| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.2 LAccepted-AOC C 8 78A KESHAV PURAM DELHI 110035 | DELHI | NORTH WEST DELHI | DELHI | 110035 | ₹72.2 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹73.8 L+₹1.7 L (2.34%)Rejected-AOC | ₹73.8 L+₹1.7 L (2.34%) | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹77.0 L+₹4.8 L (6.65%)Rejected-AOC | ₹77.0 L+₹4.8 L (6.65%) | L3 | Rejected-AOC Third lowest |
| 4 | L4₹78.7 L+₹6.6 L (9.12%)Rejected-AOC NO 115 KAMARAJAR NAGAR PUDUPATTINAM KALPAKKAM 603102 | CHENGALPATTU | TAMIL NADU | 603102 | ₹78.7 L+₹6.6 L (9.12%) | L4 | Rejected-AOC Fourth Lowest |
| 5 | Rejected-Technical | - | - | Rejected-Technical The bidder is disqualified on account of not meeting the financial eligibility criteria as stipulated in NIT |
| Sl No | Description | Qty | Unit | RR ENTERPRISES L1 | A.V.Mohandas Contractor L2 | K.GANESH L4 | R VEERARAGHAVAN L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in open/ Surface Excavation not exceeding 300mm in depth but exceeding 1.5m in width as well as 10 sqm on plan in all types of soil, mixture of gravel and disintegrated rock, hard stiff clay including grading and levelling neatly by breaking clods, disposal of excavated earth upto 50m lead & lift upto 1.5m, (Disposed soil to be levelled by breaking clods, if any and neatly dressed) etc., all complete as per specifications. | 1,120 | Sq.m | 140 ₹1,56,800 | 80 ₹89,600 Lowest | 400 ₹4,48,000 | 90 ₹1,00,800 |
| 2.00Earthwork excavation by mechanical means (Hydraulic excavator)/manual means for foundations, trenches, etc., not exceeding 1.5m in width or 10 sqm on plan in hard gravelly soil and other types of soil including bailing of water, if necessary, dressing of sides, levelling and ramming the bottom of trenches, refilling the sides of foundation as required with selected excavated earth and depositing/disposing the surplus earth (Disposed soil to be levelled by breaking clods, if any and neatly dressed) with lift upto 1.5m and within a lead of 50 metres, etc., all complete as per specifications and as directed. | |||||||
| 2.10 | All kinds of soil upto 1.50mtr depth | 300 | Cu.m | 500 ₹1,50,000 | 350 ₹1,05,000 Lowest | 500 ₹1,50,000 | 550 ₹1,65,000 |
| 3.00Earthwork in open Excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) in all types of soil, mixture of gravel, disintegrated rock, hard stiff clay, soft rock, hard rock including bailing of water, if necessary, dressing of sides, shoring, benching, levelling and ramming the bottom surfaces, with lift as given below and disposal of excavated earth within a lead of 50 metres, etc., all complete as per specifications and as directed by the Engineer-in-Charge. | |||||||
| 3.10 | All kinds of soil - Upto 1.5 mtr depth from AGL | 150 | Cu.m | 550 ₹82,500 | 370 ₹55,500 Lowest | 400 ₹60,000 | 600 ₹90,000 |
| 4.00 | Excavating trenches of required width by mechanical means (Hydraulic excavator)/ manual means for pipes, cables etc., for depth upto 1.5m in all kinds of soil including excavation for sockets, dressing of sides, ramming of bottoms, getting out the excavated soil and then refilling the soil as required in layers not exceeding 200mm in depth, consolidating each deposited layer by ramming, watering etc., and disposing of surplus excavated soil as directed within a lead of 50m, (Disposed soil to be levelled by breaking clods, if any and neatly dressed) etc., all complete as per specification. | 190 | Cu.m | 600 ₹1,14,000 | 450 ₹85,500 Lowest | 500 ₹95,000 | 650 ₹1,23,500 |
| 5.00 | Earthwork excavation for trial pits of required size in hard gravelly soil and other types of soil upto 1.50 mtr. depth without damaging the existing underground service lines including shoring, strutting, bailing of water, protection of existing underground utilities such as water line, service cables, etc., refilling the sides of trial pit as required with selected excavated earth and depositing / disposing the surplus earth (Disposed soil to be levelled by breaking clods, if any and neatly dressed) with a lead of 50 metres and finishing the surface to proper level etc., all complete as per specifications and as directed by Engineer- in-Charge. | 15 | Cu.m | 500 ₹7,500 | 400 ₹6,000 | 250 ₹3,750 Lowest | 600 ₹9,000 |
| 6.00 | Filling available selected excavated earth (excluding rock) in trenches, plinth, sides of foundation, etc., in layer not exceeding 200 mm in depth including consolidating each deposited layer by ramming and watering, lead upto 3km and lift upto 1.5m etc., all complete as per specification. | 90 | Cu.m | 425 ₹38,250 Lowest | 890 ₹80,100 | 1,100 ₹99,000 | 500 ₹45,000 |
| 7.00 | Area cleaning in and around the site by cleaning the bushes, debris, fallen trees, waste materials, garbages etc., collecting, conveying and disposing the same at places as shown by the department with in a lead upto 2.0Km, etc., all complete as per specifications and as directed. | 750 | Sq.m | 10 ₹7,500 | 10 ₹7,500 | 5 ₹3,750 Lowest | 10 ₹7,500 |
| 8.00Cutting and felling trees of the girth (measured at a height of 1m above ground level) including cutting of trunks, branches, removing the roots, stacking of serviceable materials and disposal of unserviceable materials within a lead of 200m including filling the pits and depression with excavated earth, etc., all as directed by Engineer-In-Charge. | |||||||
Tender Value
₹77.8 L
EMD Value
₹1.6 L
Closing Date
18 Dec 2025, 3:00 pmClosed
Chief Engineer, CEG, GSO
GSO Annex building, Kalpakkam - 603102
Improvement of road works from Sadras Gate to AECS -II School in Kalpakkam Township.
2025_GSO_886590_1
GSO/CTC/CEG/272/2025
Open Tender
Civil Works
Item Rate
180 days
Kalpakkam
As stipulated in NIT/tender
8 documents required · 8 mandatory
₹0
₹1.6 L
25 Mar 2026
28 Nov 2025
19 Dec 2025
28 Nov 2025
18 Dec 2025
12 Dec 2025
29 Nov 2025 - 10 Dec 2025
Earthwork in open/ Surface Excavation not exceeding 300mm in depth but exceeding 1.5m in width as well as 10 sqm on plan in all types of soil, mixture of gravel and disintegrated rock, hard stiff clay including grading and levelling neatly by breaking clods, disposal of excavated earth upto 50m lead & lift upto 1.5m, (Disposed soil to be levelled by breaking clods, if any and neatly dressed) etc., all complete as per specifications.
All kinds of soil upto 1.50mtr depth
All kinds of soil - Upto 1.5 mtr depth from AGL
Excavating trenches of required width by mechanical means (Hydraulic excavator)/ manual means for pipes, cables etc., for depth upto 1.5m in all kinds of soil including excavation for sockets, dressing of sides, ramming of bottoms, getting out the excavated soil and then refilling the soil as required in layers not exceeding 200mm in depth, consolidating each deposited layer by ramming, watering etc., and disposing of surplus excavated soil as directed within a lead of 50m, (Disposed soil to be levelled by breaking clods, if any and neatly dressed) etc., all complete as per specification.
Cutting and felling trees of the girth (measured at a height of 1m above ground level) including cutting of trunks, branches, removing the roots, stacking of serviceable materials and disposal of unserviceable materials within a lead of 200m including filling the pits and depression with excavated earth, etc., all as directed by Engineer-In-Charge.
Beyond 300mm girth upto and including 600mm girth.
Beyond 600mm girth upto and including 1200mm girth.
Trimming of tree branches, which causing hindrance to free vehicle movement, blocking street light and touching the building etc., on road sides, avenues, streets and near buildings, including cutting the branches of trees using necessary tools, collecting, transporting and disposing them at places shown by the department using their own means of conveyance all as directed by the Engineer-in- charge.
Beyond 300mm upto and including 600mm Girth Trees
1 : 3 : 6 (1 cement : 3 sand : 6 graded stone aggregate 40mm nominal size)
Providing and laying in position of plain cement concrete using hard granite broken stone in foundations, trenches etc. including mechanical mixing, ramming, compaction, leveling, curing, dewatering, if any including the cost of formwork etc., all complete as per specifications.
Providing, erecting, placing in position and removing Formwork for all insitu concrete works at all lifts and all shapes such as circular works, chamfers, splays, etc., using Steel / Plywood shuttering including centering, scaffolding, strutting, propping with necessary bracing in all areas, fixing of EPs, cutting holes and fixing pipe sleeves, applying of approved form oil over surface in contact with concrete, de-shuttering after specified curing period, etc., all complete as per drawings and specifications. [Note : Measurement for the formwork shall be the area of forms in contact with concrete surfaces. Stop boards for construction joints will not be measured seperately for payment. Centering and shuttering where exceeding 3.5m height in one floor shall be measured and paid for seperately.]
For Plain Surfaces upto 3.5m Lvl
Providing and casting insitu Reinforced Cement Concrete of the following grades of design mix by Weigh batching using machine crushed hard broken granite stone of nominal size 20mm including cost of admixtures in recommended proportion wherever required, mechanical mixing, transporting, placing at all lifts, vibrating, consolidation, curing, finishing smooth all exposed faces, for all insitu concrete items, etc., as per drawings and specifications. Note : 1) The rate quoted shall be exclusive of reinforcement and formwork which will be paid for separately under relevant items. 2) The rate of concrete shall include the cost of admixture in recommended proportions as per IS 9103 as per direction of Engineer-in-charge. 3) Cement proportion for Concrete Mix shall be on the basis of weigh batching only as per design mix. 4) The cost towards any upward / downward variation required to obtain the specified strength over the minimum cement content will be paid for or deducted at the rate specified in Schedule 'F'.
M 30 Grade Concrete (The Cement content considered is 370 Kg per Cu.m) - Upto FFL
Providing, hoisting and fixing in position 50mm thick Precast RCC jali at all lifts of approved pattern and size as per drawing with cement concrete 1 : 2 : 4 including required nominal reinforcement, curing, smooth finished surface with float coat of neat cement on all sides, fixing and jointing with CM 1:3, scaffolding etc., all complete as per drawing and specification.
Providing and laying Random Rubble masonry at all levels using hard granite stones retrieved RR stone from dismantling RR masonry in Cement mortar 1 : 6 (1 cement: 6 coarse sand) including collecting, cleaning the old mortar, sunk/flush points in CM 1:3, in foundation and plinth obtained from approved quarry including bond stones of 2 Nos/Sq.m at 1.5 to 1.8 mtrs apart, raking out joints, curing, etc., all as per standard specification. (Note: Required quantity of RR Stone will be supplyed by department at free of cost.)
Providing and constructing 110mm thick brick work for partition walls at al lifts in cement mortar 1:4 using well cured flyash bricks of class 5 (non-modular) made up of using Flyash + Sand + Lime + additves (Gypsum/Cement) with waterproofing chemicals and accelerators confirming to IS-12894 or latest edition including supplying and providing 2 Nos. of 6/8mm MS rod at every third layer, suitable scaffolding, raking out joints, continuos curing for specified period, etc., all complete as per specifications and drawings.
with necessary wood screws for fixing grills / by welding in steel windows, painting with two coats of anti corrosive paint of approved colour and make over a coat of red oxide zinc chromate primer/ zinc phosphate primer, etc., all completed as per specification. [Note: The rate shall be inclusive of lifting arrangements if any required to hoist and concrete embedment's for fixing the steel works.]
Supplying, fabricating and fixing of EPs, Structural Steel work and pipe sleeves etc., at all lifts comprising MS angles, MS plates, tees flats, rounds, squares, other structural steel sections, pipe sleeves and pipes of various sizes, IS channels, IS beams, square rods, etc., of TATA or SAIL or approved equivalent make including cutting, welding, bending to shape, painting exposed faces with two coats of anti-corrosive paint of approved colour over a coat of red oxide zinc chromate primer / zinc phosphate primer, embedding with Cement concrete, etc. complete all as per specifications and drawings. Note: The rate shall be inclusive of lifting arrangements if any required to hoist and concrete embedments for fixing the steel works.
Refixing of existing MS grills/gates using retrieved materials, including necessary cutting, welding, aligning, and fixing to compound walls or RCC column members by providing and welding hinges over embedded plates (EPs) or fixing with anchor fasteners as required, including plastering of damaged wall surfaces, scrubbing of the existing painted MS structural steel members and finishing to match the adjacent surfaces. The exposed steel surfaces shall be painted with two coats of PU metal coat finish paint (MRF or other approved make) over one coat of epoxy zinc phosphate primer, using appropriate thinners (1110 Ep thinner for primer and the recommended thinner for PU finish) as per manufacturer’s specifications. The work includes handling and transportation within a lead of 2 km, and is to be carried out with all necessary tools, consumables, equipment, and labour etc., complete in all respects as directed by the Engineer-in-Charge. Note: Retrieved MS grill/gate/flat will be supplied by the department.
Dismantling Brick work in cement mortar at all lifts including clearing and depositing the debris within a distance of 100 metres
Painting over Plain Plaster at all lifts.
Painting over Roughcast Plaster at all lifts.
Providing and fixing 150mm dia PTMT gratings of "Prayag" or approved equivalent make over the rain water pipes fixing in CM 1:3 as per specifications.
20mm dia. Nominal size
90x25mm PVC Saddle
90mm OD PVC pipe of class-3 (6Kg/Sq.cm)
Supplying laying and jointing of RCC hume pipes with collars of class NP-2 as per IS specifications including aligning to proper level and line as directed at site, jointing with Cement Mortar 1:2, curing, etc., complete as per specification.
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 2.0Km lead as per direction of Engineer-in-Charge
Laying old cement concrete interlocking paver blocks of any design / shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost).
Providing and laying of Wet Mix Macadam (WMM) for Sub-base and base course conforming to clause 406 of MORT&
H Specification for road and bridge works (Fifth Revision) using 53mm downgraded stone aggregate including cost of coarse aggregates, fine aggregate, premixing the Material with water at OMC in mechanical mix plant, carriage of mixed Material by tipper to site, laying in uniform layers with paver/motor grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., all as per specification and as directed by Engineer-in-charge.
Providing and laying factory made precast Kerb stone of M-20 grade cement concrete of size 100mm thick & 500mm ± 50mm depth with suitable interlocking arrangement, top chamfering of size 50x70 mm or as approved size including excavation, conveying, laying the precast kerb blocks in position to the required line, level and curvature, making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), jointing / pointing the joints with cement mortar 1:3, refilling the sides, compacting, making drainage opening wherever required, etc., all complete as per specification and as directed. (Note: Length of finished Kerb edging shall be measured for payment and Precast kerb stone shall be approved by Engineer-in-charge.)
Providing and laying 60mm thick factory made chamfered edge prefabricated cement concrete interlocking Solid / perforated paver block of M-30 grade made by table vibratory method using PU moulded with strong vibratory compaction of approved size, design, shape, laid in required colour and pattern over 50mm thick compacted bed of coarse sand including cost of sand filling, levelling with required slope, ramming the surface, watering, consolidation using vibratory earth rammers, filling the joints with sand, cleaning, etc., all complete as per specification and as directed by the Engineer-incharge.
Supplying and spraying of Tack coat using bituminous emulsion (RS conforming to IS 8887) at the rate of 0.25 Kgs. per Sq.m. on the prepared granular surface including cleaning with wire brushes, small pick axes sweeping with brooms or soft brush and finally dusting with old gunny bags and compressed air to receive bituminous treatment all complete as per specification and as directed.
Grading-II (19 mm nominal size) for 50-75mm Layer thick
Providing and laying of Bituminous Concrete layer conforming to clause 507 (Grading II) of MORT&H Specification for road and bridge works (Fifth revision) using VG30 grade bitumen with minimum bitumen content of 5.4 % by mass of total mix, including cost of coarse aggregates, fine aggregates, bitumen etc., preheating and mixing at hot mix plant, cleaning of the road surface before laying the mix, application of tack coat, carrying the hot premixed materials by means of tipper, laying the hot premixed material with paver finisher, rolling with power roller with necessary hand packing and pinning to give an even surface and to achieve the desired compaction, spreading Quarry Dust, including running expenses of all plants and machineries and proper traffic control during execution, quality control tests at required interval, etc., all complete as per specifications and as directed by Engineer-In-Charge. Note: - 1) Cleaning the road surface shall be carried out with wire brush, sweeping with mechanical broom and dusting by using compressed air as per specifications. 2) Cost of Tack coat will be paid for separately under relevant item. 3) Pre-heating of the mineral aggregate and bitumen to the specified temperature, thoroughly mixing with binder of specified bitumen content and filler as per mix design shall be carried out at hot mix plant of specified capacity as per MORT&H Specifications. 4) Waste Plastic (Dry Process) : Cost shall be inclusive of collection of waste plastics, cleaning & shredding, shredding machine and mixing of waste plastics with aggregate in hot mix plant as per specifications and conforming to IRC:SP:98-2013. 5) Carrying the hot premixed materials by means of tipper, trucks or any other approved means to laying site. Laying the hot premixed material over the prepared surface by means of paver finisher including manual operation as and when required for proper grade, level and camber. 6) Supply and evenly spreading of Quarry Dust over the finished layer and cleaning the same, removing small stones before allowing traffic on road.
Government of India Department of Atomic Energy General Services Organization Civil Engineering Group
TENDER DOCUMENT FOR
Part – II : Financial Bid (Section - VIII)
INDEX
General Information for guidance of tenderers
Conditions for Cement & Steel
Schedule of Quantities
GENERAL INFORMATION FOR GUIDANCE OF TENDERERS
The schedule of quantities is to be read for the purpose of pricing in conjunction with the special conditions, general rules for the guidance of contractors, conditions of contract, specifications, drawings, schedule of supply of materials and the appendices.
The prices inserted in the schedule of quantities shall be inclusive of value of the work described including all cost and expenses, which may be required in and for the construction of the work described together with the general risks, liabilities and obligations not forth or implied in the documents on which the tender is to be based.
The quantities stated are to be considered approximate only and the unit prices entered in the schedule of quantities and prices shall apply only to the actual quantities measured in the completed work in accordance with the specifications.
All the materials other than those shown in schedule of supply of materials in section VII are to be arranged by the contractor and his rates should account for the same.
Rates quoted for all items in this tender shall include cost of all materials including cement and steel. Department will not supply any materials other than materials stipulated in Section - VII of the tender and as such the rates quoted must be all inclusive.
If contractors need any clarification they are required to contact the ‘Head, CTC, CEG, GSO, Kalpakkam – 603 102, Chengalpattu district, Tamilnadu (Ph – 044 - 27481238 and 044-27480500 Extn. 84727, 85803) during office hours.
SECTION VIII - CONDITIONS FOR CEMENT & STEEL
The contractor shall be responsible for supply of cement and procure Ordinary Portland Cement conforming to IS 269-2015 / Portland Pozzolona Cement conforming to IS: 1489-2015 and use it on works. Since the supply of cement by the department has been dispensed, all the clauses relevant to supply of cement by department in this tender document stands cancelled. The contractor shall purchase cement from the approved manufacturers only. The secured advance on cement shall be regulated as per Clause 10-B of conditions of contract. Secured advances on cement up to 90% of assessed price shall be paid to the contractor after indemnifying the Government and through insurance cover. The quantity of cement on which secured advance shall be paid will be restricted to the consignment of cement tested and passed in the test in department laboratory. Prior approval to be obtained from the Engineer for the quantities proposed to be purchased.
The contractor shall procure Ordinary Portland Cement conforming to IS 269-2015 / Portland Pozzolona Cement conforming to IS: 1489-2015 and use it on works. Ordinary Portland Cement, as required in the work, from reputed manufacturers of cement, having a production-capacity of one million tonnes per annum or more, such as A.C.C., L & T, J.P. Rewa, Vikram, Shri Cement, Birla Jute and Cement Corporation of India, etc., as approved by Ministry of Industry, Government of India, and holding license to use ISI certification mark for their product whose name shall be got approved from Engineer-in-charge. Supply of cement shall be taken in 50 Kg. bags bearing manufacturer’s name and ISI marking, samples of cement arranged by the contractor shall be taken by the Engineer-in-charge and got tested in accordance with provisions of relevant BIS codes. In case test results indicate that the cement arranged by contractor does not conform to the relevant BIS codes, the same shall stand rejected and shall be removed from the site by the contractor at his own cost within a week’s time of written order from the Engineer-in-charge to do so.
The cement shall be brought at site in bulk supply of approximately 50 tonnes or as decided by the Engineer-in-charge.
The cement Godown of having a capacity to store minimum of 2000 bags of cement shall be constructed by the contractor at site of work for which no extra payment shall be made from department. Double lock provision shall be made to the door of the cement godown. The keys of one lock shall remain with the Engineer in charge or his authorised representative and the key of the other lock shall remain with the contractor. The contractor shall be responsible for the watch and ward the safety of the cement godown. The contractor shall facilitate the inspection of the cement godown by the Engineer-in-charge at any time.
The contractor shall supply free of charge the cement required for testing. The cost of tests shall be borne by the contractor.
The actual issue and consumption of cement on work shall be regulated and proper accounts maintained as provided in Clause 10 of the contract. The theoretical consumption of cement shall be worked out as per procedure prescribed in Clause 42 of the contract and shall be governed by conditions laid therein.
Cement brought to site and cement remaining unused after completion of work shall not be removed from site without written permission of the Engineer-in-charge.
REINFORCEMENT STEEL
The contractor shall procure only TMT bars of Fe500 Grade conforming to IS – 1786 (Latest edition) produced by the following manufacturers SAIL, RINL, TATA & JINDAL with a test certificate and use it on works after getting approval from department Engineer or tested in department laboratory. Sample shall be tested for all the required parameter as specified in the BIS before bulk purchase. The contractor shall have to obtain and furnish test certificates to the Engineer-in-charge in respect of all supplies of steel brought by him to the site of work. Samples shall also be taken and got tested by the Engineer-in-charge as per the provisions in this regard in relevant BIS codes. In case the test results indicate that the steel arranged by the contractor does not conform to BIS codes, the same shall stand rejected and shall be removed from the site of work by the contractor at his cost within a week’s time from written orders from the Engineer-in-charge to do so.
The steel reinforcement shall be brought to the site in bulk supply of 10 tonnes or more or as decided by the Engineer-in-charge.
The steel reinforcement shall be stored by the contractor at site of work in such a way as to prevent distortion and corrosion and nothing extra shall be paid on this account. Bars of different sizes and lengths shall be stored separately to facilitate easy counting and checking.
For checking nominal mass, tensile strength, bend test, re-bend test etc. specimen of sufficient length shall be cut from each size of the bar at random at frequency not less than that specified below:
Size of bar
Under 10 mm dia.
10 mm to 16mm dia.
Over 16 mm dia.
The contractor shall supply free of charge the steel required for testing. The cost of tests shall be borne by the contractor.
The theoretical consumption of steel on work shall be worked out as per procedure prescribed in Clause 42 of the contract and shall be governed by conditions laid therein. For the purpose of payment, weight will be calculated on the basis of bar bending schedule and weights of bar given as under. Wherever actual lengths placed differ from bar bending schedule actual length will only be measured.
Bar dia. mm
Steel brought to site and steel remaining unused shall not be removed from site without the written permission of the Engineer-in-charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.75 MB
TR272FormofAgt.pdf
Tender Documents • 0.14 MB
272Annexure2to4.pdf
Tender Documents • 0.12 MB
BOQ_931917.xls
BOQ • 0.39 MB
TR272PartoneDocument.pdf
Tender Documents • 4.52 MB
TR272TechnicalbidandFormsACDFGH.xls
Tender Documents • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .