm dia, 300mm height, 36 mm thick cement collar with top cover for identification of earth electrode location as directed by the field engineers.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_809543.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid