Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC | ₹4.4 Cr | L1 | Accepted-AOC Sri Jeetesh Ranjan Behera, A-Class Degree Engineering Contractor is winner of the lottery. |
| 2 | L1₹4.4 CrRejected-AOC | ₹4.4 Cr | L1 | Rejected-AOC Sri Jeetesh Ranjan Behera, A-Class Degree Engineering Contractor is winner of the lottery. |
| 3 | L1₹4.4 CrRejected-AOC AT BELTIKIRI SADAR DHENKANAL | DHENKANAL | ODISHA | 759001 | ₹4.4 Cr | L1 | Rejected-AOC Sri Jeetesh Ranjan Behera, A-Class Degree Engineering Contractor is winner of the lottery. |
| 4 | L1₹4.4 CrRejected-AOC | ₹4.4 Cr | L1 | Rejected-AOC Sri Jeetesh Ranjan Behera, A-Class Degree Engineering Contractor is winner of the lottery. |
| 5 | L1₹4.4 CrRejected-AOC | ₹4.4 Cr | L1 | Rejected-AOC Sri Jeetesh Ranjan Behera, A-Class Degree Engineering Contractor is winner of the lottery. |
Tender Value
₹5.1 Cr
EMD Value
₹5.1 L
Closing Date
12 Feb 2025, 5:30 pmClosed
Chief Construction Engineer
O/o the Chief Construction Engineer, Deo Irrigation Project, Karanjia, Dist-Mayurbhanja, Odisha, PIN-757037
Balance Work of Tail Minor from RD 5000 to RD 6900m off taking at RD 32690 m of Right Main Distributary and 03 (three) Nos. of Sub Minors including structure of Deo Irrigation Project for the year-2024-25
2025_CCEDI_109801_1
04/CCEDIP of 2024-25(6)
Open Tender
Civil Works - Canal
Percentage
270 days
pingu
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹5.1 L
Yes
17 May 2025
29 Jan 2025
13 Feb 2025
29 Jan 2025
12 Feb 2025
29 Jan 2025
29 Jan 2025 - 10 Feb 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Shrub jungles uprooting stumps and small bushes and trees below 0.30m grith and depositing of debris clear of work site with all leads and lifts complete etc. complete including all cost incidental to work but excluding GST as per specification and direction of Engineer-in-charge. | - | - | 0.4 | - |
| 2 | Triangular or square section trench cutting of 0.15 m deep for alignment and demarcation purpose including measuring and marking lines with etc. complete including all cost incidental to work but excluding GST as per specification and direction of Engineer-in-charge. | - | - | 8.6 | - |
| 3 | Excavation in canal/drain by mechanical means in all kind of soil (this shall include sandy soil, ordinary soil, hard soil, gravelly soil, slushy soil, stony earth mixed with gravels, stiff heavy clay, hard shale, compact moorum, soling of road path, sand, silt etc.) in both wet & dry condition, trimming of slope & bed to design section including stump removal, shoring, strutting, propping bullahs, pilling, dewatering and removing the excavated materials with all leads and de-lift, etc and depositing the useful excavated materials in the embankment sections in layers not exceeding 22.50 cm. in depth breaking clods to maximum 5 cm to 7cm size and depositing the unsuitable earth in spoil bank or any other specified space loading into and unloading by mechanical means and transportation by transportation vehicle with all lead, lift and de-lift complete with hire & running charges of machineries, all costs for site illumination, mobilisation, demobilisation, construction of approach road & diversion road, coffer dams and all taxes and cess etc. complete including all cost incidental to work but excluding GST as per specification and direction of Engineer-in-charge. | 0.6 | - | 82 | ₹49.12 |
| 4 | Excavation of any approved type of soil in borrow area by Mechanical means loading into and transporation by mechanical means and unloading the soilinitial leads, lifts, and de-lifts including shoring, shuttering, propping bullahas, pilling including cost, of dewatering, drainage arrangement & slush removal if required & ramming the foundation and removing stumps and roots of trees including stacking the excavated materials away from the site mobilisation and demobilisation , supply of all equipments, materials tools and plants & labour required for the work, supervision charges, all taxes, cess, etc. with all incidental charges to complete the item of work but excluding GST as per direction of the Engineer in charge. (Measurement and payment will be made on finished level section of earth after deduction of earth utilised from the cutting section of canal. Contractor has to arrange borrow earth at his own cost). | - | - | 227.9 | - |
| 5 | Watering, rolling and compacting with dozzer and sheep foot roller over surface of the earth work, in each layer of canal embankment up to specified heights with all leads, de-lifts as per approved section at OMC to achieve the required compacted density of 95% with all cost including hire and running charges of machineries and cost of mobilisation, demobilisation, approach road, diversion road, site illumination, all cost incidental to work but excluding GST as per drawing, specification and direction of Engineer-in-charge.(measurement to be taken on the finished compacted section of the fill under OMC condition) | - | - | - | - |
| 6 | Filling sand in foundation well watered and rammed in layers as per drawing & specification with al with all leads, lifts and de-lifts including cost, conveyance, taxes & royalty of sand, T & P , labour & Cess etc. complete including all cost incidental to work but excluding GST as directed by the Engineer-in-charge. | - | - | 1,107.6 | - |
| 7 | Providing and laying of P.C.C confirming to M-15 grade using hard granite crusher broken aggregate of size 40 mm & downgraded mixed mechanical means including cost & conveyance of all materials to mixing yard and transportation of mixed concrete for laying on approved surface as per approved drawing, with all lead, lift, de-lift and transportation by manual/mechanical means including cost, conveyance, royalty, taxes of all materials, labour & Cess including dewatering by suitable means, vibrating the concrete by mechanical means, hire & running charges of machineries, curing for specified days by suitable means supervision charges including mobilisation and demobilisation with cost of construction and dismantling of gang ways and scaffolding including construction of cofferdam, approach road, diversion road, site illumination etc. complete as per approved drawing with all cost incidental to the work but excluding GST as directed by the Engineer-in-charge. | 0.8 | - | 5,557 | ₹4,445.6 |
| 8 | 牐癯摩湩湡慬楹杮漠捦浥湥⁴潃据敲整漠牧摡ⵍ㔱眠瑩〲洠…潤湷牧摡摥洠硩摥洠捥慨楮慣敭湡湩汣摵湩潣瑳☠挠湯敶慹据景愠汬洠瑡牥慩獬琠業楸杮礠牡湡牴湡灳牯慴楴湯漠業數潣据敲整映牯氠祡湩湯愠灰潲敶畳晲捡獡瀠牥愠灰潲敶牤睡 | 0.2 | - | 5,874.3 | ₹1,174.86 |
| 9 | and running charges of PRR including the cost, carriage, royalty and taxes of moorum and all other materials as required with all labour, T&P, with all leads, lifts and delifts etc. complete in all respect but excluding GST as directed by the Engineer-in-charge.lFilling in foundation trenches with useable quality of earth available from foundation excavation in layer not exceeding 15 cm thick including watering ramming manually or mechanically fully compacted with all leads, lifts and de-lifts, tools and plants, all taxes, labour, Cess and cost incidental to work but excluding GST as per direction of Engineer-in-charge. Sqm Rmt Cum Qntl R/MR/MCumSqmNTender Inviting Authority: Chief Construction Engineer, Deo Irrigation ProjectÚName of Work: Balance Work of Tail Minor from RD 5000 to RD 6900m off taking at RD 32690 m of Right Main Distributary and 03 (three) Nos. of Sub Minors including structure of Deo Irrigation Project for the year-2024-25"Contract No: 04/CCEDIP of 2024-25 | 0.6 | - | 6,378.7 | ₹3,827.22 |
| 11 | Supplying, providing and straightening the coiled or bent up HYSD bars of approved quality confirming to grade as specified, cutting, bending and placing the grills in position and binding the grills in position binding with wire 18 to 20 SWG, lapping, splicing, welding the joints wherever necessary for RCC work as per approved design, drawing with all lead, lift and delift and all cost of materials, labour, T&P, conveyance, taxes of all materials, labour & cess with cost of mobilization, demobilization, diversion road, approach road, site illumination etc. complete cost with all incidental to the work but excluding GST and as per specification and direction of the Engineer-in-charge. | 0.8 | - | 9,084.6 | ₹7,267.68 |
stage.html
html • 0.13 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 17.30 MB
BOQ.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .