Public Works Department
Supply, Erection, Testing & Commissioning of 1 No of 6 Passenger 3 stops elevators to Hostel Building and 1 No of 6 Passenger 4 stops elevators to Block-1 Quarters including construction of lift shaft at Fiscal Policy Institute, Kengeri, Bangalore.
PWD/2025-26/EL/WORK_INDENT22497
PWD/2025-26/EL/WORK_INDENT22497
Open
Electrical
Two Tender Document System(Two Cover)
PWD Electrical Division Office Bengaluru
₹1,310
₹1.1 L
4 Dec 2025
4 Dec 2025
19 Dec 2025
12 Dec 2025
Supply, Erection, Testing & Commissioning of 1 No of 6 Passenger 3 stops elevators to Hostel Building and 1 No of 6 Passenger 4 stops elevators to Block-1 Quarters including construction of lift shaft at Fiscal Policy Institute, Kengeri, Bangalore.
Design, supplying, erecting testing and commissioning of - Passenger lift with speed of 1mtr per second, variable voltage variable frequency drive, without machine room for the available well size, op...
Design, supplying, erecting testing and commissioning of - Passenger lift with speed of 1mtr per second, variable voltage variable frequency drive, without machine room for the available well size, op...
Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board. 32-40A 4 pole (5.20.8) ---- Items of work are including cost and co...
Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit bre...
Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of O...
Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C.(5.38) ---- Items of work are including cost and conveyance of all ma...
Supplying, fixing and wiring rotary selector switch suitable for Ammeter. (5.27) ---- Items of work are including cost and conveyance of all materials, labour charges for all items of work with al...
Supplying, fixing and wiring rotary selector switch suitable for Voltmeter. (5.28) ---- Items of work are including cost and conveyance of all materials, labour charges for all items of work with ...
Supplying and fixing/replacing of 6/16/32Amps electrical accessories on existing switch board. (3.14)6A Pendant Holder(3.14.6) ---- Items of work are including cost and conveyance of all materials, la...
Supplying and fixing of LED Bulkhead of 10W with IP65 protection and IK 08 impact resistance suitable for surface and wall mounting applications. (11.15) ---- Items of work are including cost and conv...
Supplying heavy gauge PVC conduit pipe ....... dia ....... mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case...
Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wir...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified I...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified I...
Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/N...
Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing m...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps one way Switch (3.6.1) ---- Items of work are including cost and conve...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6Amps 3way socket (3.6.3) ---- Items of work are including cost and conveyan...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 16Amps one way switch (3.6.7) ---- Items of work are including cost and conv...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16Amps universal socket (3.6.10) ---- Items of work are including cost and...
Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. 12" Sweep (300mm) (6.2.1) ---- Items of work are including cost and conveyance of ...
Fixing one exhaust fan after making a suitable notch in the wall and finishing with cement mortar and colouring to match the existing wall or brackets, with bolts and nuts and a 5 A, ceiling ro...
Supply of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-397...
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff. LT Cable 2.5 to 25 Sqmm (BESCOM SR 31.05 Page No 09, Sl No 230)...
Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed o...
Supplying and running of GI/Copper strips for grounding connections, using necessary fixing materials as required. 25x3mm GI strip (12.58.2) ---- Items of work are including cost and conveyance of al...
Supplying, fixing and wiring 3 Phase Digital Ammeter /Voltmeter. (5.29) ---- Items of work are including cost and conveyance of all materials, labour charges for all items of work with all lead and ...
Fabricating supplying and mounting MS box made out ....SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front...
Construction of Lift Shaft At hostel Building and Quaters Building Block-1 in fiscal policy Institute Kengeri Bangalore
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Ground Floor Demolishing brick work manually/ by mechanical means including stackingof serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of ...
First Floor Demolishing brick work manually/ by mechanical means including stackingof serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of E...
Second Floor Demolishing brick work manually/ by mechanical means including stackingof serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of ...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Below Ground Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mix...
Ground Floor Beam Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m heigh...
First floor Beam Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height...
Second floor Beam Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m heigh...
Ground Floor Column Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m hei...
First Floor Column Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m heig...
Second Floor columnProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m heig...
Roof Slab Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The g...
Ground Floor Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding...
First Floor "Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding...
Second Floor "Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/weldin...
Ground Floor Lift Wall Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost o...
First Floor Lift Wall Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of...
Second Floor Lift Wall Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost o...
Outside Plastering Ground Floor Lift Wall Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer...
Frist Floor Lift Wall Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement p...
Second Floor Lift Wall Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement ...
Inside Plastering Ground Floor Lift wall Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever requi...
First Floor Lift wall Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth renderin...
Second Floor Lift Wall Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth renderi...
Ground Floor Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth compl...
First Floor Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth comple...
Second Floor Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth compl...
Inside Painting Ground Floor "Wall painting with acrylic emulsion paint of approved brand and
manufacture to give an even shade :Two coats on new work after
thoroughly brooming the surface to remove a...
First Floor "Wall painting with acrylic emulsion paint of approved brand and
manufacture to give an even shade :Two coats on new work after
thoroughly brooming the surface to remove all dirt, dust, mo...
Second Floor "Wall painting with acrylic emulsion paint of approved brand and
manufacture to give an even shade :Two coats on new work after
thoroughly brooming the surface to remove all dirt, dust, m...
Outside Plastering Ground Floor Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer appli...
First Floor Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²)...
Second Floor Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²...
Ground Floor Lift opening wall Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity coun...
First Floor Lift Front side Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counter...
Second Floor Lift Front sideProviding and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counter...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied ...
Construction of Lift Shaft At Residential Quarters Building in Fiscal Policy Institute Kengeri Bangalore
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Existing Parpet brick wall Ground Floor Demolishing brick work manually/ by mechanical means including stackingof serviceable material and disposal of unserviceable material to the appropriate disposa...
Existing Parpet brick wall First Floor Demolishing brick work manually/ by mechanical means including stackingof serviceable material and disposal of unserviceable material to the appropriate disposal...
Existing Parpet brick wall Second Floor Demolishing brick work manually/ by mechanical means including stackingof serviceable material and disposal of unserviceable material to the appropriate disposa...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super...
Ground Floor Beam Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m heigh...
First floor Beam Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height...
Second floor Beam Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m heigh...
Third floor Beam Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height...
Ground Floor column Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m hei...
First Floor column Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m heig...
Second Floor column Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m hei...
Third Floor column Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m heig...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
Ground Floor Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding...
First Floor "Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding...
Second Floor"Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding...
Third Floor"Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding ...
Ground Floor Lift wall Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost o...
First Floor Lift wall Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of...
Second Floor Lift wall Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost o...
Third Floor Lift wall Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of...
Ground Floor Lift wall "Providing 18 mm cement plaster in two coats under layer 12 mm thick
cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement...
First Floor Lift wall "Providing 18 mm cement plaster in two coats under layer 12 mm thick
cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement ...
Second Floor Lift wall "Providing 18 mm cement plaster in two coats under layer 12 mm thick
cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement...
Third Floor Lift wall "Providing 18 mm cement plaster in two coats under layer 12 mm thick
cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement ...
Ground Floor Lift wall Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth renderi...
First Floor Lift wall Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth renderin...
Second Floor Lift wall Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth renderi...
Third Floor Lift wall Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth renderin...
Ground Floor Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth compl...
First Floor Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth comple...
Second Floor Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth compl...
Third Floor Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth comple...
Ground Floor Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mo...
First Floor Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mor...
Second Floor Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mo...
Third Floor Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mor...
Ground Floor Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²...
First Floor Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²)...
Second Floor Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²...
Third Floor Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²)...
Ground Floor Lift opening wall Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity coun...
First Floor Lift Front side Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counter...
Second Floor Lift Front sideProviding and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counter...
Third Floor Lift Front sideProviding and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied ...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .