Tender Value
₹5.3 L
EMD Value
₹5,500
Closing Date
14 Jan 2022, 2:00 pmClosed
SE EDC BALRAMPUR
OFFICE SE EDC BALRAMPUR
WORK OF LOAD EXTENSION 212 KVA TO 250 KVA DISTRICT HOSPITAL BHINGA ,RELEASING CONNECTION TO OXYZAN PLANT LAXMANPUR BAZAR AND SONVA UNDER EDD SHRAWASTI
2022_MVVNL_673073_1
118/EDC(BLP)/2021-22
Open Tender
Electrical Works
Fixed-rate
90 days
SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC BLP ICICI 101505001086 IFDC ICIC0001015
₹5,500
Yes
15 Jan 2022
7 Jan 2022
14 Jan 2022
7 Jan 2022
14 Jan 2022
7 Jan 2022
Amount
Carriage of all the concerning material from Electricity Store Centre, Shrawasti to JE's dump store & from JE's dump store to the site of work including loading, unloading and proper stacking at site etc. (Decentralized Material Porvide By Working Agency)
ST Poles (11 Mtr Long)
PCC Poles (8.5 mtr long)
ACSR Weasel Conductor
Cartage of 400 KVA T/F
Cartage of 250 KVA T/F
Cartage of LT XLPE Cable 3.5x240 Sq.mm
Cartage of 11 KV XLPE 3x185 Sq.mm
Cartage of 11 KV Pilfer Priff Meterring Cubical CTR 50x5 Amp
Cartage of 11 KV Double Metering Combined Unit CT/PT CTR 50/5 Amp
Cartage of Other Line Materials
Erection of sectional double pole (8.5mtr long PCC Pole) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection of sectional double pole (11 mtr long ST Pole) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection of Single pole (11 mtr long ST Pole) alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Earthing of pole.
Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials provided by the contractor at his own cost.
Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required)
Laying fo LT XLPE Cable 3.5x240 Sq.mm
Mounting of 400 KVA T/F
Mounting of 250 KVA T/F
Erection and Installation of 11 KV Pilfer Priff Meterring Cubical CTR 50x5 Amp
Erection and Installation of 11 KV Double Metering Combined Unit CT/PT CTR 50/5 Amp
Alumunium Lug 400 Sq.mm
Plinth With fencing 400 KVA T/F
Top Channel Clamp With Nut Bolt
ST Pole Clamp With Nut Bolt
Stone Pad
Top Off And Dropper Clamp
G.I Pipe 6" Dia
Top T-Off And Dropper Channel Clamp
Round Pole Clamp With Nut Bolt
M/s S S Associates
SAROJ CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .