| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical WEST BENGAL | Rejected-Technical AS PER RFP |
| 4 | Rejected-Technical | Rejected-Technical AS PER RFP |
Tender Value
Refer Docs
EMD Value
₹22.6 L
Closing Date
25 Nov 2019, 2:30 pmClosed
AGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
RE-TUBING OF 04 BOILERS ONBOARD INDIAN NAVAL SHIP
2019_NAVY_282891_1
DYT/BEF/19-20/106(A)/PL -INCOD/IN SHIP-BOILERS/325
Open Tender
Medical Equipments/Waste
240 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹22.6 L
Yes
NAVAL DOCKYARD MUMBAI
24 Nov 2020
17 Sept 2019
26 Nov 2019
17 Sept 2019
25 Nov 2019
27 Sept 2019
19 Oct 2019
Amount
Degutting of outer & inner casing of boiler along with pipes and valves that may come in the way of access as indicated
Degutting of Superheater drain valves and piping
Degutting of Steam drain valves (LP/HP) and pipes fitted along the length of the boiler casing
Degutting of Valves and piping associated with the Boiler casing fire fighting system
Degutting of Valves and piping associated with the atomizing steam manifold
Degutting of Valves and piping associated with the burner (front and rear) assembly
Burner register and associated fitting, including the shark teeth arrangement
Degutting of Hot insulation of boiler, it’s associated auxiliaries, pipes, valves and requisite area to facilitate unshipping route
Opening of all removable doors and survey of the same for requirement of repairs to any
Opening of steam drum, water drum and Superheater bottom header of boilers and removal of internal fittings
Cleaning and preservation/repairs of all internal fittings of the drums as per specification in the boiler repair manual.
Degutting of Gas cleaner of all 04 boiler
Chemical cleaning of gas cleaner
Breaking of refractory for tube access and renewal
Breaking of monolith wall (front wall) for repairs including burner front quarls
Removal and blanking of all mountings.
Degreasing and Pressure testing of tubes.
Renewal of Tubes includes cutting of existing tubes, splitting of tube ends from steam drum, drifting of tubes from water drum, tube bending as per detailed scope at sl (t) of contractor’s liability.
Installation of Screen row tube includes fitment, setting, rolling, expanding and belling of tubes from both steam and water drums as specified in the boiler manuals and at enclosure 2 to SOW
Installation of Generating row tube includes fitment, setting, rolling, expanding and belling of tubes from both steam and water drums as specified in the boiler manuals and at enclosure 2 to SOW.
Superheater tube includes fitment, setting, rolling, expanding and belling of tubes from both steam and water drums as specified in the boiler manuals and at enclosure 2 to SOW
Renewal of superheater header if the material condition of the header ( as indicated by CBIU) is bad
Headers repairs if not required to be renewed as per CBIU report
Installation of Economiser Tubes involves welding to the manifold and manufacturing of bends that are required to be welded to the manifold.
Renewal of downcomer tubes as per OEM boiler maintenance manual.
Water pressure test of boiler
Laying out all refractory and tile work in accordance to the procedure laid out in the boiler repair manual.
Undertake repairs/make burner quarls to that burner alignment is satisfactory.
Re-gutting of Gas cleaner of all 04 boiler
Re-gutting of internal casing and fitment of all removable and cut casing doors
Re-gutting of external casing with all insulation, pipes and valves that were degutted.
APT of inner and outer casings of all four boilers
Installation of all internal fittings after clearance by CBIU
Boxing up of steam drum and water drum after WPT and clearance by CBIU and SS for final time prior to steaming
Re-gutting of Hot insulation of boiler, it’s associated auxiliaries, pipes, valves and other degutted area
Provisioning of Special Tools
Firm to facilitate the third party inspection by contracting OEM/LRS/ABS/Class societies/certified boiler inspector for all check points/ hold points as per approved/ vetted QAP.
ULTRA MARINE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid