Loading…
Loading…
Tender Value
₹49.3 L
EMD Value
₹99,000
Closing Date
10 Sept 2026, 12:00 pm
SE RED VARANASI
pandeypur varanasi
Durgakund ward sthit jalan(kabira complex) ke bagal sthit sthan per chatra-chatrao ke adhyan hetu 01 digital library ka nirman karya
2026_REDUP_1179456_4
766/RED/2026-27/05-08-2026
Open Tender
Civil Works
Percentage
180 days
VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹99,000
24 Aug 2026
24 Aug 2026
10 Sept 2026
24 Aug 2026
10 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 133.32 | SQM | 12.29 | ₹1,638.5 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 65.97 | CUM | 181.75 | ₹11,990.05 |
| 3 | Extra for levelling & neatly dressing of disposed soil completely as directed by Engineer in-charge. | 39.99 | CUM | 64.97 | ₹2,598.15 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 49.93 | CUM | 136.86 | ₹6,833.42 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | 4.19 | CUM | 4,826.3 | ₹20,222.2 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar grade 1:6 (1 cement : 6 coarse sand) | 43.21 | CUM | 4,980.09 | ₹2,15,189.69 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Concrete of M30 grade with minimum cement
content of 350 kg /cum Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | 23.83 | CUM | 6,636.69 | ₹1,58,152.32 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending all complete | 3,512.04 | KG | 75.31 | ₹2,64,491.73 |
| 9 | Columns, Pillars, Piers, Abutments, Posts and Struts | 131.53 | SQM | 671.23 | ₹88,286.88 |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. | 23.69 | SQM | 6,885.02 | ₹1,63,106.12 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
sbddurgakundjalans.pdf
Tender Documents • 2.78 MB
BOQ_2217759.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].