Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.4 CrAccepted-AOC 802 8TH FLOOR KAILASH BUILDING 26 KASTURBA GANDHI MARG CONNAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | 1 | Accepted-AOC L1 Bidder | |
| 2 | 2₹20.2 Cr+₹2.8 Cr (16.1%)Rejected-AOC | 2 | Rejected-AOC L2 Bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical The bidder has not qualified in the BEC (Technical) |
| Sl No | Description | Qty | Unit | TULIP COMPRESSION PRIVATE LIMITED L1 | ATLAS COPCO INDIA LTD, CHICAGO PNEUMATIC COMPRESSOR DIV L2 |
|---|---|---|---|---|---|
| 1.00250SCMH INTEGRATED CNG PACKAGE AND ITS ASSOCIATED AUXILIARIES (SUPPLY) (Item no 1.1 of MR) | |||||
| 2.00 | Design, Engineering, Manufacturing, Supply (including packaging and forwarding, insurance, handling, loading and unloading at port and delivery & unloading at Client's store / site of skid mounted CNG electric Motor driven Integrated CNG package of Average 250 SM3 / hr capacity at suction pressure of 14-19 kg/cm2 and discharge pressure 255 kg/cm2(g) suitable for online stations with minimum foot prints. The package shall be inclusive of:
A) String test of complete compressor package with air/nitrogen along with electric motor and accessories at packagers' factory.
B) Special tools & tackles (list and price of each tool and tackles to be furnished by the bidder separately in Price Bid)
C) Design, Engineering, Manufacturing, Supply (including packaging and forwarding, insurance, handling and unloading at Client's store /site of air compressor of capacity approx 1.5 kW, discharge pressure approx 7 kg/cm2g , min 100 water litter air receiver and air dryer along with all accessories and auxiliaries.
Tentative location-wise break-up is : Kamrup & Kamrup Metropolitan GA-7 Nos. and Cachar, Hailakandi & Karimganj GA-3 Nos.
Actual Location(s) for delivery will be finalized at the time of Release Order (s). | 10 | Nos. | 90,00,000 ₹10,62,00,000 Lowest | 1,05,00,000 ₹12,39,00,000 |
| 3.00 | Freight upto store/site at Kamrup & Kamrup Metropolitan GA and Cachar, Hailakandi & Karimganj GA.
Location(s) for delivery will be finalized at the time of Release Order (s). (Item no 1.1 A & 1.1 B of MR) | 10 | Nos. | 2,00,000 ₹23,60,000 Lowest | 2,00,000 ₹23,60,000 Lowest |
| 4.00INSTALLATION, COMMISSIONING, TESTING (Item no 2.0 of MR) | |||||
| 5.00 | Installation, commissioning & Field performance test of integrated CNG Package including all accessories/ equipment(s) i.e. air compressor, CO2 flooding system etc. system at site.
(Item no 2.1 of MR) | 10 | Nos. | 25,000 ₹2,95,000 Lowest | 1,25,000 ₹14,75,000 |
| 6.00 | Per DIEM rate towards Extra visits. Rate to be inclusive of expenses towards boarding, lodging, travel, tools & tackles etc.
Note: Bidder to note that "Extra Visit" charges shall be payable only against visits made at site due to reasons directly attributable to the owner such as non-availability of Gas, infrastructure or any other reason which is not-attributable to the bidder.
No. of days considered for payment against this item shall be no. of days spent at site, as certified by Engineer-in-charge/ site-in-charge.
(Item no 2.2 of MR) | 10 | Nos. | 5,000 ₹59,000 | 1,000 ₹11,800 Lowest |
| 7.00 | In case integrated CNG package(s) is delivered to stores due to non-readiness of site, loading, Re-transportation from stores to unloading at site within the same city. (Item no 2.3 of MR) | 10 | Nos. | 25,000 ₹2,95,000 Lowest | 50,000 ₹5,90,000 |
| 8.00Total amount for supply,installation,testing & commissioning (inclusive of taxes) | |||||
| 9.00LUMP SUM ANNUAL OPERATION, REPAIR & COMPREHENSIVE MAINTENANCE etc. | |||||
| 10.00SERVICES FOR OPERATIONS & COMPREHENSIVE MAINTENANCE (Item no 3.0 of MR) | |||||
Tender Value
Refer Docs
EMD Value
₹20.4 L
Closing Date
6 Jul 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr. GM (Contracts), MECON Ltd
MECON Limited, 13th Floor Meeting Room, SCOPE Minar, North Tower Laxmi Nagar, District Center, Delhi - 110 092
PROCUREMENT OF ELECTRIC MOTOR DRIVEN INTEGRATED (COMPOSITE) CNG DISPENSING PACKAGE (2 YEARS ARC)
2024_PBGPL_195912_1
05/51/23VM/PBGPL/ICP
Open Tender
Machinery and Machining Tools
Supply
126 days
Purba Bharati Gas Private Limited, Guwahati
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹20.4 L
Yes
MECON Limited, 13th Floor Meeting
11 Aug 2025
21 May 2024
8 Jul 2024
21 May 2024
6 Jul 2024
13 Jun 2024
6 Jun 2024
Amount
250SCMH INTEGRATED CNG PACKAGE AND ITS ASSOCIATED AUXILIARIES (SUPPLY) (Item no 1.1 of MR)
Design, Engineering, Manufacturing, Supply (including packaging and forwarding, insurance, handling, loading and unloading at port and delivery & unloading at Client's store / site of skid mounted CNG electric Motor driven Integrated CNG package of Average 250 SM3 / hr capacity at suction pressure of 14-19 kg/cm2 and discharge pressure 255 kg/cm2(g) suitable for online stations with minimum foot prints. The package shall be inclusive of: A) String test of complete compressor package with air/nitrogen along with electric motor and accessories at packagers' factory. B) Special tools & tackles (list and price of each tool and tackles to be furnished by the bidder separately in Price Bid) C) Design, Engineering, Manufacturing, Supply (including packaging and forwarding, insurance, handling and unloading at Client's store /site of air compressor of capacity approx 1.5 kW, discharge pressure approx 7 kg/cm2g , min 100 water litter air receiver and air dryer along with all accessories and auxiliaries. Tentative location-wise break-up is : Kamrup & Kamrup Metropolitan GA-7 Nos. and Cachar, Hailakandi & Karimganj GA-3 Nos. Actual Location(s) for delivery will be finalized at the time of Release Order (s).
Freight upto store/site at Kamrup & Kamrup Metropolitan GA and Cachar, Hailakandi & Karimganj GA. Location(s) for delivery will be finalized at the time of Release Order (s). (Item no 1.1 A & 1.1 B of MR)
INSTALLATION, COMMISSIONING, TESTING (Item no 2.0 of MR)
Installation, commissioning & Field performance test of integrated CNG Package including all accessories/ equipment(s) i.e. air compressor, CO2 flooding system etc. system at site. (Item no 2.1 of MR)
Per DIEM rate towards Extra visits. Rate to be inclusive of expenses towards boarding, lodging, travel, tools & tackles etc. Note: Bidder to note that "Extra Visit" charges shall be payable only against visits made at site due to reasons directly attributable to the owner such as non-availability of Gas, infrastructure or any other reason which is not-attributable to the bidder. No. of days considered for payment against this item shall be no. of days spent at site, as certified by Engineer-in-charge/ site-in-charge. (Item no 2.2 of MR)
In case integrated CNG package(s) is delivered to stores due to non-readiness of site, loading, Re-transportation from stores to unloading at site within the same city. (Item no 2.3 of MR)
Total amount for supply,installation,testing & commissioning (inclusive of taxes)
LUMP SUM ANNUAL OPERATION, REPAIR & COMPREHENSIVE MAINTENANCE etc.
SERVICES FOR OPERATIONS & COMPREHENSIVE MAINTENANCE (Item no 3.0 of MR)
Lump sum Annual operation, repair & comprehensive maintenance charges per Integrated CNG package including air compressor for 1st year warrantee period inclusive of all manpower, spare parts, lubricants etc. (Item no 3.1 of MR) The quoted rate for this item must be equal to or more than 10% of rate of Item no. 1.1 quoted by the bidder (i.e. rate quoted against sl. no. 2).
Lump sum annual operation, repair & comprehensive maintenance charges per Integrated CNG Package including air compressor for second year i.e., after first year of warranty period inclusive of all manpower, spare parts, lubricants etc. (Item no 3.2 of MR) The quoted rate for this item must be equal to or more than 12% of rate of Item no. 1.1 quoted by the bidder (i.e. rate quoted against sl. no. 2).
Lump sum annual operation, repair & comprehensive maintenance charges per Integrated CNG Package including air compressor for third year i.e. after second year of AMC inclusive of all manpower, spare parts, lubricants etc. (Item no 3.3 of MR) The quoted rate for this item must be equal to or more than 14% of rate of Item no. 1.1 quoted by the bidder (i.e. rate quoted against sl. no. 2).
Lump sum annual operation, repair & comprehensive maintenance charges per Integrated CNG Package including air compressor for fourth year i.e. after third year of AMC inclusive of all manpower, spare parts, lubricants etc. (Item no 3.4 of MR) The quoted rate for this item must be equal to or more than 17% of rate of Item no. 1.1 quoted by the bidder (i.e. rate quoted against sl. no. 2).
Total amount for OPERATIONS & COMPREHENSIVE MAINTENANCE (inclusive of taxes)
NOTE : 1. The location wise quantities may vary considering project requirement. 2. Considering large size of GA's involving multiple districts/cities in each GA, as per requirement, supplies shall be made to designated sites/ stores which may be located anywhere within the GA. Exact location of stores shall be intimated prior to dispatch of material. 3. Quantity taken against item no 2.2 i.e.10 no. will be considered for evaluation and order placement purpose. However, payment will be made as per the actual days spent at site. 4. In case Integrated CNG packages are delivered to store due to non-readiness of site, Loading, Re-transportation of integrated CNG package from stores to unloading at site within same city shall be payable as per the quoted rates against item no. 2.3. Quantity taken against item no 2.3 i.e.10 nos. will be considered for evaluation and order placement purpose. However, payment will be made as per the actual no. of re-transportation cases. 5. Inspection shall be carried out by Owner / Consultant / TPIA. Cost of inspection shall be borne by the vendor. Third Party Inspection agency like Lloyds, ABS, SGS, TUV, DNV, BV, Engineers India Limited, or any other Third Party Inspection agency only with prior approval of CLIENT / CONSULTANTshall be engaged. 6. Rates for Annual operation, repair &comprehensive maintenance etc. shall be based on operations of 2 shifts per day (8 hours each) 7. Dumpsite for Kamrup&Kamrup Metropolitan GA and Cachar, Hailakandi&Karimganj GA are Guwahati and Silchar city respectively. Total Price for complete Scope of work incl. taxes is as given in row below.
ATLAS COPCO INDIA LTD, CHICAGO PNEUMATIC COMPRESSOR DIV (BID ID -715978)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .