Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance | -23.51% | ₹7.6 L | L1 | Admitted-Finance |
| 2 | L2₹7.8 L+₹12,898.81 (1.69%)Admitted-Finance | -22.22% | ₹7.8 L+₹12,898.81 (1.69%) | L2 | Admitted-Finance |
| 3 | L3₹7.9 L+₹26,097.60 (3.41%)Admitted-Finance C O VEER SINGH BHATI MALLINATH MARKET MAL GODOWN ROAD BARMER BARMER RAJASTHAN 344001 UDYAM RJ 05 0010881 | BARMER | RAJASTHAN | 344001 | -20.90% | ₹7.9 L+₹26,097.60 (3.41%) | L3 | Admitted-Finance |
| 4 | L4₹8.2 L+₹55,094.95 (7.20%)Admitted-Finance AJMER | RAJASTHAN | 305001 | -18.00% | ₹8.2 L+₹55,094.95 (7.20%) | L4 | Admitted-Finance |
| 5 | L5₹8.4 L+₹73,393.27 (9.60%)Admitted-Finance | -16.17% | ₹8.4 L+₹73,393.27 (9.60%) | L5 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
30 Mar 2026, 6:00 pmClosed
EXECUTIVE ENGINEER VIDHYADHAR NAGAR ZONE
JAIPUR NAGAR NIGAM PANDIT DEENDAYAL UPPADHYAY BHAWAN LALKOTHI TONK ROAD JAIPUR
DEVELOPMENT WORK AT SHYAM GREEN PARK IN WARD NO. 36.
2026_DLB_547312_1
286 EXECUTIVE ENGINEER VIDHYADHAR NAGAR ZONE
Open Tender
Civil Works
Percentage
60 days
JAIPUR
As Per Bid Documents
3 documents required · 3 mandatory
₹590
ONLINE PAY IN JAIPURMC WEBSITE
₹20,000
Yes
6 Apr 2026
19 Mar 2026
1 Apr 2026
19 Mar 2026
30 Mar 2026
19 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | |||||
| 2Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | |||||
| 3Removing & re-fixing of precast cement concrete interlocking paving blocks of all sizes over 50 mm thick course sand bedding (duly compacted) including filling of joints with sand complete in all respect. | |||||
| 4Providing and fixing precast cement concrete M-20 grade (Using mechanical Concrete Mixer) kerb stone top and bottom width 115 and 165 mm respectively, 250 mm high on 150 mm thick PCC M-10 grade foundation as per design, including fixing at site as per clause 408 of MoRT&H Specification including all material, labour machinery, lighting, guarding and maintenance of diversion | |||||
| 5Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete | |||||
| 6Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). | |||||
| 7Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work | |||||
| 8Kota stone slab flooring 25mm thick over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :Area of each slab 900 to 2000 sqcm | |||||
| 9Providing and fixing Stone jali 50mm thick Red/Pink sand stone as per ornamental design to fixed with white cement/epoxy mortar including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment, matching the stone shade. | |||||
| 10Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
EPROC286XENVDZ.pdf
Tender Documents • 5.35 MB
BOQ_975930.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .