Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 LAccepted-AOC VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | 1 | Accepted-AOC Eligible L-1 bidder | |
| 2 | 2₹3.0 L+₹14,015.31 (4.98%)Rejected-Finance VILL BAHULA C I JAMBAD COLLIERY BAHULA SIDULI ROAD PANDAVESWAR WEST BENGAL INDIA 713322 | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | 2 | Rejected-Finance Quoted more than L-1 bidder | |
| 3 | 3₹3.2 L+₹38,535.71 (13.7%)Rejected-Finance KENDA KENDA KENDA BARDHAMAN 713342 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713342 | 3 | Rejected-Finance Quoted more than L-1 bidder |
Tender Value
₹2.7 L
EMD Value
₹3,400
Closing Date
13 Jan 2023, 5:00 pmClosed
AE EnM
Sonepur Bazari Area ECL
erection of 6.6 KV OH line from 25 MVA substation to base workshop for feeding power to transformer of water filter plant ETP at base workshop under SB project
2022_ECL_266193_1
GM/SBA/EnM/e-tender/2022-23/ 626
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Sonepur Bazari Area ECL
please refer tender documents
6 documents required · 6 mandatory
₹3,400
21 Feb 2023
2 Jan 2023
16 Jan 2023
3 Jan 2023
13 Jan 2023
3 Jan 2023
3 Jan 2023 - 6 Jan 2023
Amount
Item Description/ Heading
Material Cost
Material cost for erection 11/12 mtrs long steel tubular pole with cement concrete
Material cost for supply, fabrication, hoisting, erection of phase and earth bracket and painting with red oxide primer
Meterial cost for supply and erection of nuts and bolts,flats for febrication and erection of clamps
Meterial cost for supply and installation of 11 KV disc insulator and hardware.
Meterial cost for supply and installation of 11 KV pin insulator and hardware.
Material cost for supply, fixing and erection of HT stay set complete with stay plate, stay insulator, and stay wire for required dimensions and specification
Material cost for Supply and fixing of 7/14 SWG GI wire for earth continiuity and 6/8 SWG for making and erection of cradle guard
Material cost for supply and stringing of ACSR DOG/WOLF conductor
Material cost for erection of earth pit with supply of all required materials
Material cost for making of drop wire with insulator, bracket clamp etc.
Labour Cost:-
Labour cost for erection 11/12 mtrs long steel tubular pole with cement concrete
Labour cost for fabrication, hoisting, erection of phase and earth bracket and painting with red oxide primer
Labour cost for erection of nuts, bolts,flats and erection of clamps
Labour cost for installation of 11kV disc insulator and hardware
Labour cost for installation of 11 kv pin insulator and hardware.
Labour cost for erection of HT stay set complete with stay plate, stay insulator, and stay wire for required dimensions and specification
Labour cost for fixing of 7/14 SWG GI wire for earth continiuity and 6/8 SWG for making and erection of cradle guard
Labour cost for stringing of ACSR/WOLF conductor
Labour cost for erection of earth pit with supply of all required materials
Labour cost for making of drop wire with insulator, bracket clamp etc
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
BAKSI ENTERPRISE
BANERJEE CONCERN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_275349.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .