Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹3.2 L+₹14,659.65 (4.84%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹3.2 L+₹19,546.20 (6.45%)Rejected-Finance VISHNU BHAWAN UPPER KAITHU SHIMLA 171003 | SHIMLA | HIMACHAL PRADESH | 171003 | L3 | Rejected-Finance Reject | |
| 4 | L4₹3.3 L+₹29,319.30 (9.68%)Rejected-Finance CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | L4 | Rejected-Finance Reject |
Tender Value
₹3.3 L
EMD Value
₹6,520
Closing Date
8 Oct 2026, 9:00 amClosed
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
E.E. Shimla Urban DIVISION, HPPWD, Shimla-3
SR to HOD Room NO. B223 in the Department of paediatrics block B at IGMC Shimla SH Repair and renovation work etc.
2026_PWD_144727_5
SD-III-11587-99dt.29-09-2026
Open Tender
Civil Works - Buildings
Percentage
30 days
IGMC
as per SBD
11 documents required · 11 mandatory
₹350
₹6,520
13 Oct 2026
30 Sept 2026
8 Oct 2026
30 Sept 2026
8 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 0.37 | Per cubic metre | 975 | ₹363.29 |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 2 | Each | 127 | ₹254 |
| 3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | 14.4 | Per Square Metre | 34 | ₹489.6 |
| 4 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead : Thickness above 10 mm up to 25 mm | 12.6 | Per Square Metre | 34 | ₹428.4 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspendedfloors, roofs, landings,balconies and access platform | 0.6 | Per Square Metre | 229 | ₹137.4 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size). | 0.06 | Per cubic Metre | 6,441 | ₹386.46 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo- echanicallyTreated bars of grade Fe-500D or more. | 4.8 | Per /kilogramme | 76 | ₹364.8 |
| 8 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:3 (1 cement :3 coarse sand) | 15.12 | Per Square Metre | 864 | ₹13,063.68 |
| 9 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugsor with dash fasteners of required dia & length (hold fast lugsor dash fastener shall be paid for separately). Second class teak wood | 0.02 | Per cubic Metre | 82,203 | ₹1,726.26 |
| 10 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws | 1.58 | Per Square Metre | 2,966 | ₹4,671.45 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_215312.xls
BOQ • 0.36 MB
SBD325770.pdf
Tender Documents • 5.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .