| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.4 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹26.9 L+₹43,192.22 (1.63%)Rejected-Finance | L2 | Rejected-Finance L2 Greaterthen L1 |
| Sl No | Description | Qty | Unit | Venbha Construction and Suppilers L1 | R.SURESH KUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work :1.Construction of 200000 lit Capacity Sump @ Kalappanaickenpalayam H/O Somaiyampalayam panchayat | |||||
| 2.00 | Earth work excavation and depositing on banks with initial lead and lift in gravelly soil stiff clay, hard stiff clay, murram, boulders mixed with gravel as per SS 20-B for foundation. | 163.43 | Cum | 246.5 ₹40,285.5 Lowest | 250 ₹40,857.5 |
| 3.00 | Second Depth | 49.03 | Cum | 246.5 ₹12,085.9 Lowest | 250 ₹12,257.5 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance, labour charges etc. | 24.51 | Cum | 5,433.5 ₹1,33,175.09 Lowest | 5,500 ₹1,34,805 |
| 5.00 | Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete For 0 to 3.30 m (plane Surface) | 6.93 | Sqm | 1,033 ₹7,158.69 Lowest | 1,100 ₹7,623 |
| 6.00 | Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete For 3.30 to 4.30 m (plane Surface) | 73.89 | Sqm | 1,033 ₹76,328.37 Lowest | 1,100 ₹81,279 |
| 7.00 | Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete For 0 to 3.30 m (Curved Surface) | 219.92 | Sqm | 1,549.5 ₹3,40,766.04 Lowest | 1,600 ₹3,51,872 |
| 8.00 | Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete For 0 to 3.30 m (Circular Column ) | 0.97 | Sqm | 2,065 ₹2,003.05 Lowest | 2,100 ₹2,037 |
| 9.00 | Supply and fabrication of steel for RCC works including cost and conveyance charges etc | 6.14 | mt | 89,988.5 ₹5,52,529.39 Lowest | 90,000 ₹5,52,600 |
| 10.00 | RCC 1 :1.5 : 3 mix using 20mm ISS HBG metal including cost and conveyance of all materials but excluding centering charges including labour charges for mixing laying concrete etc., complete 1.50 m to 4.5 m Below GL | 28.03 | Cum | 9,244.82 ₹2,59,132.3 Lowest | 9,300 ₹2,60,679 |
Tender Value
₹27 L
EMD Value
₹27,000
Closing Date
13 Oct 2025, 3:00 pmClosed
Somayampalayam Panchayat
Somayampalayam Panchayat
Construction of 200000 lit Sump at kalappanickenpalayam H/O somaiyampalayam panchayat
2025_RDTN_610636_1
ROC NO.1774.2024.B2 DATE.30.09.2025
Open Tender
Civil Works
Item Rate
Somayampalayam Panchayat
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹27,000
Yes
27 Oct 2025
30 Sept 2025
13 Oct 2025
30 Sept 2025
13 Oct 2025
30 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .