Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance R O WARD NO 03 KATHUA DISTRICT KATHUA | -2.55% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 L+₹2,171.94 (1.49%)Admitted-Finance | -1.10% | ₹1.5 L+₹2,171.94 (1.49%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 L+₹3,070.68 (2.10%)Admitted-Finance | -0.50% | ₹1.5 L+₹3,070.68 (2.10%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
23 Jul 2026, 6:00 pmClosed
Executive Engineer Irrigation Division Kathua
Executive Engineer Irrigation Division Kathua
Construction of Toe wall on Left Bank of Andhri khul near Rd 850m in Mirpur Nagri
2026_IFC_315882_1
eNIT No. 05 of 07/2026-27
Open Tender
Civil Works - Canal
Percentage
20 days
Kathua
eNIT No. 05 of 07/2026-27
2 documents required · 2 mandatory
₹200
Executive Engineer
₹3,000
Yes
31 Jul 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
23 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.7.1 All kinds of soil | 18.43 | cum | 187.3 | ₹3,451.94 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 17.2 | cum | 5,733.6 | ₹98,617.92 |
| 3 | Dumping of stones excluding cost of stones in horizontal on level. | 7.37 | cum | 237.9 | ₹1,753.32 |
| 4 | Centering and shuttering including strutting and removal of form for foundations, footings, bases of columns etc. for mass concrete | 81.92 | Sqm | 286.35 | ₹23,457.79 |
| 5 | 12 mm thick cement plaster in 1:4 | 33.28 | Sqm | 283.8 | ₹9,444.86 |
| 6 | Supply of stones boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%) | - | cum | 700 | - |
| 7 | Carriage of stones at avg. distance of 8 km by MT | - | cum | 291.45 | - |
| 8 | Carriage of sand and Bajri at avg. distance of 8 km by MT | 23.62 | cum | 247.72 | ₹5,851.15 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. excluding rolling and watering. | 5.53 | Nos | 180.55 | ₹998.44 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_1026785.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .