Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-AOC 1504 BOGI LAKSHMANAYAKKAR LANE SOUTH ALANGAM THANJAVUR 613009 | THANJAVUR | THANJAVUR | TAMIL NADU | 613009 | L1 | Accepted-AOC Less Estimate Value | |
| 2 | L2₹32.5 L+₹90,542.83 (2.86%)Rejected-Finance NO 13 273 FIRST FLOOR MIG MARUTHAM NEW HOUSING UNIT THANJAVUR 613005 | THANJAVUR | THANJAVUR | TAMIL NADU | 613005 | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹32.0 L
EMD Value
₹33,000
Closing Date
18 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
JOINT DIRECTOR/PROJECT DIRECTOR
DRDA, PUDUKKOTTAI
MGSMT 25 Percent -22-23- Pack - 27 -Upgradation and Five years Maintenace of One Road in Karambakudi Block-Pudukkottai District
2023_RDTN_331046_1
Karambakudi-27-/MGSMT 25 Percent -22-23/PDK
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹33,000
16 Nov 2023
23 Jun 2023
18 Jul 2023
23 Jun 2023
18 Jul 2023
23 Jun 2023
Amount
R-467 Upgradation of Thoputheru to ayyanarkovil joint road km 0/0-0/410
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.6 Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Providing and fixing Name board Cum Citizen Board
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bitumunous Surface
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) 200 m stone
(ii) Guard Stone
Provision for Photographic charges
Construction of RCC Pipe Culvert @ Ch 170
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Provision for 0.900M pipe NP3
supply and fi11ing of gravel
Construction RCC 3.0 m Span Culvert @ Ch 220
Earth work excavation for foundation soil as per SS 20 B for foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Below sill Level
Above sill Level
Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
Construction of Retaining Wall ch 230-260
Earth work excavation for foundation soil as per SS 20 B for foundation.
Filling with M.sand including including all labour charges for filling etc complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel
Below sill Level , Above sill Level
Providing for PVC 3" Pipe for Weep Holes @ 2.00 metre spacing etc., complete
Backfilling behind retaining wall complete as per drawings & technical specification Clause 1204.3.8
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Durairaj Jeevagan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .