Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | ₹5.5 L | L1 | Accepted-AOC AWARD OF CONTRACT IS GIVEN TO THE CONTRACTOR |
| 2 | L2₹5.6 LRejected-Finance NOT AVAILABLE | ₹5.6 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| 3 | L3₹5.7 LRejected-Finance | ₹5.7 L | L3 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| Sl No | Description | Qty | Unit | M/S RAHUL TRADERS L1 | S S CONSTRUCTION COMPANY L2 | M/S SAVERA BUILDCON L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting or in embankment in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in – charge. | 932.87 | Cum | 52 ₹48,509.24 | 53 ₹49,442.11 | 53.5 ₹49,908.55 |
| 2.00 | Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | 1,837.93 | Cum | 274 ₹5.0 L | 280 ₹5.1 L | 280.5 ₹5.2 L |
Tender Value
₹5.8 L
EMD Value
₹57,600
Closing Date
6 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
O/O EXECUTIVE ENGINEER, MADHYA GANGA CANAL CONSTRUCTION DIVISION-9, SAMBHAL
CONSTRUCTION OF CANAL FROM KM 4.415 TO KM 4.785 OF HAIDERPUR DY.
2026_UPIDC_1128904_1
01/EE/2025-26
Open Tender
Civil Works - Canal
90 days
HAIDERPUR
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹766
₹57,600
SAMBHAL
19 May 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in cutting or in embankment in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in – charge. | |||||
| 2Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.54 MB
BOQ_2105645.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid