CE/TP-I/Guindy
A10 Thiru vi ka Indl Estate Guindy Chennai 32
Supply and erection of 110kV XLPE cable from Basin bridge SS to BandC mill SS route length 2.2km and from Vysarpadi ss to Band C mill ss route length 2.7km.
2025_EB_605934_1
TP1-62/2025-26
Open Tender
Electrical Works
Works
Guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17.0 L
24 Oct 2025
19 Sept 2025
6 Dec 2025
19 Sept 2025
5 Dec 2025
7 Oct 2025
20 Sept 2025 - 26 Sept 2025
Schedule A-1(For Imported items)
Schedule A-2(For indigenous items)
Schedule A-3 (Erection of cable and its accessories)
Schedules A-4 (Civil works)
BoQ_Ver4.0
Specification No: TPI-62/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE - A1 Scheme -1 (For imported items) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
110KV,1x630sq.mm,Alu XLPE cable (RL:2.2 Kms)
110KV Straight Through Joints
110KV Insulated Joints
110KV Outdoor Termination kit
110 KV Outdoor Termination Structure with spring loaded clamp.
110kV LAS without support structure
110 kV LAS Structure
110 kV Single phase link box without CCPU at both SS end
110 kV Single phase link box with CCPU at Insulated joint end
6.35/11kV 400Sq.mm Sheath Bonding cable
Supply of 48 Core Optic Fibre (ADSS) Cable with Joints, 40 mm Dia HDPE Duct hose pipe, FODP and all accessories.
Providing Warning Tape
Earthing and sundries
BoQ_Ver4.0
Specification No: TPI-62/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE - A1 Scheme -2 (For imported items) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
110KV,1x630sq.mm,Alu Cable (RL:2.7 Kms)
110KV Straight Through Joints
110KV Insulated Joints
110KV Outdoor Termination kits
110 KV Outdoor Termination Structure with spring loaded clamp.
110kV LAS without support structure
110 kV LAS Structure
110 kV Single phase link box without CCPU at both SS end
110 kV Single phase link box with CCPU at Insulated joint end
6.35/11kV 400Sq.mm Sheath Bonding cable
Supply of 48 Core Optic Fibre (ADSS) Cable with Joints, 40 mm Dia HDPE Duct hose pipe, FODP and all accessories.
Providing Warning Tape
Earthing and sundries
BoQ_Ver4.0
Specification No: TPI-62/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE - A2 Scheme - 1 (For indigenous items) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
110KV,1x630sq.mm,Alu XLPE cable (RL:2.2 Kms)
110KV Straight Through Joints
110KV Insulated Joints
110KV Outdoor Termination kit
110 KV Outdoor Termination Structure with spring loaded clamp.
110kV LAS without support structure
110 kV LAS Structure
110 kV Single phase link box without CCPU at both SS end
110 kV Single phase link box with CCPU at Insulated joint end
6.35/11kV 400Sq.mm Sheath Bonding cable
Supply of 48 Core Optic Fibre (ADSS) Cable with Joints, 40 mm Dia HDPE Duct hose pipe, FODP and all accessories.
Providing Warning Tape
Earthing and sundries
BoQ_Ver4.0
Specification No: TP I-62/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE - A2 Scheme - 2 (For indigenous items) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
110KV,1x630sq.mm,Alu Cable (RL:2.7 Kms)
110KV Straight Through Joints
110KV Insulated Joints
110KV Outdoor Termination kits
110 KV Outdoor Termination Structure with spring loaded clamp.
110kV LAS without support structure
110 kV LAS Structure
110 kV Single phase link box without CCPU at both SS end
110 kV Single phase link box with CCPU at Insulated joint end
6.35/11kV 400Sq.mm Sheath Bonding cable
Supply of 48 Core Optic Fibre (ADSS) Cable with Joints, 40 mm Dia HDPE Duct hose pipe, FODP and all accessories.
Providing Warning Tape
Earthing and sundries
BoQ_Ver4.0
Specification No: TPI-62/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE - A3- Scheme - 1 (Erection, testing and commissioning of 110KV UG cable & accessories) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Erection & company supervision charges of 110 kV Straight Through joints
Erection & company supervision charges of 110 kV Insulated joints
Erection & company supervision charges of 110KV OD Termination including structure
Erection & company supervision charges for 110KV LAS including structure
Erection & company supervision charges of ADSS splicing,termination end FODB
Transporting of 110 kV 1X630 Sq.mm XLPE UG cable drums each weighing approximately 7T in lorries using adequate capacity truck mounted crane for both loading and unloading including labour required for loading, transporting, unloading, driver bata etc.,Supplying and Providing of Winch,steel wire drum, cable drum stand, rollers, ramp and other T&P 's required for laying to the work site by engaging lorry and crane for site (No material will be supplied from department stores.) Positioning of winch ,D.G.set and others rollers for cable laying on a day before laying, Laying of cables in trench and duct by means of winch over rollers, dressing the cable in trefoil formation, tying the cable with nylon rope at every 3m intervals.The rate includes the cost of pulling the steel wire rope from winch side to drum side,devolution of any balance cables to CDC stores, all tools & plants, labour consumables, lead, lift etc., complete.
Providing watch and ward (Unskilled) at site as instructed site-in-charge.
BoQ_Ver4.0
Specification No: TP I-62/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE - A3- Scheme - 2(Erection, testing and commissioning of 110KV UG cable & accessories) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Erection & company supervision charges of 110 kV Straight Through joints
Erection & company supervision charges of 110 kV Insulated joints
Erection & company supervision charges of 110KV OD Termination including structure
Erection & company supervision charges for 110KV LAS including structure
Erection & company supervision charges of ADSS splicing,termination end FODB
Transporting of 110 kV 1X630 Sq.mm XLPE UG cable drums each weighing approximately 7T in lorries using adequate capacity truck mounted crane for both loading and unloading including labour required for loading, transporting, unloading, driver bata etc.,Supplying and Providing of Winch,steel wire drum, cable drum stand, rollers, ramp and other T&P 's required for laying to the work site by engaging lorry and crane for site (No material will be supplied from department stores.) Positioning of winch ,D.G.set and others rollers for cable laying on a day before laying, Laying of cables in trench and duct by means of winch over rollers, dressing the cable in trefoil formation, tying the cable with nylon rope at every 3m intervals.The rate includes the cost of pulling the steel wire rope from winch side to drum side,devolution of any balance cables to CDC stores, all tools & plants, labour consumables, lead, lift etc., complete.
Providing watch and ward (Unskilled) at site as instructed site-in-charge.
BoQ_Ver4.0
Specification No: TP I-62/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE - A4 - Scheme - 1 (civil works for cable laying, Supply and erection of gantry structure for 110kV cable ) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Removing the black topping of any thickness and forming cable duct at road crossing including cost of providing sign board,danger lights, indication arrengements wherever neceessary lead lift, labour and all mtools & plants etc. complete.
Earth work excavation in all soils including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing 60cm wide and 150cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements, Reflective tapes wherever necessary and providing shoring and strutting arrangements wherever necessary, all lead, lift, labour, tools & plants, etc., compete including bailing out of water.
Dismantling clearing away carefully the materials irrespective of thickness of Brick masonry inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead,lifts,labour,tools and Plants , complete
Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from P.C.C. inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead,lifts,labour,tools and Plants , complete
Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from R.C.C. inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead, lifts, labour, tools and Plants , complete.
Filling with filling Sand in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete.
Back filling with excavated earth in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete.
Transporting and clearing the excess excavated earth and debris than and there and as soon as immediately to avoid any hinderance to normal flow of traffic and publicf beyond a distance of 5km from the work spot as per the direction of Engineer at site including loading and unloading charges etc., complete.
Laying plain cement concrete 1:3:6 using 20mm using HBG (MB) including cost of all materials, lead, lift and labour, etc., complete and as per std.specification.
Supplying and laying 160mm dia of 6 kg/cm2 PVC pipe including labour for transporting the PVC pipes, laying in position, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of pipe, specials, labour, lead, lift, T&P etc., complete.
Supplying and laying 110mm dia of 6 kg/cm2 PVC pipe including labour for transporting the PVC pipes, laying in position, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of pipe, specials, labour, lead, lift, T&P etc., complete.
Supplying and Laying RCC cover slab of size 600x500x50mm including labour for loading, unloading, stenciling and placing in position carefully as required at site, cost of slab, all labour, lead, lift, T&P, etc., complete.
Providing joint chamber BW in CM 1:6 using second class chamber burnt bricks including cost of all materials labour lead lift curing etc complete.
Plastering with CM 1:5, 12 mm thick for joint bay chamber wallls including cost pf all materials labour lead lift curing etc complete.
Bailing out water from cable trench and duct while excavating and also while laying cable using 5HP diesel pump including cost of fuel, operator etc., complete.
Casting & placing of RCC offset slab of size 750 x750 x 60 mm casting in RCC 1:2:4 using 12 to 20 mm HBG metal with necessary reinforcement, piling, shuttering, curing, transport from castingpiling, shuttering, curing, transport from casting yard to various locations & fixing the slab along 110 KV cable route as directed by the Engineer incharge with PCC 1:3:6 including cost of all materilas, labour, lessd, lift, etc., including 2 coats of flouresecent paint.
Providing Barricading works for laying cables using Steel barricade with green barricade Construction safety nets continuously without gap inclusive material cost,labour charges and removal charges after completing the work etc complete and as directed by the Engineer at site.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.complete
Laying M20 Ready Mix Concrete for RCC work for Canal Crossing,ODT & LAS plinths and wherever required using 20mm down graded HBG metel for ducts as per standard specification including cost of steel, all materials lead, lift, labour, for laying concrete, curing, etc., complete.
Trenchless crossing including cost of pipe -Horizontal directional drilling -Supplying and laying of HDPE pipe of 200 mm dia wall thickness 10mm(PE100 grade-PN10),6 Kg per cm2 with spigot and socket end by trench less method 2.5m to 3m below the ground level in all soil including shoring and shuttering and driving the horizontal bore by ( trenchless technology method) without affecting any highway installations and other service lines. The rate includes the provision of drive pit, entry pit, exit pit as required and removing the soil from the pipe, cost of jointing the pipe with fusion method tying and providing 7/20 SWG GI wire inside the pipe and closing the ends by end cover etc. complete or by any other suitable method as the site condition may warrant as approved by the Engineer at site. All the tools and plants ie machinery, labour and materials are to be provided by the contractor/ tenderer) .
BoQ_Ver4.0
Specification No: TP I-62/2025-26
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE - A4 - Scheme - 2 (civil works for cable laying, Supply and erection of gantry structure for 110kV cable ) (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Removing the black topping of any thickness and forming cable duct at road crossing including cost of providing sign board,danger lights, indication arrengements wherever neceessary lead lift, labour and all mtools & plants etc. complete.
Earth work excavation in all soils including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing 60cm wide and 150cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements, Reflective tapes wherever necessary and providing shoring and strutting arrangements wherever necessary, all lead, lift, labour, tools & plants, etc., compete including bailing out of water.
Dismantling clearing away carefully the materials irrespective of thickness of Brick masonry inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead,lifts,labour,tools and Plants , complete
Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from P.C.C. inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead,lifts,labour,tools and Plants , complete
Dismantling clearing away carefully the materials irrespective of thickness of Concrete obtained from R.C.C. inside the cable trench and free from debris and without Cable laying work. Including cost of labour, hinderence to the initial lead, lifts, labour, tools and Plants , complete.
Filling with filling Sand in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete.
Back filling with excavated earth in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete.
Transporting and clearing the excess excavated earth and debris than and there and as soon as immediately to avoid any hinderance to normal flow of traffic and publicf beyond a distance of 5km from the work spot as per the direction of Engineer at site including loading and unloading charges etc., complete.
Laying plain cement concrete 1:3:6 using 20mm using HBG (MB) including cost of all materials, lead, lift and labour, etc., complete and as per std.specification.
Supplying and laying 160mm dia of 6 kg/cm2 PVC pipe including labour for transporting the PVC pipes, laying in position, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of pipe, specials, labour, lead, lift, T&P etc., complete.
Supplying and laying 110mm dia of 6 kg/cm2 PVC pipe including labour for transporting the PVC pipes, laying in position, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of pipe, specials, labour, lead, lift, T&P etc., complete.
Supplying and Laying RCC cover slab of size 600x500x50mm including labour for loading, unloading, stenciling and placing in position carefully as required at site, cost of slab, all labour, lead, lift, T&P, etc., complete.
Providing joint chamber BW in CM 1:6 using second class chamber burnt bricks including cost of all materials labour lead lift curing etc complete.
Plastering with CM 1:5, 12 mm thick for joint bay chamber wallls including cost pf all materials labour lead lift curing etc complete.
Bailing out water from cable trench and duct while excavating and also while laying cable using 5HP diesel pump including cost of fuel, operator etc., complete.
Casting & placing of RCC offset slab of size 750 x750 x 60 mm casting in RCC 1:2:4 using 12 to 20 mm HBG metal with necessary reinforcement, piling, shuttering, curing, transport from castingpiling, shuttering, curing, transport from casting yard to various locations & fixing the slab along 110 KV cable route as directed by the Engineer incharge with PCC 1:3:6 including cost of all materilas, labour, lessd, lift, etc., including 2 coats of flouresecent paint.
Providing Barricading works for laying cables using Steel barricade with green barricade Construction safety nets continuously without gap inclusive material cost,labour charges and removal charges after completing the work etc complete and as directed by the Engineer at site.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.complete
Laying M20 Ready Mix Concrete for RCC work for Canal Crossing,ODT & LAS plinths and wherever required using 20mm down graded HBG metel for ducts as per standard specification including cost of steel, all materials lead, lift, labour, for laying concrete, curing, etc., complete.
Trenchless crossing including cost of pipe -Horizontal directional drilling -Supplying and laying of HDPE pipe of 200 mm dia wall thickness 10mm(PE100 grade-PN10),6 Kg per cm2 with spigot and socket end by trench less method 2.5m to 3m below the ground level in all soil including shoring and shuttering and driving the horizontal bore by ( trenchless technology method) without affecting any highway installations and other service lines. The rate includes the provision of drive pit, entry pit, exit pit as required and removing the soil from the pipe, cost of jointing the pipe with fusion method tying and providing 7/20 SWG GI wire inside the pipe and closing the ends by end cover etc. complete or by any other suitable method as the site condition may warrant as approved by the Engineer at site. All the tools and plants ie machinery, labour and materials are to be provided by the contractor/ tenderer) .
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_724315.xls
BOQ • 0.60 MB
BASINBRIDGETOBandCMILL.pdf
Additional Documents • 0.18 MB
Spec62.pdf
Tender Documents • 1.34 MB
VYSARPADITOBandCMILL.pdf
Additional Documents • 0.18 MB
prebidreply.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .