Loading…
Loading…
Tender Value
₹53.0 L
EMD Value
₹1.3 L
Closing Date
24 Jul 2026, 3:00 pm
Chief Engineer
Civil Engineering Division, Bhabha Atomic Research Centre, Trombay, Mumbai-400085
External and Internal painting works for New FSS, E and SC , RCnD and Other buildings at Gamma Field and North Site, BARC, Trombay, Mumbai.
2026_BARC_913195_1
BARC/CED/ET/25/2026-2027 Dated 15/06/2026
Open Tender
Civil Works
270 days
Gamma Field and North Site, BARC, Trombay, Mumbai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.3 L
CED, BARC, Trombay, Mumbai
22 Jun 2026
22 Jun 2026
29 Jul 2026
22 Jun 2026
24 Jul 2026
10 Jul 2026
22 Jun 2026 - 1 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, painting,finishing walls with two coats of anti-algae, weather proof acrylic smooth emulusion paint of approved make with silicon additives on sand face plaster/ plain plaster & concrete surfaes of required shade over new work over a base coat of exterior cement primer including preparation of the surfaces, scaffolding complete. as per specifications and as directed by the Engineer-in-charge. | 7,000 | SqM | - | - |
| 2 | Providing and fixing double tubular scaffolding system using H- frames with cup lock type on the exterior side upto seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in - charge. The elevational area of the scaffolding shall be measured for payment purposes. The payment shall be made once irrespective of duration of scaffolding | 2,000 | SqM | - | - |
| 3Providing and fixing PVC rain water pipes conforming to relevant IS type B and PVC SWR fittings & specials conforming to relevant IS including jointing with seal ring / With PVC solvent adhesive including fixing in walls using clamps etc complete all as per drawings, specifications and as directed by the Engineer-in-charge | |||||
| 3.1 | SWR PIPE 110 mm O/D | 50 | RM | - | - |
| 4 | Providing and applying wall painting two coats on new work with premium plastic emulsion paint of approved brand to give an even shade, including a coat of approved cement primer, including preparation of the surfaces, scaffolding complete. as per specifications and as directed by the Engineer-in-charge | 1,500 | SqM | - | - |
| 5Providing SFMC Micro concrete for strengthening of structural members including mixing, pouring, curing as per manufacturer specifications and as directed by the Engineer-in-charge | |||||
| 5.1 | Using SFMC with 50% Quartz aggregate by weight (Only SFMC consumed alone will be measured for payment) | 1,000 | Kg | - | - |
| 6 | Providing 20 mm thick plastering using Ready mix external plastering compound of approved make for external faces of brickwork / concrete surfaces including preparation of the surface, curing, cleaning scaffolding up to 10 metres height complete.all as per specifications including forming drip moulds wherever necessary and as directed by the Engineer-in-charge | 500 | SqM | - | - |
| 7 | Extra for cement punning for all types of mixes complete all as per specifications and as directed | 100 | SqM | - | - |
| 8 | Providing and laying in position cement concrete of 1:2:4 (1 cement, 2 crushed sand, 4 graded stone aggregate of nominal size 20 mm) including consolidation, finishing, curing etc. complete as per specification and drawings but excluding the cost of Formwork shuttering, centering and steel reinforcement at all Level. Note :The minimum cement content for cement concrete works should be as per the latest revision of the relevant IS code. | 10 | CuM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Tendernotice_2.pdf
PDF • 1.48 MB
ProformaofScheduleET25.pdf
Tender Documents • 0.85 MB
ScheduleAET25.pdf
Tender Documents • 0.84 MB
BOQ_959696.xls
BOQ • 0.27 MB
TechnicalbidET25.xls
Tender Documents • 0.07 MB
GenaralNotes.pdf
Tender Documents • 0.20 MB
Download all tender documents and submit your bid