Tender Value
₹43 L
EMD Value
₹43,000
Closing Date
28 May 2020, 4:00 pmClosed
Project Director
DRDA, Namakkal
1 road work at Namagiripet Block in Namakkal District under NABARD XXV Package 12
2020_RDTN_163486_11
1785/2020
Open Tender
Civil Works - Roads
Item Rate
180 days
Namagiripet Block
Class I
3 documents required · 3 mandatory
₹0
₹43,000
Yes
DRDA, Namakkal
1 Jun 2020
13 May 2020
28 May 2020
13 May 2020
28 May 2020
20 May 2020
20 May 2020
Amount
Upgradation to the road from Thottikadu To Periyasamy House Km 0/0 - 1/00 (R328)
Clearing Scrub Jungles and removing them by burrying or burning etc., completed as per Sl. No.2
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity
Collection and Supply of Gritty Gravel with an Average Lead of 1K.M including Cost and conveyance and stacking Charges and Spreading with Power Roller including Compaction etc., complete.
Providing and laying W.B.M 75 mm Consolidated Thickness With Grade II Metal using 1.00 Cum of 90mm -22.40mm IRC HG Metal with 0.24Cum of Gritty Gravel for blindage including all charges etc.,
Providing and laying W.B.M 75 mm Consolidated Thickness With Grade III Metal using 1.00 Cum of 63mm -11.20 mm IRC HG Metal with 0.24Cum of Gritty Gravel for blindage including all charges etc.,
Providing and laying Tack coat over the W.B.M surface using 4Kgs. of Emulsion Bitumen for 10 Sqm area etc., complete.
Providing and laying Premix carpet with sealcoat Type A to 20 mm Consolitated etc., complete as per clause 509 of MOST Specification.
Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 3 : 6 mix using 40 MM metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and Centering for all Works including cost and conveyance of all materials to site and all labour charges etc complete. (Footing)
Supplying and Centering for all Works including cost and conveyance of all materials to site and all labour charges etc complete. (Structure)
Hard bed
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity
Cement concrete 1 : 4 : 8 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 3 : 6 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and errection of centering for sides and sofits using country wood props and sttel shutters etc.,
Providing and laying W.B.M 75 mm Consolidated Thickness With Grade III Metal using 1.00 Cum of 63mm -11.20 mm IRC HG Metal with 0.24Cum of Gritty Gravel for blindage including all charges etc.,
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Drain
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 2 : 4 mix using 20 MM metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and Centering for all Works including cost and conveyance of all materials to site and all labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sri Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .