Loading…
Loading…
Tender Value
₹4.4 L
EMD Value
₹4,400
Closing Date
13 Feb 2026, 2:30 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer R and B division Sathupally
o/o Executive Engineer R and B division beside court main road Sathupally
FDR by Patch work on Burugudem to Lankapally road from Km 14/0 to 16/4 in Khammam District (3rd Call).
679789
NIT No.21/1/TS/TO/EE/R&B/SPL/2025-26/ Date : 09.02.2026
OPEN
Road Work
KHAMMAM, TELANGANA
8 documents required · 7 mandatory · 1 optional
₹156
₹4,400
10 Feb 2026
10 Feb 2026
10 Feb 2026
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.
Providing B.T.Patch work for pot holes of depth ranging from 50-70mm using 40mm HBG machine crushed metal with required quantity of 10-12mm size HBG machine crushed key chips and bitumen 80/100 grade at 42Kgs/Cum of work for filling the pot holes including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacing and finishing and binding the surface using stone dust/sand including cost of all materials, T&P and labour charges for all operations etc.complete
Providing B.T. Patchwork for pot holes of depth ranging from 25 to 35mm, using 20-25mm HBG metal with required quantity of 10-12mm size HBG key chips and 80/100 grade Bitumen at 70 kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole,including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labour charges for all operations etc. complete.
Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved and borrowed at an average lead of 1Km. soil and compacting with appropriate equipment as per MORTH Sp.No.3003.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
B L 14 to 16(1)(3).xlsx
TENDER_DOCUMENT • 0.89 MB
BID B L 14 to 16(1)(3)(1).docx
TENDER_DOCUMENT • 0.15 MB
Download all tender documents and submit your bid