Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-Finance | ₹4.4 L | L1 | Accepted-Finance The rate was quoted below the estimate rate |
| 2 | L2₹4.4 LRejected-Finance | ₹4.4 L | L2 | Rejected-Finance The rate was quoted above the estimate rate |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Due to EMD related issues |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Due to EMD related issues |
| Sl No | Description | Qty | Unit | Varalakshmi L1 | Kalidass L2 |
|---|---|---|---|---|---|
| 1.00Construction of Bus shelter at Lingampatti Village and Panchayat in Kovilpatti Union Under MLACDS 2025-26 | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 9.46 | Cubic Meter | 263.75 ₹2,495.08 Lowest | 265 ₹2,506.9 |
| 3.00 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick | 12.45 | Cubic Meter | 45.75 ₹569.59 Lowest | 46 ₹572.7 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 3.65 | Cubic Meter | 5,481.25 ₹20,006.56 Lowest | 5,482 ₹20,009.3 |
| 5.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 0.83 | Cubic Meter | 91,902.5 ₹76,279.08 Lowest | 91,903 ₹76,279.49 |
| 6.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical | 69.83 | Squre Meter | 547.5 ₹38,231.93 Lowest | 548 ₹38,266.84 |
| 7.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | 8.27 | Squre Meter | 9,517.75 ₹78,711.79 Lowest | 9,518 ₹78,713.86 |
| 8.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" | 10.85 | MT | 6,289.25 ₹68,238.36 Lowest | 6,290 ₹68,246.5 |
| 9.00 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 15.07 | Cubic Meter | 120.9 ₹1,821.96 Lowest | 122 ₹1,838.54 |
| 10.00 | Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) | 30.57 | Squre Meter | 920 ₹28,124.4 Lowest | 922 ₹28,185.54 |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
26 Aug 2025, 3:00 pmClosed
BDO(BP)
BDO(BP) , Panchayat Union Office Kovilpatti
Construction of Bus Shelter at Lingampatti Village and Panchayat
2025_RDTN_594866_1
A2/3106/2025
Open Tender
Civil Works - Buildings
Item Rate
kovilpatti
as per Tender Documents
4 documents required · 4 mandatory
₹0
₹4,500
Yes
6 Aug 2026
19 Aug 2025
26 Aug 2025
19 Aug 2025
26 Aug 2025
19 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].