Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC AT KATHARA PO KATHARA DIST BOKARO JHARKHAND | KATHARA | BOKARO | JHARKHAND | L1 | Accepted-AOC All documents submitted and found O.K. Comparative lower rate. | |
| 2 | Rejected-Technical AT KHUDGADDA NEW BASTI SAWANG BOKARO JHARKHAND 829128 | BOKARO | BOKARO | JHARKHAND | 829128 | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical AT KATHARA P O KATHARA BOKARO JHARKHAND 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | - | Rejected-Technical L3 |
Tender Value
₹2.4 L
EMD Value
₹3,000
Closing Date
26 Sept 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Amit Kumar, Dy. Manager(CP), Sawang Washery
Office of the Project Officer, Sawang Washery.
Repairing/rewinding of different types and different capacity of induction motors, Volt-415, 3Phase (i) 02 nos., 31KW, RPM-1480 Induction Motor Sl. No. 348091602 and 348091604 (ii) 25KW, RPM-1480, Volt-415 Induction Motor Sl. No. 12201002 (iii) 18.5K
2023_CCL_288835_1
SGW/KTA/ENM/E-Tender/23-24/50 Date 15.09.2023
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Office of the Project Officer, Sawang Washery.
Please refer Tender documents.
9 documents required · 9 mandatory
₹3,000
11 Nov 2023
15 Sept 2023
27 Sept 2023
16 Sept 2023
26 Sept 2023
16 Sept 2023
16 Sept 2023 - 21 Sept 2023
Amount
A. 31 KW, RPM-1480, Volt-415, Induction Motor, Sl. No. 348091602 & 348091604 (i) Super enamel copper wire SWG-17 (Total Wire 48 Kg. (-) Less: Scrap value 60% = 19.2 Kg.
(ii) Insulation cost 15% of Total Wire 48 Kg.
(iii) Labour Charge 15% of Total Wire 48 Kg.
(iv) Other materials lead wire 50 sq.mm.
B. 25KW, RPM-1480, Volt-415, Induction Motors, Sl. No. 12201002 i) Super enamel copper wire SWG-18 (Total Wire 35 Kg. (-) Less: Scrap value 60% = 14 Kg.
(ii) Insulation cost 15% of Total Wire 35 Kg.
(iii) Labour Charge 15% of Total Wire 35 Kg.
(iv) Other materials lead wire 50 sq.mm.
C. 18.5KW, RPM-970, Volt-415, Induction Motors, Sl. No. M9607340 i) Super enamel copper wire SWG-18 (Total Wire 32 Kg. (-) Less: Scrap value 60% = 12.8 Kg.
(ii) Insulation cost 15% of Total Wire 32 Kg.
(iii) Labour Charge 15% of Total Wire 32 Kg.
(iv) Other materials lead wire 35 sq.mm.
D. 15KW, RPM-970, Volt-415, Induction Motors, Sl. No. 192580 i) Super enamel copper wire SWG-19 (Total Wire 24 Kg. (-) Less: Scrap value 60% = 9.6 Kg.
(ii) Insulation cost 15% of Total Wire 24 Kg.
(iii) Labour Charge 15% of Total Wire 24 Kg.
(iv) Other materials lead wire 35 sq.mm.
E. 12.5KW, RPM-1470, Volt-415, Induction Motors, Sl. No. WNP i) Super enamel copper wire SWG-19 (Total Wire 22 Kg. (-) Less: Scrap value 60% = 8.8 Kg.
(ii) Insulation cost 15% of Total Wire 22 Kg.
(iii) Labour Charge 15% of Total Wire 22 Kg.
(iv) Other materials lead wire 35 sq.mm.
Contractor Profit
Total impact of GST for the purpose of CTC
M/S S K ELECTRICAL
STAR ELECTRICAL WORKLS
techsummary_299126.pdf
PDF • 1.15 MB
finsummary_299126.pdf
PDF • 1.15 MB
Award50.pdf
PDF • 1.34 MB
finance_299126.pdf
PDF • 0.23 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .