Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
19 Dec 2025, 3:00 pmClosed
Signalling work in Connection with Provision of TWS 60 Sets in yards of Jaipur Division.
SNT-JP-23-2025-26~NWR
SNT-JP-23-2025-26
Open
Works - General
12 Months
Jaipur, Rajasthan
₹0
₹2.2 L
19 Dec 2025
25 Nov 2025
5 Dec 2025
Description:- Supply of Q-Series Magnetically Latched Neutral Line Relay (QL1 Type), 11F/4B,24V DC
and RDSO Specn.No.IRS:S-34 & S-23 or latest.The interlocking code for this unit shall be ""ABDEG"". Inspection authority:- RDSO Inspection charges:- Borne by Railways Payment Terms:- 100% after supply.
Description:- Supply of Contactor Unit (QBCA1 Type), 24 V DC, 2HF/4B complete with plug
Specn.No.IRS:S-34 & S-23 or latest.The interlocking code for this unit shall be ""BCEJK"". Inspection authority:- RDSO Inspection charges:- Borne by Railways Payment Terms:- 100% after supply.
Description:- Supply of ELECTRIC POINT MACHINE ROTARY LOCKING TYPE HIGH THRUST OF 220 MM THROW, AC IMMUNITY 160 VOLT AC, NON - TRAILABLE TO OPERATE ON 110 V DC COMPLETE WITH LOCK AND DETECTOR SLIDES AND CABLE TERMINATION BOX, AS PER RDSO SPECIFICATION NO. IRS : S- 24/2002 AMENDMENT - 1 OR LATEST AS PER DRAWING.NO. RDSO/S-11000 WITH EXTERNAL CLAMP POINT LOCK AS PER DRG. NO. RDSO/S-3395 AND WITH COMPLETE SET OF GROUND CONNECTIONS WITH NYLON INSULATIONS AS PER DRG. NO. RDSO/S-3454 FOR 60Kg RAILS. THICK WEB SWITCH. LATEST ALTERATIONS IF ANY ARE APPLICABLE TO BOTH DRAWINGS. This includes supply of Set of
set of tools in a suitable tool box shall be supplied along with every set of eight point machines or less. i). Hand operated square drive socket wrenches of 12.5 mm driving square (short type) as per IS:
wrenches shall also be provided.) ii). Open jaw wrenches (spanners) for M10, M12, M20, M24 & M33 threads as per IS: 2028. iii). Adjustable wrench. iv). Screw driver 300 mm long. 20.2 Junction box and two numbers of telescopic pipes of approved type shall be supplied as an integral part of the point machine. Inspection: RDSO Inspection Charges: Borne by Railways Payment Terms: 100% after Supply.
JAIPUR DIVISION-S AND T/NORTH WESTERN RLY Description:- Fixing, wiring, testing and commissioning of Electrical Point Machine on the extended sleepers at points as per std. practice and as per RDSO Drg No. SA 9151-52 or 9710 or 9161 or 10800 or 11000 as per section of rails used. Item includes fixing switch extension bracket, providing insulation for switch extension bracket, fixing ground connection, adjusting opening of the switches and adjusting the point machine with crank handle.The item also includes : (i)Complete material for installation like ground-connections, switch extension brackets, point insulation material, I pipes, wiring materials, various fixing nuts & bolts including castle nuts, spring washers (ii) All smithy & 04 fitting works required at site for complete installation. (iii) Installation of gauge tie plate & providing insulation for gauge tie plate (Insulation in William Stretcher Bar will be Provide by Railways). (iv) Wiring inside the point machine, insertion and termination of tail cable in point machine and junction boxes / location box /cable hut as per extent practice on NWR and the instruction of Railway Engineer at site. (v) Supply and fixing of suitable size GI pipes with flange for taking cable into point machine. Note ; The ground connections shall be suitable to the Point Machines as specified by Engineer-in- charge and shall be suitable to the point lay out i.e. 60 Kg. / 52 Kg / 90R as per yard layout. Electrical Point Machine and M-6 / Screw less terminals will be supplied by Railways / covered in Schedule separately Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Commissioning.
Description:- Supply of Track Lead Junction Box(TLJB) as per Drg.No.RST-11509 or latest made from FRP material including brass bolts and hylam board sheet with terminals etc. The technical specifications are as follows: (a) TLJB complete with cover to be in black/red having approximate weight of 4.0 Kg with L-262mm W-212mm and H 90 mm and all the holes required for mounting on FRP stump (verticall two for each FRP angle) HDPE pipe , cable etc. (b) Each TLJB shall have two bakellite terminal block fitted horizontally : each bakellite terminal block shall have two nickel chrome plate M10 brass terminal, 50mm long.Alongwith each TLJB , nickel chrome plated brass links(two
32/35mm , 380 mm long alongwith two nuts for fixing on the TLJB hole . (d) The FRP stump for mounting the TLJB to be made of one meter long 30mm X30mmX 4mm angle(2 nos.) and 300mm long 30mm X30mmX 4mm angle(1 no.) fixed at 50 mm from the bottom using galvanised nuts and bolts.The TLJB and the agles for stump should come alongwith holes on them for fixing using galvanised nuts and bolts of adequate strength to be supplied alongwith TLJB drawing no. 11509. Inspection: (i) RITES if value of item in work more than 5 lakhs (ii) Consignee subject to procurement from RDSO approved vendors if value of whole item in work less than 5 lakhs as per extant instructions by Railway Board. Inspection Charges: (i)Borne by Railways (ii) None Payment Terms: 100% on Supply
Description:- Erection, Fitting and Rail connection of Track Lead Junction Box on two supports (FRP
connections on rail. The work shall be done as per instructions of Rly engineer at site. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after execution.
bonding wire as per spec No IRS S 17 & RDSO Drg No. S-69/M. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Supply.
Consignee Inspection Charges: None Payment Terms: 100% after Supply.
Description:- Horizontal direction drilling/boring without damage of surface road /track using Auger Machine(HDD machine). The bore shall be upto 200 mm dia & shall be done at the depth of minimum
different dia DWC-HDPE pipe/ GI pipes coupling etc. as per direction of Engineer In charge. Note:- Pipe Supply is not covered under this item. Contactor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution.
Description:- Horizontal Drilling by using manual pushing method at minimum depth of 1.5 meter
under this item Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution
JAIPUR DIVISION-S AND T/NORTH WESTERN RLY Description:- Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6
normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on North Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution( Unit is Cubic Meter)
Description:- Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on
before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution(unit is RM running meter)
Description:- Supplying and placing of one layer of standard size of B grade quality bricks of the
Consignee Inspection Charges: None. Payment Terms: 100% after Installation. Lengthwise (up to 2 cables).(Unit is per RM Running Meter)
Description:- Supply of Failure Analysis System (FAS) as per Technical Specifications. The specification of FAS should be got approved from the Engineer in charge before supply. Note: The
version as approved by Engineer In-Charge.(Technical specification shall be provided in tender documents.) Inspection: Consignee Inspection charges: Borne by Railways Payment terms:100% after supply
Description:- Installation, testing and commissioning of Failure Analysis System (FAS) as per Technical Specifications. The specification of FAS should be got approved from the Engineer in charge
Agreement or higher version as approved by Engineer In-Charge.(Technical specification shall be provided in tender documents.) Inspection: Consignee, Inspection charges: None Payment terms:100% after commissioning
Description:- Supply of CO2 type fire extinguisher capacity 4.5 Kg capacity ISI Mark IS: 15683
bend horn complete in all respect. Inspection: (i) RITES if value of item in work more than 5 lakhs or as per extant policy (ii) Consignee if value of whole item in work less than 5 lakhs or as per extant policy Inspection Charges:(i) Borne by Railways (ii) None Payment Terms: 100% after Supply. S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule () B-NS-A 4090670.90 NS 01 150.00 Numbers 158.19 23728.50 AT Par 23728.50 01 Description:- Supply of 9/32" drill bit make TATA/Jindal/JK. Inspection:Consignee. NS 02 500.00 Numbers 748.63 374315.00 AT Par 374315.00
Painting and writing work to be done after testing of earth value at site. All materials required for this work will be supplied by contractor.Inspection:Consignee. NS 03 5.00 Numbers 39348.17 196740.85 AT Par 196740.85
No.RDSO/SPN/177/2012 with version 3 or latest. ( Warranty Period: Upto 30 months from the date of supply).Payment:- 100% after supply. Inspection agency: RDSO-QA NS 04 5.00 Numbers 39348.17 196740.85 AT Par 196740.85
No.RDSO/SPN/177/2012 with version 3 or latest. (Warranty Period: Upto 30 months from the date of supply) Payment:- 100% after supply. Inspection agency: RDSO-QA NS 05 2.00 Numbers 26833.09 53666.18 AT Par 53666.18 05 JAIPUR DIVISION-S AND T/NORTH WESTERN RLY Description:- Supply of COM-1 card for GGtronics MAKE HASSDAC as per RDSO Specification No.RDSO/SPN/177/2012 with version 3 or latest. ( Warranty Period: Upto 30 months from the date of supply).Payment:- 100% after supply. Inspection agency: RDSO-QA NS 06 2.00 Numbers 26833.09 53666.18 AT Par 53666.18
No.RDSO/SPN/177/2012 with version 3 or latest. ( Warranty Period: Upto 30 months from the date of supply) Payment:- 100% after supply. Inspection agency: RDSO-QA NS 07 2.00 Numbers 60144.29 120288.58 AT Par 120288.58
Specification No.RDSO/SPN/177/2012 with version 3 or latest. (Warranty Period: Upto 30 months from the date of supply) Payment:- 100% after supply. Inspection agency: RDSO-QA NS 08 2.00 Numbers 46783.96 93567.92 AT Par 93567.92
Specification No.RDSO/SPN/177/2012 with version 3 or latest. (Warranty Period: Upto 30 months from the date of supply) Payment:- 100% after supply. Inspection agency: RDSO-QA NS 09 2.00 Numbers 24572.02 49144.04 AT Par 49144.04
No.RDSO/SPN/177/2012 with version 3 or latest. ( Warranty Period: Upto 30 months from the date of supply).Payment:- 100% after supply. Inspection agency: RDSO-QA NS 10 2.00 Numbers 52901.73 105803.46 AT Par 105803.46
No.RDSO/SPN/177/2012 with version 3 or latest. ( Warranty Period: Upto 30 months from the date of supply) Payment:- 100% after supply. Inspection agency: RDSO-QA NS 11 10.00 Numbers 5650.57 56505.70 AT Par 56505.70
incharge. ( Warranty Period: Upto 30 months from the date of supply) Payment:- 100% after supply. Inspection agency: RDSO-QA NS 12 5.00 Numbers 46440.83 232204.15 AT Par 232204.15
per RDSO specification No. RDSO/SPN/177/2012 (ver.3) or latest ( Warranty Period : Upto 30 months from the date of supply) Payment:-100% after supply. Inspection agency: RDSO-QA NS 13 5.00 Numbers 46440.83 232204.15 AT Par 232204.15
per RDSO specification No. RDSO/SPN/177/2012 (ver.3) or latest ( Warranty Period : Upto 30 months from the date of supply) Payment:-100% after supply. Inspection agency: RDSO-QA NS 14 10.00 Numbers 10788.74 107887.40 AT Par 107887.40
2z/Enecon/Lupromax or similar.(1 Number=1 can of 200 ml) (Warranty Period : Upto 30 months from the date of supply).Inspection:Consignee. NS 15 180.00 Man-Days 743.92 133905.60 AT Par 133905.60
etc.Inspection by :Consignee. NS 16 2.00 Numbers 11963.17 23926.34 AT Par 23926.34 16 Description:- Supply of Marking Jig for siemens make MSDAC. Make:-Siemens.Inspection:Consignee. NS 17 10.00 Set 100300.00 1003000.00 AT Par 1003000.00
assembly base clamp type - split (G36-T212505) 2. 21/25KHZ Receiver coils assembly base clamp type - split (G36-R212505). Inspection-RDSO. NS 18 20.00 Numbers 19470.00 389400.00 AT Par 389400.00
(Suitable for 52/60 KG Rails).Inspection-RDSO NS 19 10.00 Numbers 10620.00 106200.00 AT Par 106200.00 19 Description:- Supply of Mushroom box cover for GGTRONICS make MSDAC.Inspection-RDSO NS 20 10.00 Numbers 11564.00 115640.00 AT Par 115640.00
required.Inspection:Consignee. NS 21 50.00 Day 8442.72 422136.00 AT Par 422136.00 JAIPUR DIVISION-S AND T/NORTH WESTERN RLY Description:- Maintenance of Track Mounted Equipments and associated activities during
circuit jumpers / Axle Counter transducers, Opening of DC Track circuit / Axle Counter transducers digging work from rail to TLJB / TMU/ Location(cables need to beburied in proper depth)or any other S&T works related to Engineering machines. Work is required to be done as per site requirement and instructions of Railway representative.It includes drilling hole in rail as per site requirement also. The team to be provided for this work should comprise of 8 members: Fitter -1Nos., Blacksmith -1Nos., Mason/Carpenter- 1 Nos. and Helpers - 5Nos. All T&P & jigs required to execute the work will be supplied bythe contractor. (Note:"Day" = "PER DAY PERTEAM", Unit rate is for deployment of team for one day)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .