Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | Admitted-Finance |
| 2 | Admitted-Finance GOVT CONTRACTOR VILLAGE KADHYAR P O TEHSIL JUNGA DISTT SHIMLA 9 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹45,500
Closing Date
31 Dec 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Kumarsain Division HPPWD Kumarsain
Construction of Kainthalghatti to Hatiya road via Prod Mandir Km 0/000 to 2/500 SH Formation cutting 5/7 mtr wide road Km 0/810 to 0/825 and 1/015 to 2/225
2020_PWD_43260_1
PW-KMS-AB-NIT/2020-8110-11 dated 03.11.2020
Open Tender
Civil Works
Item Rate
180 days
Kumarsain
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,500
EE Kumarsain
₹45,500
5 Jan 2021
19 Dec 2020
1 Jan 2021
19 Dec 2020
31 Dec 2020
19 Dec 2020
90 days
Amount
5/7 meters wide (5 meters wide in straigth and 7 meters on curves) Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposal of excavated earth in all height and depths in all kinds of soil, including saturated soil comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock where blasting is prohibited and their intermediate classification of soils including dewatering wherever required, setting out true to the required lines, grades, side, slopes, trimming of bottom and levels as shown on the drawing and as directed by the Engineer.-in Charge. at site according to the HP.PWD specification of 1990 volume-I and sorting out useful and un-useful material and stacking the same in all leads and lifts and transportation of the un serviceable materials for filling in roadways, embankment s for grade improvement and leveling to required grades and then disposing of all surplus excavated materials in acquired width of the road or on approved dumping site /sites through all labours machineries materials, tools, equipments and safety measures and other incidental necessary to complete the work by mechanical means and or labour if any required .All usefull materials, such as stone shingles, aggregates and slates etc. shall be sorted out and stacked along road side which shall not be less than one third blasting work (hard rock) one sixth of blasting work (soft rock) or 3744.85cum. which ever is higher in all cases failing which recovery @ Rs.170/- per cubic metre shall be effected. Any loss to the Public and Private property during the course of execution and disposal of serviceable/un-serviceable materials shall be the absolute responsibility of the Contractor which shall have to be duly compensated to the full extent him in all respect and in all cases.
Pawan Kumar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .