Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 LAccepted-Finance | 1 | Accepted-Finance found eligible | |
| 2 | 2₹2.0 L+₹5,900 (3.11%)Accepted-Finance | 2 | Accepted-Finance found eligible | |
| 3 | 3₹2.0 L+₹6,000 (3.16%)Accepted-Finance | 3 | Accepted-Finance found eligible | |
| 4 | 4₹2.8 L+₹94,948 (50.0%)Accepted-Finance | 4 | Accepted-Finance found eligible |
Tender Value
Refer Docs
Closing Date
22 Aug 2022, 2:00 pmClosed
Office of the Executive Engineer MID Akhnoor/Nowsh
Office of the Executive Engineer MID Akhnoor/Nowshera
Strengthening/Improvement of 400 A electric control panel with allied works at LIS Aryanpura.
2022_IFC_181974_1
66/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
60 days
AKHNOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Office of the Executive Engineer MID Akhnoor/Nowsh
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
12 Sept 2022
1 Aug 2022
23 Aug 2022
1 Aug 2022
22 Aug 2022
6 Aug 2022
3 Aug 2022
Strengthening/Improvement of 400 A electric control panel with allied works at LIS Aryanpura.. The job involves disconnecting the power supply and electrical connections by using skilled technician. Shifting of the panel to workshop through manual labour and mechanical transport. The job includes replacement of damaged 400 A MCCB by new 400 A MCCB of reputed make as per IS standards. The job also includes replacement of damaged contactor by new 250 A contactor of reputed make as per IS standards . The job replacement of damaged internal control wiring and bus bars, Voltmeter – 1 no.. Ammeter- 1 No., set of CTs, thimbles, indicator ,taping of all the components . Fitting of all the components in the panel . Shifting of the panel to site of LIS. Providing/fitting of 70 sq mm or equivalent capacity single core copper cable( 30 mtrs.) from panel to starter no. 01 .Making of Electrical connections and testing the panel on load. Complete job includes cost of providing/ fitting ,transportation charges ,hire charges of tool and tackles charges, hire charges of skilled and unskilled labour, and all kinds of taxes thereof. complete job
Supply/ installation/ testing and commissioning of 630 ampere main switch at LIS Aryanpura. Job involves disconnecting the power supply and disconnecting the damaged main switch by using skilled labour and suitable tools & tackles. Providing /fitting of new 630 Ampere main switch of reputed make. Providing / fitting of new thimbles duly crimped and taped. . Complete job includes cost of material, labour charges, manual handling, transportation charges and hiring charges of tools and tackles
M/s RK Elect. Mech. Engg and fabrication works
M/S UK MECH AND ELECT ENGG WORKS
NACHIKETA TECHNOLOGY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .