| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 LAccepted-AOC | ₹21.3 L | L1 | Accepted-AOC aoc |
| 2 | L2₹21.4 LRejected-Finance | ₹21.4 L | L2 | Rejected-Finance R |
| 3 | L3₹21.4 LRejected-Finance | ₹21.4 L | L3 | Rejected-Finance R |
| 4 | L4₹25.1 LRejected-Finance | ₹25.1 L | L4 | Rejected-Finance R |
Tender Value
₹35.5 L
EMD Value
₹3.5 L
Closing Date
16 Mar 2026, 12:00 pmClosed
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
Construction of Jhanghati Se SSB Camp Road Ke KM 1 se Jhanghati Ganav Tak link Road
2026_CEUBZ_1123462_5
1233/4E-NIVIDA-BASTI CIRCLE/25-26 DATED-26-02-2026
Open Tender
Civil Works
180 days
BASTI
AS PER MBD
2 documents required · 2 mandatory
₹2,714
Yes
₹3.5 L
Yes
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
26 May 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
10 Mar 2026 - 16 Mar 2026
12 Mar 2026
Construction of Embankment with Material obtained from Borrowpits ( Ledad upto 5 Km) Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.. Excluding royality .With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.).
Construction of granular Sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Techincal Specification Clause 401. As per direction of E/I With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.).
Providing ,Laying ,spreading and compacting stone aggregates of 63-45 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening,binding materials to fill up theinterstices of coarse aggregate ,watering and compacting to the required density grading 2 as per Technical specification clause 405. As per direction of E/I With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.).
Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size material to water bound macadam specification including spreading in uniform thickness, hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening grit to fill up the interstices of coarse aggregate ,watering and compacting to the required density grading 3 as per Technical specification clause 405. as per Technical Specification Complete in all aspects or as per direction of E/I .With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.).
Brick edging on both sides of road with Class-M150 bricks laid on edge with mud mortar including supply of bricks, labour, T&P and all taxes etc. complete for proper completion of the work as per specification and direction of E/ I. As per direction of E/I .With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.).
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.as per Technical Specification Clause 502 With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.).
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 3.00 kg/10 sqm on the prepared bituminous surface Cleaned with Hydraulic broom as per Technical Specification Clause 503..as per Technical Specification Complete in all aspects or as per direction of E/I. With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Providing, laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm (Crushed stone chiping 13.2mm @ 0.18 cum./10 sqm. & crushed stone chiping 11.2mm @ 0.09 cum./10 sqm.) aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat either Type-C as per technical specification clause 508. By manual means (l) Bitumen(VG-10) @ 14.60 kg. per 10 sqm. as per Technical Specification Complete in all aspects or as per direction of E/I. With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C with 6.7mm crushed stone chiping @ 0.09 cum./10 sqm. as per Technical Specification Clause 510. Bitumen(VG-10) @ 6.5 kg. per 10 sqm. as per Technical Specification Complete in all aspects or as per direction of E/I. With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Construction of Subgrade and Earthen Shoulder ( Lead upto 5 Km) Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2all aspects or as per direction of E/I . With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Earth work in excavation in foundation as per S.I. No. 251. With All Aspects(Rates are Exclucive GST but Inclucive all other taxes).
Cement concrete with 4cm gauge approved Stone ballast, find sand and cement in porportion of 8:4:1 including supply of all material, labour, T&P etc. required for proper completion of work. As per si no 281.With All Aspects (Rates are Exclucive GST but Inclucive all other taxes).
Class 150 A brick work in 1:4 cement and fine sand mortar in foundation and plinth. As per SI. No. 305(Rates are Exclucive GST but Inclucive all other taxes). (Rates are Exclucive GST but Inclucive all other taxes). With All Aspects (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P.)
Class 150 A brick work in 1:4cement and fine sand mortar in Super Structure. As per SI. No. 305 With All Aspects.(Rates are Exclucive GST but Inclucive all other taxes).
Supply of 600 mm dia Hume Pipe NP-3 type (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) With All Aspects (Rates are Exclucive GST but Inclucive all other taxes).
Laying of R.C.C. Hume pipe in construction of culvert.(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) With All Aspects (Rates are Exclucive GST but Inclucive all other taxes).
Struck pointing with cement mortar consisting of 1 part of cement and 2 parts of fine sand of 1.25 F.M including supply of all materials labour and tools and plants required for the proper completion of the work. with Curring(Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) With All AspectsAs per SI. NO. 574 (Rates are Exclucive GST but Inclucive all other taxes).
Providing & fixing of MS Iron Project Detail Bord Complete as ENC office Order With All Aspects With All Aspects (Rates are Exclucive GST but Inclucive all other taxes).
Lettering & Painting & Providing & fixing Km. Stone & Hm Stone complete as per drawing and Technical specification clause 1703. With All Aspects (Rates are Exclucive GST but Inclucive all other taxes).
Ist Year Maintenace charge @0.00% With All Aspects (Rates are Exclucive GST but Inclucive all other taxes).
IInd Year Maintenace charge @0.75% With All Aspects (Rates are Exclucive GST but Inclucive all other taxes).
IIIrd Year Maintenace charge @1.50% With All Aspects (Rates are Exclucive GST but Inclucive all other taxes).
IVth Year Maintenace charge @2.25% With All Aspects (Rates are Exclucive GST but Inclucive all other taxes).
Vth Year Maintenace charge @3.00% With All Aspects (Rates are Exclucive GST but Inclucive all other taxes).
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
BOQ_2092996.xls
BOQ • 0.39 MB
T2-5.pdf
Tender Documents • 3.98 MB
Download all tender documents and submit your bid