| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | +0.00% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.1 LAdmitted-Finance 5 8 DAKSHINPARA ROAD KOLKATA KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | +1.50% | ₹5.1 L | L2 | Admitted-Finance |
| 3 | L3₹5.1 LAdmitted-Finance | +3.00% | ₹5.1 L | L3 | Admitted-Finance |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
24 Feb 2026, 2:00 pmClosed
EE/TPS
Tallah Pupming Station 71 B. T Road Kolkata -2
CONSTRUCTION OF PAVEMENT FROM ISOLATION VALVE TO TRANSFORMER ROOM OF STATION NUMBER THREE AT TALLAH PUMPING STATION
2026_KMC_1001621_1
KMC/WS/TPS/92/2025-2026
Open Tender
CIVIL WORKS
30 days
Tallah Pupming Station 71 B. T Road Kolkata -2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
15 May 2026
11 Feb 2026
26 Feb 2026
11 Feb 2026
24 Feb 2026
11 Feb 2026
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 8. Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth
BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR AND REHABILITATION WORKS?(b) Applying 2 coats of Non-Toxic Acrylic Polymer modified Paint having adhesive & waterproofing properties by mixing in proportion (1 liquid: 4 cementitious material) or as per manufacturer's specification for water proofing layer in water tank etc. (No Departmental Cement is required)
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
BUILDING WORKS ( C ) Brickworks,Concrete Works etc 10?. Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 18)Fitter Mechanic (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 19) Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared)
Sub Total
L.W.Cess @1%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
tbid92.pdf
Tender Documents • 0.49 MB
BOQ_2454340.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid