Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.9 L+₹1,532.55 (0.31%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹5.2 L+₹32,302.40 (6.56%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹5.3 L+₹34,630.42 (7.04%)Rejected-AOC 0 | L4 | Rejected-AOC L4 | |
| 5 | L5₹5.9 L+₹1.0 L (20.8%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | SANJEEV KUMAR SHARMA L2 | M/s Manoj Enterprises L6 | MAHIPAL L1 | SHREE ASSOCIATES L3 | MANOJ KUMAR L4 | MOHD RIZWAN CONTRACTOR L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing, laying, spreading and compacting 53-22.4 mm stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.G-3 | 64.14 | Cum | 2,000 ₹1,28,280 | 3,080 ₹1,97,551.2 | 35 ₹2,244.9 Lowest | 2,200 ₹1,41,108 | 1,500 ₹96,210 | 2,540 ₹1,62,915.6 |
| 2.00 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.(Including cost of Emulsion) | 855.15 | Km. | 140 ₹1,19,721 | 25 ₹21,378.75 | 33 ₹28,219.95 | 23 ₹19,668.45 Lowest | 30.6 ₹26,167.59 | 24.56 ₹21,002.48 |
| 3.00 | Providing and applying tack coat with bitumen V.G.-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom .(Including cost of Bitumen) | 1,922.4 | Sqm. | 16 ₹30,758.4 | 15 ₹28,836 | 15 ₹28,836 | 17 ₹32,680.8 | 18.2 ₹34,987.68 | 14.56 ₹27,990.14 Lowest |
| 4.00 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508. | 1,922.4 | Sqm. | 70 ₹1,34,568 Lowest | 138 ₹2,65,291.2 | 155 ₹2,97,972 | 130 ₹2,49,912 | 140 ₹2,69,136 | 142 ₹2,72,980.8 |
| 5.00 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510.(Including cost of Bitumen) | 1,922.4 | Sqm. | 40 ₹76,896 Lowest | 65 ₹1,24,956 | 70 ₹1,34,568 | 40 ₹76,896 Lowest | 50 ₹96,120 | 55.2 ₹1,06,116.48 |
| 6.00 | Providing & fixing signboard size 3'x4' with Blue surface, edge & letter color on iron sheet etc. complete | 1 | Sqm. | 3,500 ₹3,500 | 4,000 ₹4,000 | 350 ₹350 Lowest | 4,228 ₹4,228 | 4,200 ₹4,200 | 3,360 ₹3,360 |
Tender Value
₹7.5 L
EMD Value
₹15,000
Closing Date
8 Oct 2025, 5:00 pmClosed
EE UDEYC SAHARANPUR
Office of the EE UDEYC SAHARANPUR
Repairing of pot holes on Bituminous Service road from Km. 4.240 to Km. 7.800 of Khara Canal
2025_UPIDC_1078703_16
03/EE/2025-26
Open Tender
Civil Works
Item Rate
30 days
Distt-Saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹15,000
Office of the EE UDEYC SAHARANPUR
14 Nov 2025
30 Sept 2025
9 Oct 2025
30 Sept 2025
8 Oct 2025
30 Sept 2025
3 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .