Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.6 L+₹50,564.75 (5.56%)Rejected-AOC 00 KANDHARPUR NEAR JUNIOR HIGH SCHOOL KANDHARPUR BAREILLY UTTAR PRADESH 243004 UDYAM UP 15 0021222 | BAREILLY | UTTAR PRADESH | 243004 | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical UNQUALIFIED |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
25 Feb 2021, 10:00 amClosed
EE UDEYC SRE
OFFICE OF THE EE UDEYC SRE
RECONSTRUCTION OF BOX CULVERT ON RERI DY. AT KM 2.751
2021_UPIDC_552373_14
08/EE/2020-21
Open Tender
Civil Works
Item Rate
40 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹20,000
6 Jul 2021
19 Feb 2021
25 Feb 2021
19 Feb 2021
25 Feb 2021
19 Feb 2021
Amount
Dismentelimg of R.C.C. in old vrb i/c stacking of material within 60 mtrs
Dismentelimg of C.C. in old vrb i/c stacking of material within 60 mtrs
Dismentelimg o B/W. in old vrb i/c stacking of material within 60 mtrs
Earth work in excavation in foundation in all type of soil i/c lift upto 1.50 m & lead upto 30 m & including filling, watering & ramming excavated earth into the trenches or into the space between the structure & the side of foundation trenches or into the plinth with removal & disposal of surplus earth as directed by the Engineer-in-Charge. i/c all labour, T&P etc. for proper completion of work.
Laying C.C. 1:3:6 with stone ballast i/c cost of all material, labour,T&p etc. but excluding cost of centring & shuttering for proper completion of work.
Centering and shuttering of R.C.C. work i/c all labour, T&P etc. for proper completion of work.
Supply & laying Steel reinforcement i/c bending ,binding, cutting, placinf of reinforcement i/c cost of bindidng wire but including cost of all material, labour, T&P etc. for proper completion of work.
Laying of R.C.C 1:1½:3 with stone ballast i/c cost of all material, labour & T&P etc but excluding cost of centring & shuttering and steel etc. for proper completion of work.
Earth Work in embankment in all type of soil including ramming & dressisng the surface to the reqiired level, slopes & aslo including lift upto 1.50 m & lead upto 1.00 km. i/c cost of earth. The earth from cutting to be used in side embankment or to be disposed off spoil bank or as directed by Engineer-in-Charge. i/c all labour, T&P etc. for proper completion of work.
R.R. Stone masonery i/c cost of all meterial , labour , t&p etc & proper completion of work.
Laying Boulder Pitching with 20 to 40 kg. dry boulder i/c cost of material, labout, t&P etc complete.
C.C Grouting in 1:3:6 i/c cost of material, labout, t&P etc complete.
Providing & fixing of sign board i/c writing all material labour ,t&p etc complete.
Finishing wall with water proof cement paint of approved qualityon new work with two coat to give an even shade i/c supply of all material, labour, Tools & plant etc. required for proper completion of work.
Providing & fixing of Wheels guard i/c carriage up to 8 km with all material labour ,t&p etc complete.
Writing letter on parapet of Bridge upto 10 cm height i/c cost of all material. labour T&P etc. complete.
SHRI BALAJI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .