| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance | L1 | Accepted-Finance Being the lowest bidder L1 | |
| 2 | L2₹3.7 L+₹20,601.08 (5.91%)Accepted-Finance | L2 | Accepted-Finance Being L2 | |
| 3 | L3₹4.3 L+₹76,903.66 (22.1%)Accepted-Finance | L3 | Accepted-Finance Being L3 | |
| 4 | L4₹4.3 L+₹82,816.06 (23.8%)Accepted-Finance | L4 | Accepted-Finance Being L4 | |
| 5 | L5₹4.4 L+₹90,324.66 (25.9%)Accepted-Finance | L5 | Accepted-Finance Bering L5 |
Tender Value
₹6.1 L
Closing Date
14 Dec 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO Doda
Forest Complex Doda
Installation of Boundary Pillars in Koti Forest of Siraj Range in Doda Forest Division.
2022_FD_198740_1
e-NIT No. 43 of 2022 dated 07/12/2022
Open Tender
Civil Works
Item Rate
30 days
In Koti Forest of Siraj Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
DFO Doda
Exempted
16 Dec 2022
7 Dec 2022
15 Dec 2022
7 Dec 2022
14 Dec 2022
7 Dec 2022
Amount
Earth providing work in excavation by manual means in trenches for foundations drains, pipes cables, etc. (Not exceeding 1.5 mte width) and for shafts, wells, cesspits and the like not exceeding 10sq in plane. Depth height upto 15 mtr including disposal of excavated earth upto 1 mtr from cutting edge, disposal earth is to be leveled and neatly dressed 80 % dense harder soil and 20% is ordinary rock. 88 numbers sides = 1.00 with dimensions 2.5 x 1.50 x 3.25 = 1072.50 cft.
Providing and lying in position cement concrete of specified grade exclusing the cost of centering and shuttering. All work upto plinth level 1:5:10 ( 1 cement and 5 coarse sand 10 graded stone aggregate 40 mm nominal size) crused. 88 numbers of sides = 1.00 with dimensions 2.5 x1.50 x 0.25 = 82.50 cft
Providing and lying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:3:6 ( 1 cement and 3 coarse sand 6 graded stone aggregate 20 mm nominal size). (i) 88 numbers of sides = 1.00 with dimensions 2.5 x1.50 x 2.00 = 660 cft and (ii) 88 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 2.00 = 132 cft
Filling available excavated earth ( Excluding rock) in trenches plinth sides foundation etc in layers not exceeding 20 cm depth consolidating each deposited layer by remaining and watering load upto 50 mtr and fill upto 1.5 cm. (i) 88 numbers of sides = 1.00 with dimensions 2.5 x 1.50 x 1.00 = 330 cft and (ii) 88 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 1.00 = 66 cft
Reinforced cement concrete work in walls ( any thickness) including attached pllasters buttresses, plinth and string courses fillets, columns, pillars, fillets, piers, abutments, posts and struts etc upto floor five level excluding cost of cetering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 coarse sand 3 graded crushed stone aggregate 20 mm nominal size.). 88 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 6.00 = 396 cft
Reinforcement for RCC work including straightening,cutting bening, placing in position and binding all complete cold twisted cold twisted bars. 88 numbers (i) 4 numbers of Iron bars having length 6 feet = 2112 feet = 644 mtr which includes Weight Kg/mtr = 0.62 = total weight = 399.28 Kg (ii) 8 numbers of Iron bars having length 1.5 feet = 1056 feet = 322 mtr which includes Weight Kg/mtr = 0.39 = total weight = 125.58 Kg
Painting of pillars (with superior and exterior paint) including costs of labour charges incliuding painting of forest department logo and the front phase of the pillar with stencil for mainline BPs Red shade. Adventure 2189 (Nerolac) and for chak BPsYellow shade. Bumble bee 2014 (Nerolac) Exterior Emulsion paint is recommended.
Centering and shuttering including shuttering propping etc and removal of form work for columns piers abutments pillers posts and struts for (i) 88 number having 2 sides of length 1.50 feet x depth height 6.00 feet = 1584 sft. (ii) 88 number having 2 sides of length 0.50 feet x depth height 6.00 feet = 528 sft.
Carriage of material from source to site of work by M.T and H.L av for sand av. M.T 30 Km and H.L 6 Km
Carriage of material from source to site of work by M.T and H.L av for Bajri av. M.T 30 Km and H.L 6 Km
MUNIR AHMED
FIRDOUS AHMED
CONTRACTOR
IMTIAZ AHMED
ZAKIR HUSSAIN
Arshad Hussain
Bashir Ahmed
Amreena Begum
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .