Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
5 Aug 2026, 6:00 pm
xen rew udhampur
xen rew udhampur
BOQ
2026_RDPR_316868_39
e-NIT No. 65 REW UDHAMPUR of 2026-27 Dated 20-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
NIT
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹3,880
21 Jul 2026
21 Jul 2026
6 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of Sign Board | 1 | No. | 1,000 | ₹1,000 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wel s, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 5.73 | Cum | 479.3 | ₹2,746.39 |
| 3 | R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement
: 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with
wooden plugs or 6mm bar nibs wherever required as per direction of
Engineer-in-charge (cost of earth works in excavation, concrete works in
foundation to be paid separately). | 1.1 | Cum | 27,585.95 | ₹30,344.55 |
| 4 | Fencing with R.C.C. post placed at required distance, embedded in cement
concrete blocks, every 15th post, last but one end post and corner post
shall be strutted on both sides and end post one side only, provided with
horizontal lines and two diagonals of barbed wire weighing 9.38 kg per
100 meters (minimum), between the two posts fitted and fixed with G.I.
staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed
while casting the post (cost of R.C.C. posts, struts, earth work and
concrete to be paid for separately) :- Payment to be made per meter cost of
total length of barbed wire used.
With G.I. barbed wire | 1,344.51 | M | 12.45 | ₹16,739.15 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 MIX. | 3.55 | cum | 5,733.6 | ₹20,354.28 |
| 6 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 105.12 | KG | 156.95 | ₹16,498.58 |
| 7 | Slip clearance | 112.06 | Cum | 331.15 | ₹37,108.67 |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth: | 20.09 | cum | 2,793 | ₹56,111.37 |
| 9 | Labour engaged for cleaning | 4 | No. | 500 | ₹2,000 |
| 10 | White washing with lime to give an even shade on New Work (three or
more coats) | 106.83 | Sqm | 29.95 | ₹3,199.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_1035803.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].