| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.1 LAccepted-AOC 42 11 DIPKA PALI ROAD DIPKA DIPKA KORBA CHHATTISGARH 495452 | KORBA | CHHATTISGARH | 495452 | ₹1.1 L Quoted ₹93,849 | L-1 | Accepted-AOC Bidder attains L-1 status |
| 2 | Rejected-Technical LIG 22 1ST FLOOR RSS NAGAR KORBA CG 495677 | KORBA | CHHATTISGARH | 495677 | - | - | Rejected-Technical Rejected as the bidder attains L-2 status |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected as the bidder attains L-3 status |
| Sl No | Description | Qty | Unit | M S T TECHNOLOGIES L2 | SHASHI BHUSHAN SINGH L1 | SHRI LAXMI CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Fabrication of Iron & Steel (MS channel, Angle, Flat etc) for making platform for control & VCB/OCB panels (height - approx. 0.6 mtr, length - approx. 1.1 mtr & width - approx. 1.1 mtr) Note: Iron & Steel shall be provided by SECL. | 1,411 | Kg | 48 ₹67,728 | 34 ₹47,974 Lowest | 72 ₹1,01,592 |
| 2.00 | Painting with primer & enamel paint of fabricated platform | 58.75 | Sq. mtr | 105 ₹6,168.75 | 180 ₹10,575 | 100 ₹5,875 Lowest |
| 3.00 | Dismantling & Installation of the panels on fabricated platform including connection of power cable & control etc. | 19 | No. | 1,350 ₹25,650 | 900 ₹17,100 | 100 ₹1,900 Lowest |
| 4.00 | Laying of HT power cable in existing trench for re-organization of power supply | 140 | Mtr | 75 ₹10,500 Lowest | 130 ₹18,200 | 100 ₹14,000 |
| 5.00Note: The estimated cost put to tender is excluding the PF and Pension Component. These statutory payment as applicable shall be reimbursed to the contractor on production of proof of payment limited to the maximum likely number of workmen to be deployed per day is 08 nos. | ||||||
| 6.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.0 L
EMD Value
₹2,500
Closing Date
30 Aug 2025, 5:00 pmClosed
Staff Officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353
Heightening of base foundation of 33KV control panels and 3.3KV VCB/OCB panels installed at 33KV/3.3KV Old Substation of Dipka Expansion Project.
2025_SECL_341563_1
SECL/GM/DA/SO(EnM)/ e-tender/25-26/75 dtd-14/08/25
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
4 documents required · 4 mandatory
₹2,500
11 Nov 2025
18 Aug 2025
1 Sept 2025
18 Aug 2025
30 Aug 2025
19 Aug 2025
18 Aug 2025 - 25 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .