| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹44.0 LAccepted-AOC | L-1 | Accepted-AOC RATES ARE FOUND REASONABLE AND THE FIRM BEING L1 BIDDER | |
| 2 | L-2₹50.0 L+₹5.4 L (12.1%)Rejected-Finance | L-2 | Rejected-Finance BEING L2 BIDDER | |
| 3 | L-3₹52.0 L+₹7.4 L (16.7%)Rejected-Finance C O SHRI AMRENDER KUMAR YADAV IACHHIPUR SANTOSH NAGAR GORAKHNATH GORAKHPUR UTTAR PRADESH PIN 273015 | GORAKHPUR | UTTAR PRADESH | 273015 | L-3 | Rejected-Finance BEING L3 BIDDER | |
| 4 | L-4₹52.1 L+₹7.5 L (16.8%)Rejected-Finance VILL BAREGAON PO CHAK CHAKA BAZAR DIST BARPE | BARPETA | ASSAM | 781301 | L-4 | Rejected-Finance BEING L4 BIDDER | |
| 5 | L-5₹52.7 L+₹8.1 L (18.2%)Rejected-Finance | L-5 | Rejected-Finance BEING L5 BIDDER |
| Sl No | Description | Qty | Unit | M/S SITAL BUILDERS L2 | M/s DEBOJIT ROY L4 | KAKWANI BUILDERS L5 | BALEN DEWAN L7 | MR KULEN HAZARIKA L6 | Shiva Builders L3 | NARESH DAS L1 | M/s Narzary Enterprise L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of reed, lathing, single or double, including battens and plaster or chicken wire lathing, complete all as specified and as directed by Engineer-in-charge. | 184 | SQM | 9 ₹1,656 Lowest | 20 ₹3,680 | 55 ₹10,120 | 27 ₹4,968 | 50 ₹9,200 | 25 ₹4,600 | 35 ₹6,440 | 15 ₹2,760 |
| 2.00 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc., complete all as specified and as directed by Engineer-in-charge. | 80 | SQM | 29 ₹2,320 | 35 ₹2,800 | 35 ₹2,800 | 27 ₹2,160 | 55 ₹4,400 | 25 ₹2,000 Lowest | 35 ₹2,800 | 30 ₹2,400 |
| 3.00 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, complete all as specified and as directed by Engineer-in-charge. | 3.1 | CUM | 499 ₹1,546.9 | 635 ₹1,968.5 | 550 ₹1,705 | 425 ₹1,317.5 | 60 ₹186 Lowest | 400 ₹1,240 | 650 ₹2,015 | 530 ₹1,643 |
| 4.00 | Demolition of Cement concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level), complete all as specified and as directed by Engineer-in-charge. | 6.38 | CUM | 599 ₹3,821.62 | 635 ₹4,051.3 | 450 ₹2,871 | 425 ₹2,711.5 | 69 ₹440.22 Lowest | 400 ₹2,552 | 650 ₹4,147 | 605 ₹3,859.9 |
| 5.00 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) not exc. 1.5 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 6 | EACH | 89 ₹534 Lowest | 110 ₹660 | 250 ₹1,500 | 265 ₹1,590 | 90 ₹540 | 222 ₹1,332 | 170 ₹1,020 | 100 ₹600 |
| 6.00 | Taking down Chowkhats or frames with shutters (without taking off shutters from the frames) exc 1.5 sq. m but not exc. 4.0 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 6 | EACH | 99 ₹594 | 115 ₹690 | 350 ₹2,100 | 290 ₹1,740 | 90 ₹540 Lowest | 222 ₹1,332 | 200 ₹1,200 | 100 ₹600 |
| 7.00 | Taking down Shutters of any description not exc 1 sq. m each, complete all as specified and as directed by Engineer-in-charge. | 3 | PER LEAF | 49 ₹147 | 90 ₹270 | 50 ₹150 | 110 ₹330 | 70 ₹210 | 222 ₹666 | 60 ₹180 | 45 ₹135 Lowest |
| 8.00 | Hacking out old broken glass (any thickness, size, quality or description) from wooden/steel frames or stone, concrete or brick surrounds, glazed with putty or fixed with beads, complete all as specified and as directed by Engineer-in-charge. | 0.2 | SQM | 49 ₹9.8 | 30 ₹6 | 15 ₹3 Lowest | 28 ₹5.6 | 30 ₹6 | 25 ₹5 | 20 ₹4 | 45 ₹9 |
| 9.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises, complete all as specified and as directed by Engineer-in-charge. | 137 | SQM | 39 ₹5,343 | 50 ₹6,850 | 22 ₹3,014 | 33 ₹4,521 | 70 ₹9,590 | 25 ₹3,425 | 20 ₹2,740 Lowest | 60 ₹8,220 |
| 10.00 | Dismantling Asbestos cement (corrugated, semi-corrugated, etc.) sheets in roof coverings, complete all as specified and as directed by Engineer-in-charge. | 224 | SQM | 39 ₹8,736 | 55 ₹12,320 | 80 ₹17,920 | 42 ₹9,408 | 60 ₹13,440 | 25 ₹5,600 | 20 ₹4,480 Lowest | 50 ₹11,200 |
Tender Value
₹46.8 L
EMD Value
₹93,500
Closing Date
27 Aug 2025, 6:00 pmClosed
GE Rangia
GE Rangia C/O 99 APO Rangia
SPL REP TO BLDG NO ET-153, ET-154, ET-167 AND PROVN OF COOL ROOM WITH ATTACHED WASHROOM, STORE ROOM NEAR ET-641 AND TOILET BLOCK NEAR ET-150 AT HATTIGOR MIL STN UNDER GE RANGIA
2025_MES_715617_2
8921/RNG/E8
Open Tender
Civil Works
Item Rate
180 days
HATTIGOR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Rangia
₹93,500
Yes
15 Nov 2025
14 Aug 2025
29 Aug 2025
14 Aug 2025
27 Aug 2025
22 Aug 2025
14 Aug 2025 - 18 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .