| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.0 LAccepted-AOC 201 2ND FLOOR IRIS TECH PARK SECTOR 48 SOHNA ROAD GURGAON 122018 HARYANA | GURUGRAM | HARYANA | 122018 | L1 | Accepted-AOC Tender alloted to the agency. | |
| 2 | L2₹99.0 L+₹5,816.74 (0.06%)Rejected-Finance 1077 SECTOR 16 AND 17 125001 | HISAR | HISAR | HARYANA | 125001 | L2 | Rejected-Finance Rate on Higher side |
Tender Value
₹96.9 L
EMD Value
₹1.9 L
Closing Date
14 Feb 2022, 5:00 pmClosed
Executive Engineer Bhiwani/Superintending Engineer
PWD B and R office Bhiwani
Special repair by providing Wdg./Stg. DBM and BC on Dinod Gate to Rohtak Gate road from Km. 0.00 to 1.920 in Bhiwani District. (Road ID No. 2229).
2022_HRY_205432_1
BWN/Rs. 96.90 lacs/Dinod Gate to Rohtak Gate
Open Tender
Civil Works - Roads
Works
180 days
Bhiwani
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹1.9 L
22 Mar 2022
25 Jan 2022
15 Feb 2022
25 Jan 2022
14 Feb 2022
25 Jan 2022
Amount
Dismantling of road including, soiling and wearing coat, screening and stacking of old serviceable material, complete in all respect. (Based on HSR 17.3) (Dismantling upto 300 mm)
Demolishing cement concrete manually/ by mechanical means including disposal of material with all lead and lift as per direction of Engineer - in - charge. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) (Based on HSR 5.23.2)
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. (HSR 5.70)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - C C 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded stone aggregate 20 mm nominal size) (HSR 6.1.2)
Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (HSR 7.21.1)
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) (HSR 11.5.3)
Applying one coat of water hinnable cement primer of approved brand and manufacture on wall surface Water thinnable cement primer Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade (HSR 11.67.1+11.78)
Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size). (HSR 13.1.1)
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications (HSR 17.5.3)
Construction of Embankment (for berms) with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications (Based on HSR 17.6) Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Excavation for roadwork in soil by manual/mechanical means including cutting , trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including breaking of clods and disposal within ROW as per technical clause 301 of MORT&H specifications.(HSR 17.74)
Providing & laying 150 mm Granular Sub-Base with Coarse Graded Material - Grading-I (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material (Based on HSR 17.15.1) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying WBM (G-I) (63 mm to 45 mm with screening Type “A” 75 mm each layer) , spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying WBM (G-II) (53 mm to 22.4 mm with screening Type “B” 75 mm each layer) , spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and applying primer coat with bitumen emulsion(Grade-I) @ 0.60 kg per sqm on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications (Based on HSR 17.25)
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (Based on HSR 17.26.2)
Providing and laying 30 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications.(HSR 17.31.4) Note: If bitumen required is this account more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work.
Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications (Based on HSR 17.30.2) Note: If bitumen required is this account more than 4.5% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work.
Milling on Bituminous Surface: Dismantling of existing damaged Bitumen surface by cold Milling Machine up to any depth and hauling the milled material up to any lead and stacking at nearest recycling Plant site (HSR 17.43.2)
Construction of 100 mm dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing, as per clause 601 of MORT&H specifications. (HSR 17.44) Note: - Minimum cement content for this item will be 150 kg. per cum of concrete as per approved job mix formula. If the cement content is more than 150 kg /cum, then the extra cement will be incidental to work and nothing shall be payable on this account.
Providing and laying of cement concrete blocks of size 0.450 m x 0.300 m x 0.15 m of cement concrete M30 grade and spreading 25 mm thick sand underneath filling joints with sand on existing W.B.M. base as per technical specification clause 1503 (HSR 17.66.1)
Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect.(HSR 17.69.2)
Removal of existing IPB by manual means and disposal of dismantled material with all lifts and up to a lead of 1000 m as per technical specification clause 202.3 (HSR 17.70)
Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 1 OOmm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 (HSR 17.71)
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. (HSR 34.26) Note:- Before start of work the contractor shall give brand , batch no. , manufacturing date of the material to be used and get approved thbe same from Engineer-In-Charge before use.
Painting on Steel Surfaces Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade (HSR 34.50)
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- (i) Stone Metal @ Rs 582/- P.cum
(ii) Bitumenious work @ 2042/- P.Cum. Note: All quantities of the below materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. Note:- Basic rates mentioned in BOQ are inclusive of all taxes (i/c GST), duties, cess, royalties etc. In case of any difference in the unit & nomenclature of any of the HSR Items depicted in this DNIT and that given in HSR, the unit and nomenclature given in HSR shall be applicable.
M/s Hisar Construction Company
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .