Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A 24 PATRAKAR COLONY ASHOK NAGAR ALLAHABAD UTTAR PRADESH 211001 | PRAYAGRAJ | UTTAR PRADESH | 211001 | Admitted-Finance |
| 2 | Admitted-Finance MAHARSHI MEHNAGAR KALINI SIRSA ROAD DISTRICT BUDAUN | BUDAUN | BUDAUN | UTTAR PRADESH | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.4 L
EMD Value
₹2,000
Closing Date
2 Apr 2025, 1:00 pmClosed
EE ETD Mathura
132 KV S/S Aurangabad Mathura
Work of Carriage of Miscellaneous Material from Different Substation Under TSW Agra to 132 KV S/S Kosikalan and 132 KV S/S Mathura-II under ETD, Mathura
2025_UPTCL_1013291_1
ET-17/ETD(M)/24-25
Open Tender
Electrical Works
Lump-sum
30 days
Under ETD Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD Mathura
₹2,000
4 Apr 2025
3 Mar 2025
3 Apr 2025
3 Mar 2025
2 Apr 2025
3 Mar 2025
Amount
132 KV S/S Mathura-II
Safely loading of MS Flat (75x10 mm/50x6 mm) and MS Round 40 mm from 132 KV Vrindavan into loading vechicle with the help of man power and unloading its at 132 KV substation Mathura-II under ETD Mathura. Work also includes carriage of MS Flat and MS round from 132 KV S/S Vrindavan to 132 KV Substation Mathura-II including cost of carrige and T&P Man power and other miscellenous charges for completing the work satisfactorily (Approx distance 40 Km)
Safely loading of Control cable Drum from 220 KV S/S Vrindavan into loading vechicle with the help of man power and unloading its at 132 kv substation Mathura-II under ETD Mathura. Work also includes carriage of Control cable Drum from 220 KV S/S Vrindavan to 132 kv substation Mathura-II including cost of carrige and T&P Man power and other miscellenous charges for completing the work satisfactorily (Approx distance 40 km)
Safely loading of 02 Nos 145KV Bus Isolator & 01 Nos 145 KV Tandam Isolator from 220KV S/S Bah Under ETD-III, Agra into loading vechicle with the help of man power and unloading its at 132 KV substation Mathura-II under ETD Mathura. Work also includes carriage of 02 Nos 145KV Bus Isolator & 01 Nos 145 KV Tandam Isolator from 220KV S/S Bah Under ETD-III, Agra to 132 KV Substation Mathura-II including cost of carrige and T&P Man power and other miscellenous charges for completing the work satisfactorily. (Approx distance 140 KM)
Safely loading of 03 Nos 36 KV CT/PT/LA from 220 KV Substation Gokul into loading vechicle with the help of hydra/ man power and unloading its at 132 KV S/S Mathura-II under ETD Mathura. Work also includes carriage of 36 KV CT from 220 KV S/S Gokul to 132 KV S/S Mathura-II including cost of carrige and T&P Man power/ hydra and other miscellenous charges for completing the work satisfactorily (Approx distance 60 km)
Safely loading of 03 Nos 36 KV Isolator 2000A from 220 KV Substation Gokul into loading vechicle with the help of hydra/ man power and unloading its at 132 KV S/S Mathura-II under ETD Mathura. Work also includes carriage of 36 KV Isolator 2000A from 220 KV S/S Gokul to 132 KV S/S Mathura-II including cost of carrige and T&P Man power/ hydra and other miscellenous charges for completing the work satisfactorily (Approx distance 60 km)
Safely loading of 01 Nos Drum ACSR Panther Conducotr / 01 Nos Drum Zebra Conductor from 220 KV Substation Vrindavan into loading vechicle with the help of hydra/ man power and unloading its at 132 KV S/S Mathura-II under ETD Mathura. Work also includes carriage of ACSR Panther/Zebra Conductor from 220 KV S/S Vrindavan to 132 KV S/S Mathura-II including cost of carrige and T&P Man power/ hydra and other miscellenous charges for completing the work satisfactorily (Approx distance 60 km)
132 KV S/S Kosikalan
Safely loading of Control cable Drum from 220 KV S/S Kirawali into loading vechicle with the help of man power and unloading its at 132 kv substation kosikalan under ETD Mathura. Work also includes carriage of Control cable Drum from 220 KV S/S Kirawali to 132 kv substation kosikalan including cost of carrige and T&P Man power and other miscellenous charges for completing the work satisfactorily (Approx distance 120 km)
Safely loading of 01 Nos 145 KV Bus/Line Isolator from 220KV S/S Bah Under ETD-III, Agra into loading vechicle with the help of man power and unloading its at 132 KV substation Kosikalan under ETD Mathura. Work also includes carriage of 01 Nos 145KV Bus/Line Isolator from 220KV S/S Bah Under ETD-III, Agra to 132 KV Substation Kosikalan including cost of carrige and T&P Man power and other miscellenous charges for completing the work satisfactorily. (Approx distance 180 KM)
Safely loading of 01 Nos 145 KV SF-6 Circuit Breaker from 132 KV S/S Mathura-II into loading vechicle with the help of man power and unloading its at 132 KV substation Kosikalan under ETD Mathura. Work also includes carriage of 01 Nos 145KV SF-6 Circuit Breaker from 132 KV S/S Mathura-II to 132 KV Substation Kosikalan including cost of carrige and T&P Man power and other miscellenous charges for completing the work satisfactorily. (Approx distance 65 KM)
Commissioning of SF6 145KV CB work includes fitting of SF6 pipe line, filling of sf6 gas making vccum in the pole for proper commisiong of CB ABB/ Seimens make as per satisfactorily completion of job as per direction of supervising engineer. Work include providing of O rings etc consumable material also.
GANGOTRI CONSTRUCTION (BID ID -5097655)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .