Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 LAccepted-AOC | ₹20.6 L | L1 | Accepted-AOC Less Rate |
| 2 | L2₹21.4 LRejected-AOC | ₹21.4 L | L2 | Rejected-AOC High Rate |
| Sl No | Description | Qty | Unit | KRISHNAPPA L1 | Lakshmipathy m L2 |
|---|---|---|---|---|---|
| 1.00Construction of Compound wall to Masinayakanapalli Burial Ground H/o Masinayakanapalli | |||||
| 2.00 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete. | 111.55 | cum | 290 ₹32,349.5 | 350 ₹39,042.5 |
| 3.00 | Cement concrete 1:4:8(one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . | 14.88 | cum | 5,939 ₹88,372.32 | 6,500 ₹96,720 |
| 4.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel BGL | 140.3 | Sqm | 590 ₹82,777 | 650 ₹91,195 |
| 5.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel AGL | 93.84 | Sqm | 1,190 ₹1,11,669.6 | 1,190 ₹1,11,669.6 |
| 6.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification | 1.25 | Mt | 95,421.5 ₹1,19,753.98 | 95,421.5 ₹1,19,753.98 |
| 7.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 37.98 | cum | 9,890.76 ₹3,75,651.06 | 9,890.76 ₹3,75,651.06 |
| 8.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications | 83.23 | cum | 6,456.44 ₹5,37,369.5 | 6,456.44 ₹5,37,369.5 |
| 9.00 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. | 662.27 | Sqm | 311.33 ₹2,06,184.52 | 350 ₹2,31,794.5 |
| 10.00 | Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete | 662.27 | Sqm | 283.09 ₹1,87,482.01 | 300 ₹1,98,681 |
Tender Value
₹20.9 L
EMD Value
₹21,000
Closing Date
30 Oct 2025, 3:00 pmClosed
Block DBlock Development oevelopment officer Hosur
Block Development office Hosur
KRISHNAGIRI DISTRICT HOSUR UNION MINES AND MINERALS 2020_21 Construction of Compound wall to Masinayakanapalli Burial Ground H/o Masinayakanapalli
2025_RDTN_617696_1
2588_2024_A4_03_09_2025
Open Tender
Civil Works - Others
180 days
Block Development office Hosur
Please refer tender documents
3 documents required · 3 mandatory
₹0
₹21,000
Block Development office Hosur
1 Jul 2026
28 Oct 2025
30 Oct 2025
28 Oct 2025
30 Oct 2025
28 Oct 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
PB02compressed.pdf
Tender Documents • 0.19 MB
TB02compressed.pdf
Tender Documents • 0.28 MB
BOQ_738188.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid