Loading…
Loading…
| Sl No | Description | Qty | Unit | Samaraj L1 | K.RAJA L2 |
|---|---|---|---|---|---|
| 1.001. Strengthening of Road fromMukkuthivattam Chinnamookanur to parisanvattam H/O Chinnamookanur Km/0/0-0/710 | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp (km 0/0 - 0/710 | 639 | sqm | - | - |
| 3.00 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A | 255 | sqm | - | - |
| 4.00 | Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% | 85.2 | Cum | - | - |
| 5.00 | Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (km 0/0 - 0/710 | 710 | sqm | - | - |
| 6.00 | Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER (km 0/0 - 0/710 | 159.75 | Cum | - | - |
| 7.00 | Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc | 2,130 | sqm | - | - |
| 8.00 | Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials (km 0/0 - 0/710 | 2,130 | sqm | - | - |
| 9.00 | Provision for HM stone | 3 | Each | - | - |
| 10.00 | Provision for Name Board | 1 | Each | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
22 Jan 2020, 3:00 pmClosed
The Project Director
DRDA,Vellore
Vellore District SCPAR 2019-20 Strengthening of 10Road in Jolarpet Block Package No.26
2019_RDTN_149881_1
A8/4680/2019
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.1 L
1 Feb 2020
30 Nov 2019
22 Jan 2020
30 Nov 2019
22 Jan 2020
30 Nov 2019
Amount
1. Strengthening of Road fromMukkuthivattam Chinnamookanur to parisanvattam H/O Chinnamookanur Km/0/0-0/710
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp (km 0/0 - 0/710
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A
Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100%
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (km 0/0 - 0/710
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER (km 0/0 - 0/710
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials (km 0/0 - 0/710
Provision for HM stone
Provision for Name Board
2. Strengthening of Road from Killakumedu village to Kuooanur road Kalnarsampatti Km/0/0-0/780
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp (km 0/0 - 0/670
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A
Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100%
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (Km 0/0 -0/780
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER 0/0 -0/780
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials (km 0/0-0/780
Construction of Retanning Wall
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Provision for HM stone
Provision for Name Board
3. Strengthening of Road from Paniyandapalli road to Sengunrapattarai H/O Paniyandapalli Km 0/0-0/600
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp (km 0/0 - 0/810)
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A
Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100%
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (Km 0/0-0/600
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER (Km 0/0 -0/600
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials (km 0/0 - 0/600
Provision for HM stone
Provision for Sign Board
Provision for Name Board
4. Strengthening of Road fromNH to Nagachari vattam H/O Vellkalnatham Km/0/0- 0/425
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp (km 0/0 - 0/710)
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A
Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100%
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (Km 0/0-0/425
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER 0/0-0/425
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials (km 0/0-425
Provision for HM stone
Provision for Name Board
5. Strengthening of Road fromAgraharam Malaiadivaram to srinivasa perumal H/O Agraharam Km 0/0 -0/700
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. compKm 0/0 -0/700
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A
Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100%
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete Km 0/0 -0/700
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER 0/0 -0/700
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials 0/0 -0/700
Construction ofRetanning Wall
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Provision for HM stone
Provision for Name Board
6. Strengthening of Road from Puthu koil service road to Community hall H/O Bedhakallupalli Km 0/0-0/250
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. compKm 0/0-0/250
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A
Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100%
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete Km 0/0-0/250
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER (Km 0/0 -0/600
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials Km 0/0-0/250
Provision for HM stone
Provision for Name Board
7. Strengthening of Road fromChandrapuram road to Ponnanvattam road H/O Chandrapuram Km0/0 -0/450
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. compKm0/0 -0/450
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A
Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100%
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete Km0/0 -0/450
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER 0/0-0/640
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials Km0/0 -0/450
Provision for HM stone
Provision for Name Board
8. Strengthening of Road fromthikachivattam to jolarpet limit H/O Ammaiyappn nager Km/0/0-0/800
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp Km/0/0-0/800
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A
Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100%
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete Km/0/0-0/800
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER Km/0/0-0/800
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials Km/0/0-0/800
Provision for HM stone
Provision for Sign Board
Provision for Name Board
9. Strengthening of Road fromKuppanvattm to Madha Kovil H/O Chinnaveppampattu Km/0/0-0/640
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp (km 0/0 - 0/640)
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A
Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100%
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete (Km 0/0 -0/640
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER 0/0-0/640
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials (km 0/0-0/800
Provision for HM stone
Provision for Name Board
10. Strengthening of Road fromPoompallam road H/O Velakkalnatham Km 0/500-1/0
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. compKm 0/500-1/0
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 A
Providing and laying gravel to 100mm compacted thick including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100%
Picking the existing wornout BT surface to 5-10 cm thick including all labour charges etc complete Km 0/500-1/0
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER (Km 0/500 - 1/0
Applying tack coat over WBM surface at 4 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials Km 0/500-1/0
Provision for HM stone
Provision for Name Board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.RAJA
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_180423.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .