Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹23.0 LAccepted-AOC 91 DEFENCE ESTATE PHASE II NEAR AMBEDKAR PARK DEORI ROAD AGRA UP | AGRA | UTTAR PRADESH | 282001 | L-1 | Accepted-AOC Being lowest | |
| 2 | L-2₹29.5 L+₹6.5 L (28.3%)Rejected-Finance | L-2 | Rejected-Finance Being other than lowest | |
| 3 | L-3₹30.4 L+₹7.5 L (32.5%)Rejected-Finance | L-3 | Rejected-Finance Being other than lowest | |
| 4 | L-4₹32.0 L+₹9.1 L (39.4%)Rejected-Finance NAGLA UDHA NEAR PRIMARY SCHOOL POST DHANOLI AGRA UP AGRA 282010 | AGRA | AGRA | UP | 282010 | L-4 | Rejected-Finance Being other than lowest | |
| 5 | L-5₹35.6 L+₹12.6 L (55.0%)Rejected-Finance | L-5 | Rejected-Finance Being other than lowest |
Tender Value
₹48.5 L
EMD Value
₹97,000
Closing Date
24 Jan 2020, 6:00 pmClosed
GE (AF) (Tech Area) Kheria, Agra
GE (AF) (Tech Area) Kheria, Agra
OUT SOURCING OF SERVICES FOR OPERATION OF AC PLANTS DG SETS AND CONNECTED WORKS OF ZONE A UNDER GE (AF) TECH AREA KHERIA AGRA
2019_MES_310172_1
8200-1218/E8
Open Tender
Civil Works
Item Rate
330 days
GE (AF) (Tech Area) Kheria
for enlisted
scanned copy of contractors appli on letter head
scanned copy of tender fee in the form of DD or bankers cheque
scanned copy of enlist letter
scanned copy of PF code no letter
for unenlisted
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) (Tech Area) Kheria, Agra
₹97,000
Yes
25 Feb 2020
30 Dec 2019
25 Jan 2020
30 Dec 2019
24 Jan 2020
16 Jan 2020
30 Dec 2019 - 13 Jan 2020
Amount
Providing services for manning & operation of Central AC Plant and Stand by DG set during failure of electric supply/low voltage problem for 24 hours (round the clock) in 3 shifts of 8 hours each complete all as specified and directed. Details of AC plant and stand by DG set are as under :- (a) DG set 160 KVA at Base Ops. (b)AC plant, 3x30 TR at Base Ops.
Providing services for manning & operation of Central AC Plant and Stand by DG set during failure of electric supply/low voltage problem for 24 hours (round the clock) in 3 shifts of 8 hours each complete all as specified and directed. Details of AC plant and stand by DG set are as under :- (a) DG set 125 KVA installed in New SRE. (b)DG set 110 KVA installed at GCA. (c) AC plant, 3x10 TR at GCA.
Providing services for manning & operation of Stand by DG set during failure of electric supply/low voltage problem for 24 hours (round the clock) including operation of fire fighting system in 3 shifts of 8 hours each complete all as specified and directed.Details of stand by DG set are as under :- (a) DG Sets 110 KVA (01 no) installed in ATC complex (b) DG Sets 200 KVA (01 no) installed in ATC complex (c) DG Sets 40 KVA installed in Met Section (d) 25 KVA installed in VIP Lounge (e) Fire fighting system in ATC
Providing services for manning & operation of Stand by DG set during failure of electric supply/low voltage problem for 24 hours (round the clock) including operation of fire fighting system in 3 shifts of 8 hours each complete all as specified and directed.Details of stand by DG set are as under :- (a) DG set 500 KVA - 02 Set installed at New 50 SQN (AWACS). (b)Fire fighting system (AWACS).
Providing services for manning & operation of Stand by DG set during failure of electric supply/low voltage problem for 24 hours (round the clock) in 3 shifts of 8 hours each complete all as specified and directed.Details of stand by DG set are as under :- (a) DG set 200 KVA -02 sets at 78 SQN, (b) DG set 30 KVA, IOC gate Tech area.
Providing services for manning & operation of Central AC Plant and Stand by DG set during failure of electric supply/low voltage problem for 24 hours (round the clock) including operation of fire fighting system in 3 shifts of 8 hours each complete all as specified and directed.Details of AC plant and stand by DG set are as under :- (a) AC plant 3 x 70 TR at PPR&S (b) DG Set of capacity 400 KVA at PPR&S (c) Fire fighting system at PPR&S
Notes for item No 1, 2,3,4, 5 & 6 (i) Payment of wages to tradesmen/workers employed on the work shall be made through Adhaar linked bank account of individuals only. The contractor shall distribute the payment in 1st week of every month and will confirm to Engr-in-Charge by showing the payment slip/bank transaction document from bank and these documents shall also be mandatory while claiming each payments and wage paid to the trademen/workers shall not be less than minimum wages/fair wages as notified time to time by state/central Govt (whichever is more). (ii) Contractor shall employ technically qualified operator having ITI or license in AC/ Electrical/Mechincal/Automobiles or minimum two years experience of AC Plants/DG Sets, AMF panel, fire fighting system and other E/M equipments. (iii) Preventive and routine maintenance shall be carried out by authorized/reputed agency. (iv) Fuel & lubricant oil shall be issued by department free for filling . (v) Log sheets/Register for maintaince/Attendance Register of staff deployed and other stationery will be provided by the contractor at no extra cost given in this account. (vi) All cleaning material will be provided by the contractor.
Notes for item No 1, 2, 3, 4, 5 & 6 (contd...) (vii) Keep battery functional, etc whenever required, tightening and cleaning of of all battery terminal, cleaning surrounding area upto 50 mtrs, DG set, LT panel etc complete all as specified and directed. (viii) Panel boards, compressor, motor, pump set, AHU, cooling controls cleaning and Descaling of cooling towers/water cooled condenser and water pipe lines with liquid MAIC solution & labour as and when required and directed etc, complete with daily cleaning checking of any leakage & to stop the same, cleaning of cooling tower/water cooled condenser, air filter etc. Filling the daily log sheet on hourly basis. Pump down the system in case of leakage of gas. Cleaning of gas filter as & when required. Assuring OP, HP & LP are within limit including petty repairs such as supply & replacement of copper tubes connection flare nut & bolts, tightening electric connection including supply and replacement of lugs as & when required & keep the plant/plant room/ surrounding area up to 50mtr neat & clean and to maintain functional.
Notes for item No 1, 2, 3, 4, 5 & 6 (Contd...) (ix) Replacement of unserviceable items/parts of DG sets, Compressor oil, Engine Oil, unserviceable batteries, battery terminals with nuts & bolts shall be got done through the techincal staff employed by the contractor only. However the new items to the extent required shall be paid at supply only rates against releveant items hereinafter. Old unserviceable material shall be contractor's property as per schedule of credits. (x) Contractor shall provide two sets of uniform with name tag of colour as approved by Engineer-in-Charge for each individual employed nothing extra shall be payable to contractor on this account.
Supply only Engine oil 15 W / 40 complete all as specified and directed.
Supply only coolant suitable for radiater of DG sets complete all as specified and directed .
Supply only distilled water suitable for DG set complete all as specified and directed.
Supply only battery terminal brass(heavy duty)with nuts & bolts for battery (as per sample) complete all as specified and directed.
Supply only Battery- 12 Volts, 180 Ah for DG Set complete with initial charging, lead terminal for DG set complete all as specified and directed.
Charging/filling in AC Plants, refrigerant gas R-22/407 gas in cylinder (Each cylinder of 61 Kgs of gas) including transportation for supplying the filled gas cylinder in store yard of AGE E/M (Tech Area) complete all as specified and directed. Note: Gas shall be supplied by the contractor in properly sealed gas cylinder and empty cylinders will be returned to the contractor within 03 months from date of delivery.
Supply only new compressor oil for Charging/Fillig in central AC plants compressor's complete all as specified and directed.
V.K. Enterprises
M/S J J ENTERPRISES
MUKTA AND COMPANY
AGRA AND COMPANY
M/S R.K. ENTERPRISES
M/s SCHOLASTIC ENTERPRISES
M/S BEE ESS ENTERPRISES
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .