Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.3 Cr+₹2.8 L (2.15%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.3 Cr+₹3.6 L (2.76%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.4 Cr+₹6.8 L (5.22%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹1.4 Cr+₹11.6 L (8.97%)Rejected-Finance 3139 TEACHERS COLONY LALGUDI TRICHY 621 601 | TRICHY | TRICHY | TAMIL NADU | 621601 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | creepers engineering contractors L5 | SHAKTHI CONSTRUCTION L3 | ALAGAPPA CONSTRUCTIONS L2 | K DHINAKARAN L8 | HARISH CONSTRUCTION L9 | N.CHITRA L6 | HRITHIC CONSTRUCTIONS L1 | M.RAMALINGAM L7 | K.KARUPPASAMY WORKS CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.MR & DMR not requiring blasting in earthwork excavation. | 610.2 | m3 | 100 ₹61,020 Lowest | 100 ₹61,020 Lowest | 100 ₹61,020 Lowest | 300 ₹1,83,060 | 350 ₹2,13,570 | 126 ₹76,885.2 | 200 ₹1,22,040 | 350 ₹2,13,570 | 100 ₹61,020 Lowest |
| 2.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.Removing hard rock by wedging,chiseling and trimming to proper shape where blasting is prohibited | 406.8 | m3 | 150 ₹61,020 | 250 ₹1,01,700 | 300 ₹1,22,040 | 300 ₹1,22,040 | 800 ₹3,25,440 | 126 ₹51,256.8 | 1,100 ₹4,47,480 | 1,300 ₹5,28,840 | 50 ₹20,340 Lowest |
| 3.00 | Supplying and filling with M. sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 47 | m3 | 3,000 ₹1,41,000 | 1,800 ₹84,600 | 2,000 ₹94,000 | 1,500 ₹70,500 | 2,240 ₹1,05,280 | 1,800 ₹84,600 | 2,000 ₹94,000 | 2,000 ₹94,000 | 1,000 ₹47,000 Lowest |
| 4.00 | PCC 1:3:6, using 40mm HBG metal foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | 97 | m3 | 5,800 ₹5,62,600 | 5,000 ₹4,85,000 | 3,500 ₹3,39,500 Lowest | 7,000 ₹6,79,000 | 5,300 ₹5,14,100 | 5,400 ₹5,23,800 | 5,000 ₹4,85,000 | 6,000 ₹5,82,000 | 7,500 ₹7,27,500 |
| 5.00 | RCC 1:1.5:3 using 12-20mm ( M20 ) graded hard machine broken granite stone with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.(Raft ) | 154 | m3 | 7,500 ₹11,55,000 | 9,500 ₹14,63,000 | 8,000 ₹12,32,000 | 7,000 ₹10,78,000 | 10,900 ₹16,78,600 | 5,940 ₹9,14,760 Lowest | 8,000 ₹12,32,000 | 8,000 ₹12,32,000 | 10,000 ₹15,40,000 |
| 6.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For FPW column concrete. | 6 | m3 | 10,000 ₹60,000 | 12,000 ₹72,000 | 25,000 ₹1,50,000 | 7,000 ₹42,000 Lowest | 30,500 ₹1,83,000 | 45,000 ₹2,70,000 | 15,000 ₹90,000 | 8,500 ₹51,000 | 12,000 ₹72,000 |
| 7.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For FPW beam concrete. | 5 | m3 | 10,000 ₹50,000 | 13,000 ₹65,000 | 12,000 ₹60,000 | 7,000 ₹35,000 Lowest | 15,000 ₹75,000 | 45,000 ₹2,25,000 | 10,000 ₹50,000 | 9,500 ₹47,500 | 12,000 ₹60,000 |
| 8.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Pedestal concrete. | 38 | m3 | 9,000 ₹3,42,000 | 12,000 ₹4,56,000 | 10,000 ₹3,80,000 | 7,000 ₹2,66,000 Lowest | 15,000 ₹5,70,000 | 14,400 ₹5,47,200 | 8,500 ₹3,23,000 | 9,500 ₹3,61,000 | 12,000 ₹4,56,000 |
| 9.00 | PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete. | 232 | m3 | 6,000 ₹13,92,000 Lowest | 8,000 ₹18,56,000 | 7,000 ₹16,24,000 | 7,000 ₹16,24,000 | 10,600 ₹24,59,200 | 9,000 ₹20,88,000 | 7,800 ₹18,09,600 | 8,500 ₹19,72,000 | 9,000 ₹20,88,000 |
| 10.00 | RCC 1:1.5:3 using 12-20mm ( M20 ) graded hard machine broken granite stone with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.(Cable Duct side wall) | 97 | m³ | 7,000 ₹6,79,000 Lowest | 9,500 ₹9,21,500 | 9,000 ₹8,73,000 | 7,000 ₹6,79,000 Lowest | 11,600 ₹11,25,200 | 10,800 ₹10,47,600 | 7,800 ₹7,56,600 | 9,000 ₹8,73,000 | 9,000 ₹8,73,000 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
23 Mar 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE/TP SO/Madurai
Providing Tr. Plinth, Structural Plinths, Cable duct, Fire Protection wall Alagarkovil 230 KV SS
2026_EB_673542_1
CE/TP SO/MDU Specn.No.022/2025-26
Open Tender
Civil Works - Others
Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.6 L
2 Jul 2026
11 Mar 2026
24 Mar 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.MR & DMR not requiring blasting in earthwork excavation. | - | m3 | - | - |
| 2 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.Removing hard rock by wedging,chiseling and trimming to proper shape where blasting is prohibited | - | m3 | - | - |
| 3 | Supplying and filling with M. sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | - | m3 | - | - |
| 4 | PCC 1:3:6, using 40mm HBG metal foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete. | - | m3 | - | - |
| 5 | RCC 1:1.5:3 using 12-20mm ( M20 ) graded hard machine broken granite stone with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.(Raft ) | - | m3 | - | - |
| 6 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For FPW column concrete. | - | m3 | - | - |
| 7 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For FPW beam concrete. | - | m3 | - | - |
| 8 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Pedestal concrete. | - | m3 | - | - |
| 9 | PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete. | - | m3 | - | - |
| 10 | RCC 1:1.5:3 using 12-20mm ( M20 ) graded hard machine broken granite stone with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement.(Cable Duct side wall) | - | m³ | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_809543.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .