Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
27 Jun 2024, 5:00 pmClosed
S.E. E D C- MVVNL,Unnao
Superintending Engineer Electricity Distribution Circle-Unnao
QUANTUM OF WORKS INVOLVED IN construction of new 11 KV/LT line and LT S/s for G/S to different consumers (For load upto 50 KW) and different works under the full deposit scheme under the area of E.D.S.D.
2024_MVVNL_931428_1
42/E.D.C./Unnao/2024-25
Open Tender
Electrical Works
Fixed-rate
180 days
Unnao
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,180
A/C-No.3355002101008374,IFSC-Code-PUNB0335500
₹3,000
24 Jul 2024
21 Jun 2024
28 Jun 2024
21 Jun 2024
27 Jun 2024
21 Jun 2024
Amount
Carriage of following materials from store center Unnao to dump site with loading, unloading and proper stocking. Distance as per indent placed by concered Executive Engineer.
PCC/ST pole of diff. Size.
Other loose line Material with including diss. Size of condutor, Single and double pole accessories, complete stay & earthing insulator, X-arm, etc.
ACSR Weasel/Rabbit/Dog Conductor/A.B. Cable of diff. Sizes.
Three phase/Single phase A.B. cable of diff. size for LT line
Carriage of following T/F from Elec. Store Center Unnao to diff. work dump site along with loading unloading and proper stocking distance as per indent.
T/F 25 KVA /63 KVA/100 KVA
Fabrication/Modification of MS Items/Nuts & bolts as requirement of site condition.
Erection of PCC/ST Pole including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site.
Supply & Fixing of following materials for above job-
11 KV F clamp with N&B
Cross Arm Holding clamps
Erection of PCC/ST DoublePole including digging of pits, fitting of accessories along with cartage & dragging from dump site to pits site.
Supply & Fixing of following materials for above job-
Clamp for Top and dropper channel with N &B
Making T-off arrangement including fabrication & fitting accessories
Supply & Fixing of following materials for above job-
Holding clamp for T-off Channel with N&B
Supply & Fixing of 3-phase fuse unit system for T/F protection at double pole
Grouting of PCC/ST Poles as per RESPO norms with grouting material.
Earthing as per RESPO Norms
Digging of pits, fixing nuzzling and grouting of stay rodsas per RESPO Norms with grouting materials.
Supply & Fixing of following materials for above job-
Stay Clamp with N&B
Laying of stringing and sagging of O/H 11 KV line three phase by conductor including all associated works with joints/jumpers and binding of insulator as required.
Laying of stringing and sagging of O/H three phase L.T. line by ABC of diff. size including all associated works with joints/jumpers and binding of insulator as required.
Supply & Fixing of following materials for above job-
L.T.clamp with nuts & bolts
L.T. Shackle insulator
Bols & nuts for shackle
Fixing of 3-Ph Distribution Box with clamp, N & B with complete all work as required. (All the required materials as DB box clamps, Piercing Connectors, Nut & Bolt etc. for this job shall be provided by the contractor eccept Distribution Box)
Supply & Fixing of following materials for above job-
Clamp for distribution Box with nut & bolt
Piercing Connector
Mounting of following Transformer on double pole including its cartage and dragging from dump site to pit site & installation and commissioning of T/Fs and All the jumpering & connection with the system are included in the scope of work. (All the required materials as 04 nos.-Al. Lugs for each T/F, Nut & bolts for S/S Angle etc for this job shall be provided by contractor except T/Fs and LT PVC Cable)
T/F 25 KVA /63 KVA/100 KVA
33 KV/11 KV cable hosting including jumpering etc. complete work with help of G.I. pipe as per RESPO Norms 9G.I. pipe and other required material shal be provided by the contractor)
Cutting of tree branches lying in the route of making new 11 KV/LT line
NOTE:- (1) All the material provided by contractor shall be as per norms of UPPCL/RESPO. (2) One carriage including loading/unloading from dump site to pit site is included in scope of work. (3) During execution of work al risk will be of the contractor. (4) Contractor will provide al T & P, vechile and man power. (5) All the old and used material should be taken on book. (6) The quantity may be vary ± 20%.
M/S NEW MAA KALYANI TRADERS
M/s PRAMENDRA SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .