Loading
Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹30 L
Closing Date
31 Jan 2025, 3:00 pmClosed
PR & CC
This tender is being floated for refueller fabrication. For details please refer tender documents.
2400018556-HD-09050
5100018556
Open Tender
Unknown (Unspecified Location)
₹0
₹30 L
31 Jan 2025
10 Jan 2025
31 Jan 2025
31 Jan 2025
10 Jan 2025 - 17 Jan 2025
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | DESIGN&FAB REFUELLER- | DESIGN&FAB REFUELLER- — /16 KL AIRCRAFT REFUELLER-FABRICATION OFREFUELLER-AVIATION SERVICE FACILITY-DESIGN,SUPPLY OF MATERIALS, FABRICATION OF EQUIPMENT UNDER THIRD PARTY INSPECTION, TESTING ANDCOMMISSIONING OF 15/16 KL CAPACITY, 1500 LPM FLOWRATE CAREFULLER FOR HPCL. THE AVIATION EFUELERSHALL CONSIST OF THE FOLLOWING: A. A SUITABLECHASSIS WITH P.T.O. AND CABIN. B. THE TANK, PUMP,POWER TAKE-OFF, DELIVERY PING AND THE REFUELINGMODULE (CONSISTING OF THE FILTER VESSEL WITHELEMENTS, PRESSURE CONTROL VALVE, METERS, HOSEREELS ETC.E. T FLOW CAPACITY OF THE REFUELERWOULD BE 1500 LPM. C. THE CONTROL SYSTEMS WHICHCOMPRISES OF THE PNEUMATIC CIRCUIT, THE ATFSENSIN CIRCUIT AND THE ELECTRICAL CIRCUIT. D.SAFETY FITTINGS REQUIRED TO BE FITTED ON THEVEHICLE AS PER THE CCOE REQUIREMENTS. FOR THE ABRICATION OF THESE REFUELERS, ONLY THE CHASSISWITH PTO AND WITH CABIN WOULD BE SUPPLIED BYHPCL. ALL OTHER COMPONENTS REQUIRED F THEFABRICATION SHALL HAVE TO BE SUPPLIED BY THEFABRICATOR THE REFUELER IS TO BE FABRICATED INLINE WITH IS- 9290-1979 FOR THE IATIONREFUELING EQUIPMENT. IT SHOULD ALSO CONFORM TONFPA STANDARDS #385 AND #407. THE RESELLERSSHOULD BE DELIVERED TO HPCL ALO WITH THEINSPECTION REPORT OF THE PESO OFFICE NEAR TO THEFABRICATOR?S SITE. THE EQUIPMENT SHALL BEEQUIPPED WITH THE VARIOUS SA TY FITTINGS ASREQUIRED BY THE CCOE AND THE OTHER STATUTORYBODIES. THE FABRICATOR SHALL OBTAIN THE NECESSARYAPPROVALS FROM THE OE FOR THE DESIGN OF THEEQUIPMENT. ON THE COMPLETION OF THE FABRICATIONJOB, THE FABRICATOR SHALL PAINT THE EQUIPMENT INTHE APP VED COLOR SCHEME PROVIDED BY H.P.C.L | - | Each |
| 2 | TRANSPORTATION OF | TRANSPORTATION OF — ANSPORTATION OF TRACTOR AND TRAILER TYPEREFUELLERS BY ROAD. | - | Kilometer |
| 3 | DESIGN&FAB REFUELLER- | DESIGN&FAB REFUELLER- — /16 KL AIRCRAFT REFUELLER-FABRICATION OFREFUELLER-AVIATION SERVICE FACILITY-DESIGN,SUPPLY OF MATERIALS, FABRICATION OF EQUIPMENT UNDER THIRD PARTY INSPECTION, TESTING ANDCOMMISSIONING OF 15/16 KL CAPACITY, 1500 LPM FLOWRATE CAREFULLER FOR HPCL. THE AVIATION EFUELERSHALL CONSIST OF THE FOLLOWING: A. A SUITABLECHASSIS WITH P.T.O. AND CABIN. B. THE TANK, PUMP,POWER TAKE-OFF, DELIVERY PING AND THE REFUELINGMODULE (CONSISTING OF THE FILTER VESSEL WITHELEMENTS, PRESSURE CONTROL VALVE, METERS, HOSEREELS ETC.E. T FLOW CAPACITY OF THE REFUELERWOULD BE 1500 LPM. C. THE CONTROL SYSTEMS WHICHCOMPRISES OF THE PNEUMATIC CIRCUIT, THE ATFSENSIN CIRCUIT AND THE ELECTRICAL CIRCUIT. D.SAFETY FITTINGS REQUIRED TO BE FITTED ON THEVEHICLE AS PER THE CCOE REQUIREMENTS. FOR THE ABRICATION OF THESE REFUELERS, ONLY THE CHASSISWITH PTO AND WITH CABIN WOULD BE SUPPLIED BYHPCL. ALL OTHER COMPONENTS REQUIRED F THEFABRICATION SHALL HAVE TO BE SUPPLIED BY THEFABRICATOR THE REFUELER IS TO BE FABRICATED INLINE WITH IS- 9290-1979 FOR THE IATIONREFUELING EQUIPMENT. IT SHOULD ALSO CONFORM TONFPA STANDARDS #385 AND #407. THE RESELLERSSHOULD BE DELIVERED TO HPCL ALO WITH THEINSPECTION REPORT OF THE PESO OFFICE NEAR TO THEFABRICATOR?S SITE. THE EQUIPMENT SHALL BEEQUIPPED WITH THE VARIOUS SA TY FITTINGS ASREQUIRED BY THE CCOE AND THE OTHER STATUTORYBODIES. THE FABRICATOR SHALL OBTAIN THE NECESSARYAPPROVALS FROM THE OE FOR THE DESIGN OF THEEQUIPMENT. ON THE COMPLETION OF THE FABRICATIONJOB, THE FABRICATOR SHALL PAINT THE EQUIPMENT INTHE APP VED COLOR SCHEME PROVIDED BY H.P.C.L | - | Each |
| 4 | TRANSPORTATION OF | TRANSPORTATION OF — ANSPORTATION OF TRACTOR AND TRAILER TYPEREFUELLERS BY ROAD. | - | Kilometer |
| 5 | DESIGN&FAB REFUELLER- | DESIGN&FAB REFUELLER- — /16 KL AIRCRAFT REFUELLER-FABRICATION OFREFUELLER-AVIATION SERVICE FACILITY-DESIGN,SUPPLY OF MATERIALS, FABRICATION OF EQUIPMENT UNDER THIRD PARTY INSPECTION, TESTING ANDCOMMISSIONING OF 15/16 KL CAPACITY, 1500 LPM FLOWRATE CAREFULLER FOR HPCL. THE AVIATION EFUELERSHALL CONSIST OF THE FOLLOWING: A. A SUITABLECHASSIS WITH P.T.O. AND CABIN. B. THE TANK, PUMP,POWER TAKE-OFF, DELIVERY PING AND THE REFUELINGMODULE (CONSISTING OF THE FILTER VESSEL WITHELEMENTS, PRESSURE CONTROL VALVE, METERS, HOSEREELS ETC.E. T FLOW CAPACITY OF THE REFUELERWOULD BE 1500 LPM. C. THE CONTROL SYSTEMS WHICHCOMPRISES OF THE PNEUMATIC CIRCUIT, THE ATFSENSIN CIRCUIT AND THE ELECTRICAL CIRCUIT. D.SAFETY FITTINGS REQUIRED TO BE FITTED ON THEVEHICLE AS PER THE CCOE REQUIREMENTS. FOR THE ABRICATION OF THESE REFUELERS, ONLY THE CHASSISWITH PTO AND WITH CABIN WOULD BE SUPPLIED BYHPCL. ALL OTHER COMPONENTS REQUIRED F THEFABRICATION SHALL HAVE TO BE SUPPLIED BY THEFABRICATOR THE REFUELER IS TO BE FABRICATED INLINE WITH IS- 9290-1979 FOR THE IATIONREFUELING EQUIPMENT. IT SHOULD ALSO CONFORM TONFPA STANDARDS #385 AND #407. THE RESELLERSSHOULD BE DELIVERED TO HPCL ALO WITH THEINSPECTION REPORT OF THE PESO OFFICE NEAR TO THEFABRICATOR?S SITE. THE EQUIPMENT SHALL BEEQUIPPED WITH THE VARIOUS SA TY FITTINGS ASREQUIRED BY THE CCOE AND THE OTHER STATUTORYBODIES. THE FABRICATOR SHALL OBTAIN THE NECESSARYAPPROVALS FROM THE OE FOR THE DESIGN OF THEEQUIPMENT. ON THE COMPLETION OF THE FABRICATIONJOB, THE FABRICATOR SHALL PAINT THE EQUIPMENT INTHE APP VED COLOR SCHEME PROVIDED BY H.P.C.L | - | Each |
| 6 | TRANSPORTATION OF | TRANSPORTATION OF — ANSPORTATION OF TRACTOR AND TRAILER TYPEREFUELLERS BY ROAD. | - | Kilometer |
| 7 | DESIGN&FAB REFUELLER- | DESIGN&FAB REFUELLER- — /16 KL AIRCRAFT REFUELLER-FABRICATION OFREFUELLER-AVIATION SERVICE FACILITY-DESIGN,SUPPLY OF MATERIALS, FABRICATION OF EQUIPMENT UNDER THIRD PARTY INSPECTION, TESTING ANDCOMMISSIONING OF 15/16 KL CAPACITY, 1500 LPM FLOWRATE CAREFULLER FOR HPCL. THE AVIATION EFUELERSHALL CONSIST OF THE FOLLOWING: A. A SUITABLECHASSIS WITH P.T.O. AND CABIN. B. THE TANK, PUMP,POWER TAKE-OFF, DELIVERY PING AND THE REFUELINGMODULE (CONSISTING OF THE FILTER VESSEL WITHELEMENTS, PRESSURE CONTROL VALVE, METERS, HOSEREELS ETC.E. T FLOW CAPACITY OF THE REFUELERWOULD BE 1500 LPM. C. THE CONTROL SYSTEMS WHICHCOMPRISES OF THE PNEUMATIC CIRCUIT, THE ATFSENSIN CIRCUIT AND THE ELECTRICAL CIRCUIT. D.SAFETY FITTINGS REQUIRED TO BE FITTED ON THEVEHICLE AS PER THE CCOE REQUIREMENTS. FOR THE ABRICATION OF THESE REFUELERS, ONLY THE CHASSISWITH PTO AND WITH CABIN WOULD BE SUPPLIED BYHPCL. ALL OTHER COMPONENTS REQUIRED F THEFABRICATION SHALL HAVE TO BE SUPPLIED BY THEFABRICATOR THE REFUELER IS TO BE FABRICATED INLINE WITH IS- 9290-1979 FOR THE IATIONREFUELING EQUIPMENT. IT SHOULD ALSO CONFORM TONFPA STANDARDS #385 AND #407. THE RESELLERSSHOULD BE DELIVERED TO HPCL ALO WITH THEINSPECTION REPORT OF THE PESO OFFICE NEAR TO THEFABRICATOR?S SITE. THE EQUIPMENT SHALL BEEQUIPPED WITH THE VARIOUS SA TY FITTINGS ASREQUIRED BY THE CCOE AND THE OTHER STATUTORYBODIES. THE FABRICATOR SHALL OBTAIN THE NECESSARYAPPROVALS FROM THE OE FOR THE DESIGN OF THEEQUIPMENT. ON THE COMPLETION OF THE FABRICATIONJOB, THE FABRICATOR SHALL PAINT THE EQUIPMENT INTHE APP VED COLOR SCHEME PROVIDED BY H.P.C.L | - | Each |
| 8 | TRANSPORTATION OF | TRANSPORTATION OF — ANSPORTATION OF TRACTOR AND TRAILER TYPEREFUELLERS BY ROAD. | - | Kilometer |
| 9 | DESIGN&FAB REFUELLER- | DESIGN&FAB REFUELLER- — /16 KL AIRCRAFT REFUELLER-FABRICATION OFREFUELLER-AVIATION SERVICE FACILITY-DESIGN,SUPPLY OF MATERIALS, FABRICATION OF EQUIPMENT UNDER THIRD PARTY INSPECTION, TESTING ANDCOMMISSIONING OF 15/16 KL CAPACITY, 1500 LPM FLOWRATE CAREFULLER FOR HPCL. THE AVIATION EFUELERSHALL CONSIST OF THE FOLLOWING: A. A SUITABLECHASSIS WITH P.T.O. AND CABIN. B. THE TANK, PUMP,POWER TAKE-OFF, DELIVERY PING AND THE REFUELINGMODULE (CONSISTING OF THE FILTER VESSEL WITHELEMENTS, PRESSURE CONTROL VALVE, METERS, HOSEREELS ETC.E. T FLOW CAPACITY OF THE REFUELERWOULD BE 1500 LPM. C. THE CONTROL SYSTEMS WHICHCOMPRISES OF THE PNEUMATIC CIRCUIT, THE ATFSENSIN CIRCUIT AND THE ELECTRICAL CIRCUIT. D.SAFETY FITTINGS REQUIRED TO BE FITTED ON THEVEHICLE AS PER THE CCOE REQUIREMENTS. FOR THE ABRICATION OF THESE REFUELERS, ONLY THE CHASSISWITH PTO AND WITH CABIN WOULD BE SUPPLIED BYHPCL. ALL OTHER COMPONENTS REQUIRED F THEFABRICATION SHALL HAVE TO BE SUPPLIED BY THEFABRICATOR THE REFUELER IS TO BE FABRICATED INLINE WITH IS- 9290-1979 FOR THE IATIONREFUELING EQUIPMENT. IT SHOULD ALSO CONFORM TONFPA STANDARDS #385 AND #407. THE RESELLERSSHOULD BE DELIVERED TO HPCL ALO WITH THEINSPECTION REPORT OF THE PESO OFFICE NEAR TO THEFABRICATOR?S SITE. THE EQUIPMENT SHALL BEEQUIPPED WITH THE VARIOUS SA TY FITTINGS ASREQUIRED BY THE CCOE AND THE OTHER STATUTORYBODIES. THE FABRICATOR SHALL OBTAIN THE NECESSARYAPPROVALS FROM THE OE FOR THE DESIGN OF THEEQUIPMENT. ON THE COMPLETION OF THE FABRICATIONJOB, THE FABRICATOR SHALL PAINT THE EQUIPMENT INTHE APP VED COLOR SCHEME PROVIDED BY H.P.C.L | - | Each |
| 10 | TRANSPORTATION OF | TRANSPORTATION OF — ANSPORTATION OF TRACTOR AND TRAILER TYPEREFUELLERS BY ROAD. | - | Kilometer |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2400018556-HD-09050.pdf
TENDER_DOCUMENT • 26.90 MB
Download all tender documents and submit your bid