Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹4.3 LAWARDED | AWARDED |
Tender Value
₹5.2 L
EMD Value
₹13,100
Closing Date
11 Nov 2025, 9:30 pmClosed
Public Works Department
ANNUAL MAINTENANCE OF THE ROAD FROM BACHALLI-MUNJANAHALLI ROAD CH 3.50 TO 7.01KM ANNUAL MAINTENANCE FOR THE ROAD FROM B.B ROAD TO GULUVINA ATTIGUPPE CH 0.00 TO 2.53 KM IN SALIGRAMA TALUK FOR THE YEAR 2025-26
PWD/2025-26/RD/WORK_INDENT25118/CALL-3
PWD/2025-26/RD/WORK_INDENT25118/CALL-3
Open
Roads
Electronic Documents, First(One Cover)
PWD Special Division Office Hunasuru
₹500
₹13,100
3 Nov 2025
3 Nov 2025
7 Nov 2025
ANNUAL MAINTENANCE OF THE ROAD FROM BAACHHALLI-MUNJANAHALLI ROAD CH 3.50 TO 7.01KM IN SALIGRAM TALUK
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to ...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Culverts - Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical spec...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 --...
Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. ---- All the items in the tender include all lead, lifts, loading unloading,...
ANNUAL MAINTENANCE FOR THE ROAD FROM B.B ROAD TO GULUVINA ATTIGUPPE CH 0.00 TO 2.53 KM IN SALIGRAMA TALUK
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Culverts - Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical spec...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 --...
Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. ---- All the items in the tender include all lead, lifts, loading unloading,...
ANNUAL MAINTENANCE OF THE ROAD FROM BACHALLI-MUNJANAHALLI ROAD CH 3.50 TO 7.01KM ANNUAL MAINTENANCE FOR THE ROAD FROM B.B ROAD TO GULUVINA ATTIGUPPE CH 0.00 TO 2.53 KM IN SALIGRAMA TALUK FOR THE YEAR 2025-26
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to ...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Culverts - Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical spec...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 --...
Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. ---- All the items in the tender include all lead, lifts, loading unloading,...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .