Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.3 LAccepted-AOC | 1 | Accepted-AOC Techno commercially accepted L1 bidder | |
| 2 | 2₹12.4 L+₹15,508.15 (1.27%)Rejected-Finance COALGATE RENUSAGAR PARASI P O RENUSAGAR DISTT SONEBHADRA U P 231218 | RENUSAGAR | SONEBHADRA | UTTAR PRADESH | 231218 | 2 | Rejected-Finance L2 bidder |
Tender Value
Refer Docs
EMD Value
₹15,400
Closing Date
10 Sept 2024, 11:00 amClosed
Staff Officer (Excv), NCL Jhingurda Project
Staff Officer (Excv) Office, NCL Jhingurda Project, Pin code-486889
Demounting, repairing and mounting of the final drive assy., steering system, differential, tyre removal dismantling assembling and fitment of HEMMs, repairing of hydraulic cylinders of HEMMs and repairing of sub Assy. of HEMMs at BWS Jhingurda Pro
2024_NCL_315917_1
JRD/SO(X)/E-TENDER/24-25/197 dated 26.08.2024
Open Tender
Excavation Department Work
Item Rate
365 days
NCL Jhingurda Project
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,400
19 Jan 2025
26 Aug 2024
11 Sept 2024
26 Aug 2024
10 Sept 2024
27 Aug 2024
26 Aug 2024 - 2 Sept 2024
Amount
SCOPE OF WORK: A. Removal, dismantling, assembling and fitment of tyres of dumper , water sprinkler, cranes and graders. (Tyre removal from dumpers, water sprinklers, cranes and graders, Dismantling of tyres from rim, Assembling of retraded/ New tyres on rim, Fitment of assembled tyres on the equipment) B. Dismantling, repairing, assembling of final drive, differential, brake assembly and steering linkage etc. for a year. (Dismantling/removal of rear tyres., Dismantling and removal of hub assly, Removal of Rear brake assly, Dismantling and removal of hub assly, Removal of floating seal and disc, Cleaning of brake assly, Re-fitting of brake piston on final drive housing, Re-fitting of brake assembly with floating seal and disc, Fitting of bearings, Cleaning , re-assembling and refitting of hub assly, Fitting of ring gear, Adusting of shim on hub, Testing of oil leakage on the hub assly, Fitment of planatary assly, Fitment of axle and hub front cover, Fitment of both tyres. C. Repairing of Hyd. Cylinders of HEMMS like steering, Hoist, boom, Arm, bucket, dump etc. and Suspensions of Dumpers (Dismantling of cylinder and suspension, Replacing service kit of hyd. Cylinder/ suspension, Assembling of cylinder, Tightening of all bolts/ stud of cylinder) D. Repairing of Sub. Assy. of Shovels and drills like swing machinary, final drive etc.(Cleaning of sub assly, Dismantling of sub assly, Inspection, checking and identifying defective parts, Replacing the defective parts by new one, Assembling of assly, Tightening of all bolts and nuts of assly)
Labour charges for Removal, dismantling, assembling and fitment of tyres of dumper , water sprinkler, cranes and graders. (approx 70 nos. tyres removal and fitment)(labour consisting of 01 skilled and 05 unskilled)
Labour charges for Dismantling, repairing, assembling of final drive, differential, brake assembly and steering linkage etc. approx 17 nos.) (labour consisting of 01 skilled and 05 unskilled)
Labour charges for Repairing of Hyd. Cylinders of HEMMS like steering, Hoist, boom, Arm, bucket, dump etc. and Suspensions of Dumpers (approx 20 nos.) (labour consisting of 01 skilled and 02 unskilled)
Labour charges for Repairing of Sub. Assy. of Shovels and drills like swing machinary, final drive etc. (approx 10 nos.)(labour consisting of 02 skilled and 02 unskilled)
Contractor Profit
Total impact of GST for the purpose of CTC
M/S. SAKUR AND SANJAY ENTERPRISES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_327387.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .