| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.2 LAccepted-AOC H 99 6TH CROSS STREET R M COLONY DINDIGUL | L1 | Accepted-AOC work order | |
| 2 | L2₹95.4 L+₹4.2 L (4.56%)Rejected-Finance MADURAI MADURAI TAMIL NADU | MADURAI | TAMIL NADU | 625001 | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SIGRUN VERTRAG PROJECTS L1 | SRI KUMARAN CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1.Strengthening the road from Vadamadurai - Senguruchi road to Pichampatty (via) Sadiyampatty in km. 0/0 - 1/550 (R 25). Estimate amount : Rs. 96.37 Lakhs | |||||
| 2.00 | A. Construction work
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 2,419.56 | M2 | 6 ₹14,517.36 Lowest | 6.1 ₹14,759.32 |
| 3.00 | Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A | 1,675.09 | M3 | 140 ₹2,34,512.6 Lowest | 147 ₹2,46,238.23 |
| 4.00 | Picking the existing old metal for the B.T. surface and sectioning the undulations and all compacting charges etc., complete | 1,551 | M2 | 23 ₹35,673 Lowest | 24 ₹37,224 |
| 5.00 | Providing and Laying Gravel to a compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 418.78 | M2 | 341 ₹1,42,803.98 Lowest | 358 ₹1,49,923.24 |
| 6.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 7.00 | Km 0/0 - 1/000 | 445.03 | M3 | 2,562.2 ₹11,40,255.87 Lowest | 2,690 ₹11,97,130.7 |
| 8.00 | Km 1/0 - 1/550 | 255.15 | M3 | 2,562.2 ₹6,53,745.33 Lowest | 2,690 ₹6,86,353.5 |
| 9.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 4,668 | M3 | 87.3 ₹4,07,516.4 Lowest | 91 ₹4,24,788 |
| 10.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 4,740 | M2 | 20.4 ₹96,696 Lowest | 21 ₹99,540 |
Tender Value
Refer Docs
EMD Value
₹97,000
Closing Date
24 Feb 2026, 3:00 pmClosed
The Project Director,DRDA,DINDIGUL
The Project Director,DRDA,DINDIGUL
Strengthening and 5 years maintenance of 1 no road works in Shanarpatty Block NABARD RIDF 2026-2027 in Dindigul District TN05-30
2026_RDTN_658274_1
DIPR-1062-Tender 2026
Open Tender
Civil Works
Item Wise
180 days
DRDA
Strengthening and 5 years maintenance of 1 no road works in Shanarpatty Block NABARD RIDF 2026-2027 in Dindigul District TN05-30
3 documents required · 3 mandatory
₹0
₹97,000
DRDA,DINDIGUL
17 Mar 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of the work : 1.Strengthening the road from Vadamadurai - Senguruchi road to Pichampatty (via) Sadiyampatty in km. 0/0 - 1/550 (R 25).
Estimate amount : Rs. 96.37 Lakhs | - | - | - | - |
| 2 | A. Construction work
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 2,419.56 | M2 | - | - |
| 3 | Earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per SS20A | 1,675.09 | M3 | - | - |
| 4 | Picking the existing old metal for the B.T. surface and sectioning the undulations and all compacting charges etc., complete | 1,551 | M2 | - | - |
| 5 | Providing and Laying Gravel to a compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 418.78 | M2 | - | - |
| 6 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | - | - | - | - |
| 7 | Km 0/0 - 1/000 | 445.03 | M3 | - | - |
| 8 | Km 1/0 - 1/550 | 255.15 | M3 | - | - |
| 9 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 4,668 | M3 | - | - |
| 10 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 4,740 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.07 MB
Tendernotice_2.pdf
PDF • 0.67 MB
BOQ_789704.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .