Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 02 SILI JAGEER PIPLIYA BAHERI BAREILLY UTTAR PRADESH 243202 | BAREILLY | UTTAR PRADESH | 243202 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 00 JALESAR MAHAVIR GANJ 00 VILLAGE TOWN JALESAR CITY ETAH ETAH UTTAR PRADESH 207302 INDIA | ETAH | UTTAR PRADESH | 207302 | Rejected-Technical PQR NOT QUALIFIED |
Tender Value
₹59.7 L
EMD Value
₹60,000
Closing Date
24 Dec 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC ALIGARH
LAL DIGGI ALIGARH
Diversion work due to defence corridor at Andala Khair from location No 75A to 79A of 220 KV Khair Aligarh 400 KV AND 220 KV Khair Meetai line under ETD I Aligarh
2021_UPTCL_649567_2
SHORT TERM ETC-44/2021-22
Open Tender
Electrical Works
Item Wise
60 days
SE ETC ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
SE ETC ALIGARH
₹60,000
29 Dec 2021
13 Dec 2021
24 Dec 2021
13 Dec 2021
24 Dec 2021
13 Dec 2021
120 days
TOWER ACCESSORIES (SUPPLY)
Number Plate
Phase Plate in sets of Red, Yellow, Blue
DANGER PLATE
Hardware & Accessories for ACSR Zebra (SUPPLY)
Single Tension Fittings
Double Tension Fittings
Vibration Dampers
Mid Span Compression Joint
Repair Sleeve
160 KN Polymer Insulators
OPGW & Accessories (SUPPLY)
Joint Box
Duble Tension Fitting for OPGW
Vibration Dampers for OPGW
Copper Bond
ERECTION
Survey for shifting of tower no. 75A to79A of 220 KV Khair-Aligarh (400KV) line & 220 KV Khair-Meetai line
Check survey and final peg marking for shifting of tower no. 75A to 79 A of 220 KV Khair-Aligarh (400 KV) & 220 KV Khair-Meetai line
Excavation of B and C type tower foundation including all earth work , backfilling, levelling etc.
Stub setting of stubs including all foundation work but excluding cost of concereting and excavation.
Making of joint of Zebra conductor of all 6 phases between tower location No. 79 A to 01 of 220 KV Khair-Aligarh (400 KV) & 220 KV Khair-Meetai line by tension fittings for making joint and pressing by hydraulic compressor of proper dia.
Cost of concreting of 220KV DC 'B' & 'C' tower foundation including cost of cement, dewatering shorting and shuttering formig , curing but excluding cost of reinforcment bars with 1:2:4 mix concrete including cost of cement , coarse sand & stone ballasr etc as per details given below.
Re-enforcement of steel of B and C Type Towers
Erection of 220 KV, 05 Nos. B type and 03 no. C Type Towers including of all work above ground level excluding hoisting of insulators and including fitting of danger plate , phase plate , number plate and punhing of bolts.
Laying, stringing, tentioning, clamping etc with ACSR Zebra conductor including insulators hoisting, fittings, vibration damper etc. from LOC no. 1(B) to LOC No. 8 (C) for all three phase of both circuits. (Each job includes 06 Nos. conductors) including all others works required to complete the job satifactorily.
Laying, stringing, tensioning, clamping etc with OPGW including fittings, vibration dampers etc. from LOC no. 1(B) to LOC No. 8 (C) including all others works required to complete the job satifactorily.
Tack welding of all nuuts and bolts upto the height of one section of tower or 5 mtrs from the ground level whichever is higher with the tacks at 120 degree separation of minimum 10 mm thickness with 10/12 mm electrode and application zinc rich aluminium paint on the affected surface including cost of all material.
Digging of pit having size 500X500x500mm in mix soil then making of hole of size 30x30x300 cm by using auger in earth for placing galvanized steel pipe of size 35mm dia , 2mm thick and 3 meter long into the pit with common salt and charcoal approx 5kg in each pit, fitting of M.S. earthing strip of size 50x6mm and length 03meter with pipe and tower structure. Fixing and tightening of the earthing strip with electrode at one side and with tower at other side & complete 220 KV pipe type earthing. Champering of nuts and bolts at both the ends to avoid theft.
Carriage of dismantled structure ,conductor used fittings and all materials dismantled from site to 220KV substation Khair Job also include proper stacking of tower parts at 220KV substation Khair with loading and unloading at respected places.
Dehoisting , Dismantalling & other associated works
Dismantling of all 6 phase conductors from tower no. 75 to 79 Work include opening of clamps , armor rods, jumpers etc. Work includes all other works required for satisfactory completion of work asoociated
Dismantling of super structure at following locations including dehoisting of insulators ,number plate, danger plate, and other works necessory for satisfactory completion of work :
75 (DC+5), 76 (A+0), 77 (A+0), 78 (A+0) and 79 (A+0)
De-Stringing of OPGW wire.
Shifting of all dismentalled material to 220 KV S/S Khair
LASHANI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .