Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 LAccepted-Finance C O BAUPUR MAJHAULIA DISTT CHAPRA BIHAR | SARAN | BIHAR | 841101 | ₹21.0 L | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹25.7 LRejected-Finance | ₹25.7 L | L2 | Rejected-Finance Not L1 bidder |
| 3 | L3₹29.6 LRejected-Finance Q NO A 29 POWER CITY JAMNIPALI KORBA CG 495450 | KORBA | CHHATTISGARH | 495450 | ₹29.6 L | L3 | Rejected-Finance Not L1 bidder |
| 4 | L4₹30.2 LRejected-Finance WARD NO 21 LIG 136 R P NAGAR KORBA CHHATTISGARH PIN 495677 | KORBA | CHHATTISGARH | 495677 | ₹30.2 L | L4 | Rejected-Finance Not L1 bidder |
| Sl No | Description | Qty | Unit | ANIRUDH KUMAR CHOUDHARY L3 | UTILITY ENTERPRISES L4 | AMARENDRA KUMAR RAI L1 | PAWAN KUMAR L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 5.47 | Cubic Meter | 6,650 ₹36,375.50 | 5,517.5 ₹30,180.72 | 4,000 ₹21,880 | 4,700 ₹25,709 |
| 2.00 | Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 922.15 | Cubic Meter | 550 ₹5.1 L | 612.6 ₹5.6 L | 450 ₹4.1 L | 500 ₹4.6 L |
| 3.00 | Transportation of material from colliery store to incline mouth at surface. Materials will be provided by the colliery managementa) belt structure 1000mm: 93.10 MT /b) PVC belt: 27.93MT/ c) Drive Head Complete set (2 nos): 16.0 MT. | 137.03 | Metric Tonnes | 405 ₹55,497.15 | 390.76 ₹53,545.84 | 300 ₹41,109 | 350 ₹47,960.50 |
| 4.00 | Transportation/Carriage of steel structure by manual labour including loading, unloading & Stacking the same for lead up to 50 m on surface. a) belt structure 1000mm: 93.10 MT /b) PVC belt: 27.93MT/ c) Drive Head Complete set (2 nos): 16.0 MT. | 137.03 | Metric Tonnes | 380 ₹52,071.40 | 390.76 ₹53,545.84 | 300 ₹41,109 | 350 ₹47,960.50 |
| 5.00 | Loading of material (Cement) into tub on surface within a lead of 50m. | 1.71 | Metric Tonnes | 200 ₹342 | 181.73 ₹310.76 | 200 ₹342 | 200 ₹342 |
| 6.00 | Loading of material (Sand) into tub on surface within a lead of 50m. | 2.32 | Cubic Meter | 350 ₹812 | 313.68 ₹727.74 | 300 ₹696 | 350 ₹812 |
| 7.00 | Loading of material (Stone aggregate below 40mm nominal size) into tub on surface within a lead of 50m. | 4.65 | Cubic Meter | 350 ₹1,627.50 | 313.68 ₹1,458.61 | 300 ₹1,395 | 350 ₹1,627.50 |
| 8.00 | Transportation/Carriage of steel structure by manual labour including loading, unloading & Stacking the same for lead up to 50 m in Underground. a) belt structure 1000mm: 93.10 MT /b) PVC belt: 27.93MT/ c) Drive Head Complete set (2 nos): 16.0 MT. | 137.03 | Metric Tonnes | 540 ₹73,996.20 | 532.28 ₹72,938.33 | 400 ₹54,812 | 500 ₹68,515 |
| 9.00 | Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 1.71 | Metric Tonnes | 140 ₹239.40 | 165.3 ₹282.66 | 200 ₹342 | 180 ₹307.80 |
| 10.00 | Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 2.32 | Cubic Meter | 290 ₹672.80 | 285.32 ₹661.94 | 300 ₹696 | 250 ₹580 |
Updated dates
Tender Value
₹43.9 L
EMD Value
₹55,000
Closing Date
14 Mar 2026, 11:00 amClosed
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Installation of complete belt structure, Marching of LHD/UDM, laying of haulage track line, Pipeline and Erection of temporary stopping at Dhelwadih UG Mine.
2026_SECL_354899_1
SECL/KB/GM/SO(M)/eNIT/25-26/24
Open Tender
Civil Works - Others
350 days
Korba
As per NIT
4 documents required · 4 mandatory
₹55,000
23 Apr 2026
27 Feb 2026
16 Mar 2026
27 Feb 2026
14 Mar 2026
28 Feb 2026
27 Feb 2026 - 3 Mar 2026
Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Transportation of material from colliery store to incline mouth at surface. Materials will be provided by the colliery managementa) belt structure 1000mm: 93.10 MT /b) PVC belt: 27.93MT/ c) Drive Head Complete set (2 nos): 16.0 MT.
Transportation/Carriage of steel structure by manual labour including loading, unloading & Stacking the same for lead up to 50 m on surface. a) belt structure 1000mm: 93.10 MT /b) PVC belt: 27.93MT/ c) Drive Head Complete set (2 nos): 16.0 MT.
Loading of material (Cement) into tub on surface within a lead of 50m.
Loading of material (Sand) into tub on surface within a lead of 50m.
Loading of material (Stone aggregate below 40mm nominal size) into tub on surface within a lead of 50m.
Transportation/Carriage of steel structure by manual labour including loading, unloading & Stacking the same for lead up to 50 m in Underground. a) belt structure 1000mm: 93.10 MT /b) PVC belt: 27.93MT/ c) Drive Head Complete set (2 nos): 16.0 MT.
Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Stone aggregate below 40mm nominal size) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Manual pushing of (Cement, Sand, Stone Chips) tubs in underground for 600 m.
Installation of 1000mm size double drive drum with loop take-up. Materials will be provided by colliery management including Electrical and Mechanical hand. (for underground)
Dismantling, Transportation & Installation of (1000 size) Tail end drum, drum base,tailend guard, side plate/loading brackets(chute),decking plates in UG within a lead of 100m. Materials will be provided by colliery management (for underground).
Installation of 1000mm in UG gallery. Equipment (i.e. Belting, trolley, Haulage & track line) will be provided by the Colliery Management.
Laying and fastening of PVC belting on conveyor structure. Materials( like PVC belting etc) will be provided by colliery management. (for underground)
Transportation, laying, charging of armoured cable from surface to underground or from old dist. to new dist. or vice-versa for a lead of 100m (length 200 m & size 70 mm2).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). DSR Item No. 4.1.3
Marching/shifting of 3 nos. LHD & 2 nos.UDM from from one distt to another distt. Total distance for marching about 2800 m. Materials will be provided by colliery management.
Dismantling of Haulage track line of 100m length i.e. 100×2=200m rail of 30lbs in UG. Materials will be provided by colliery management.
Transportation of 100m track line (i.e. 100m×2=200m rail of 30 lbs) from surface/ old working to site of installation in UG for a lead of 2 km. Materials will be provided by colliery management including Electrical and Mechanical Hands
Laying of haulage track line of 100m length with 30lbs rail (100m×2) and Installation of crossing on track line in underground. Materials(e.g. trolley, haulage facility etc) will be provided by colliery management.
Packing of haulage track (1.20 m wide & 0.20 m thick) in UG with packing materials available within a lead of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management.
Loading of pipes at Surface, securing and pushing the loaded troly upto incline mouth and from there to panel upto a lead of 2 KM. (a) For 2" dia pipes of 6 meters length.
Transportation from one district to another district in UG. Materials like pipe fitted with flange/ socket, nut bolts, and necessary gas with cutting facility will be provided by the Colliery Management including Mechanical hand wherever necessary. lead upto 100 m for 2" dia pipes of 6 meters length.
Erection of temporary stopping by old reject conveyor belt in UG. Materials (like reject belt conveyor & pipe etc) will be provided by the colliery management.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 0.43 MB
Tendernotice_3.pdf
PDF • 0.74 MB
BOQ_367728.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid