| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹27.6 LAccepted-AOC DC COMPLEX FAZILKA | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹31.2 L+₹3.6 L (13.0%)Rejected-AOC ABOHAR | L-2 | Rejected-AOC L-2 | |
| 3 | L-3₹32.8 L+₹5.2 L (18.7%)Rejected-AOC 269 VEER COLONY BATHINDA | L-3 | Rejected-AOC L-3 |
| Sl No | Description | Qty | Unit | VARSHA CONSTRUCTION CO L2 | VARINDER KUMAR CONTRACTOR L3 | ATUL ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with Hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto
30m | 1,243.02 | cum | 42 ₹52,206.84 | 44 ₹54,692.88 | 35.82 ₹44,524.98 Lowest |
| 2.00 | Rehandling of earth work with avg. lead 30 Mtr. | 984.96 | cum | 34 ₹33,488.64 | 35 ₹34,473.6 | 28.66 ₹28,228.95 Lowest |
| 3.00 | Extra for Puddling work (for compaction) | 598.67 | cum | 115 ₹68,847.05 | 118 ₹70,643.06 | 95.87 ₹57,394.49 Lowest |
| 4.00 | Earthwork in excavation in foundation trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 m depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavated and subsequent filling
around masonry in 15cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 52.9 | cum | 191 ₹10,103.9 | 237 ₹12,537.3 | 15 ₹793.5 Lowest |
| 5.00 | Laying cement concrete M-10 with stone ballast or shingle machine mixed. | 43.38 | cum | 5,941 ₹2,57,720.58 | 5,941 ₹2,57,720.58 | 4,791.83 ₹2,07,869.59 Lowest |
| 6.00 | Plain Cement Concrete M15 in open Foundation complete as per drawing
and Technical Specifications Using Concrete Mixer (CSR 21.7A) | 1.92 | cum | 6,851 ₹13,153.92 | 6,851 ₹13,153.92 | 5,525.07 ₹10,608.13 Lowest |
| 7.00 | Reinforced Cement Concrete M-30 mechanically natch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in foundation and
plinth. | 32.79 | cum | 8,614 ₹2,82,453.06 | 8,614 ₹2,82,453.06 | 6,946.79 ₹2,27,785.24 Lowest |
| 8.00 | Reinforced Cement Concrete M-25 mechanically natch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in foundation and
plinth. | 103.17 | cum | 8,235 ₹8,49,604.95 | 8,235 ₹8,49,604.95 | 6,641.28 ₹6,85,180.86 Lowest |
| 9.00 | First Class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. | 4.71 | cum | 6,122 ₹28,834.62 | 6,326 ₹29,795.46 | 5,102.11 ₹24,030.94 Lowest |
| 10.00 | 10mm thick cement plaster 1:4 CSM complete in all respects. Item CSR 15.6 | 30.88 | Sqm. | 211 ₹6,515.68 | 218 ₹6,731.84 | 176.11 ₹5,438.28 Lowest |
Tender Value
₹29.2 L
EMD Value
₹58,438
Closing Date
4 Jul 2025, 9:00 amClosed
XEN DCD FZK
XEN DCD FZK
Constructing Water course crossing at RD 27800 of Abul Khurana Outfall Drain
2025_WR_142958_1
17/2025-26
Open Tender
Civil Works
Item Rate
35 days
XEN DCD FZK
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹58,438
6 Nov 2025
21 Jun 2025
4 Jul 2025
21 Jun 2025
4 Jul 2025
21 Jun 2025
Amount
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with Hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m
Rehandling of earth work with avg. lead 30 Mtr.
Extra for Puddling work (for compaction)
Earthwork in excavation in foundation trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 m depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavated and subsequent filling around masonry in 15cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Laying cement concrete M-10 with stone ballast or shingle machine mixed.
Plain Cement Concrete M15 in open Foundation complete as per drawing and Technical Specifications Using Concrete Mixer (CSR 21.7A)
Reinforced Cement Concrete M-30 mechanically natch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in foundation and plinth.
Reinforced Cement Concrete M-25 mechanically natch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in foundation and plinth.
First Class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth.
10mm thick cement plaster 1:4 CSM complete in all respects. Item CSR 15.6
Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete
Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering) including attached pilasters, buttresses etc
Centering and shuttering for flat surfaces such as Suspended floors, roofs, landings, chajjas, shelves etc (CSR 9.8)
Making dewatering arrangement by pumping set 4"x4" (8BHP)
Making bore and installation of pumping set for dewatering arrangements complete in all respects.
Providing, Lowering, jointing and cutting of RCC 600 mm dia Pipe NP2 Type S&S Pipes and Specials with rubber ring ISI marekd as per IS code
Providing orange Colour Safety Footrest of minimum 6mm thick plastic encapsulated as per IS:10910 on 12mm dia steel bar confirming to IS: 1786 having minimun cross section as 23mm x 25mm and over all minimum length 263mm and width as 165mm (with 300mm spacing between foot steps).
Water proofing of water tanks with Zydex Zycoprime/Elastobar /Equivalent solution so as to form a water-resistant cementitious bonding coat and to formon-site seamless cross-linked elastomeric membrane on the concrete surface to reduce its porosity. Creating a cementitious elastomeric polymeric membrane of Elastobar and Zycoprime/Equivalent after application of Zycosil & Zycoprime Solution in New Construction. Take equal parts of Elastobar and Cement and form a paste.Add little water tot he paste to make it brushable. Apply the paste on surface with brush. Leave the surace for drying for at least 4-6 hours to get elastomeric membrane. After this application, make one more layer of rough cementatios membrane using mixture of 1 Part of Zycoprime+1 Part of Cement+1 part of fine sand.Apply paste on the surface with a brush to make a rough texture. Now your surface is ready to bond well with tiles/screed
Any others item
VARSHA CONSTRUCTION CO (BID ID -657599)
VARINDER KUMAR CONTRACTOR (BID ID -657617)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .