Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹9.7 L
Closing Date
28 Jul 2026, 9:30 am2d left
Executive Engineer HPPWD Shimla Division No. III
Executive Engineer HPPWD Shimla Division No. III
Construction of Balance work i.e. Lecture Theatre, Examination Hall including Parking Block Opposite to Auditorium Block at Medical College IGMC Shimla.
2026_PWD_139518_2
SD-III-6403-16dt.18-07-2026
Open Tender
Civil Works - Buildings
Percentage
180 days
IGMC
As per SBD
12 documents required · 12 mandatory
₹7,000
₹9.7 L
21 Jul 2026
21 Jul 2026
28 Jul 2026
21 Jul 2026
28 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 130 | Per Cubic Metre | 1,434 | ₹1,86,420 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per
direction of Engineer - in- charge. | 854.28 | Per Cubic Metre | 2,092.05 | ₹17,87,196.47 |
| 3 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: Channels, angles, tees and flats | 400 | Per Kilogramme | 1.35 | ₹540 |
| 4 | Earth work in foundation or cutting by mechanical means (Hydraulic excavator)/ manual means in all heights and depths in all kinds of soil including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiesling and wedging out of rock (where blasting is prohibited and their intermediate classifications soils including dewatering where ever required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in-charge at site, according to the CPWD specification and sorting out useful and unuseful material and transportation of the unuseful material for disposing of all surplus earth at dumping site including prescribed dumping charges (which will be arranged by the contractor himself at his own cost within MC area or out site on private land) to the satisfaction of Engineer-in-Charge through all modes of transportation including head load, animal load or mechanical means along with its levelling fine dressing and with all kinds of labour machineries, tools equipments and safety measures and incidentals necessary to complete the work wise mechanical means and labour (if required) all useful material such as stones,shingles aggregate and slates shall be properly stacked at site to the meximum possible extent in all leads and lifts through all modes of transportation and used/removed as per the direction of Engineer-in-charge. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respect including all incidental charges:- :- All kinds of soil. | 1,173.63 | Per Cubic Metre | 1,086.5 | ₹12,75,149 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete complete including carriage of materials in all leads and lift as per direction of Engineer in Charge. | 59.28 | Per Square metre | 222.8 | ₹13,207.58 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.complete including carriage of materials in all leads and lift as per direction of Engineer in Charge. | 1,048.16 | Per Square metre | 481.8 | ₹5,05,003.49 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform complete including carriage of materials in all leads and lift as per direction of Engineer in Charge. | 224.4 | Per Square metre | 538.35 | ₹1,20,805.74 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers complete including carriage of materials in all leads and lift as per direction of Engineer in Charge. | 79.2 | Per Square metre | 471.45 | ₹37,338.84 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) complete including carriage of materials in all leads and lift as per direction of Engineer in Charge. | 82.69 | Per Cubic Metre | 4,804.85 | ₹3,97,313.05 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) complete including carriage of materials in all leads and lift as per direction of Engineer in Charge. | 150.81 | Per Cubic Metre | 5,935.35 | ₹8,95,110.13 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
SBDupdated48276551.pdf
Tender Documents • 3.60 MB
BOQ_206823.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].