Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹61.1 LAdmitted-Finance | -36.99% | ₹61.1 L | L1 | Admitted-Finance |
| 2 | L2₹67.8 LAdmitted-Finance | -30.01% | ₹67.8 L | L2 | Admitted-Finance |
| 3 | L3₹70.7 LAdmitted-Finance | -27.11% | ₹70.7 L | L3 | Admitted-Finance |
| 4 | L4₹74.5 LAdmitted-Finance | -23.14% | ₹74.5 L | L4 | Admitted-Finance |
| 5 | L5₹79.0 LAdmitted-Finance | -18.51% | ₹79.0 L | L5 | Admitted-Finance |
Tender Value
₹96.9 L
EMD Value
₹1.9 L
Closing Date
14 Apr 2026, 6:00 pmClosed
SE WDSC BHARATPUR
OFFICE OF THE SE WDSC BHARATPUR
Construction of PT, MPT, SSB and Other Water Harvesting Structure PS Bayana Under MjSA 2-2
2026_WDSC_549622_1
NIT 01/2026-27/ Bayana Bharatpur
Open Tender
Civil Works
180 days
Bayana
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
As per Nit/Tender doc
₹1.9 L
24 Apr 2026
3 Apr 2026
15 Apr 2026
3 Apr 2026
14 Apr 2026
3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Item Description | ||||||
| 1.01 | Dag belling 2.5 cm to 5 cm Deep | - | Mt | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Jungle clearance by scaping of grass and shrubs | 0.29 | Sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 1.03 | 15 से.मी. तक औसत मिटटी काटकर जमीन की सतह को संवारना (Dressing) तथा वनस्पती तथा छोटे पौधों को हटाना तथा तुच्छ पदार्थ और कुडा करकट को 1.5 मीटर उठान तथा 50 मीटर दूरी तक डालना। | - | sqm | - | - | BI01010001010000000000000515BI0100001115 |
| 1.04 | Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Cut off Wall (From 3 m depth to 4.5 m depth) | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.05 | Watering of earth including cost of carriage of water when source of water is up to 1km | - | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.06 | Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Cut of Wall (From 4.5 m depth to 6.0 m depth) | - | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.07 | Compaction of earth or highly weathered strata by manually or plain roller. (Density 90% proctor) | - | Cum | - | - | BI01010001010000000000000515BI0100001119 |
| 1.08 | Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Cut of Wall (From 6 m depth to 6.5 m depth) | - | cum | - | - | BI01010001010000000000000515BI0100001120 |
| 1.09 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Soft Soil) I | - | cum | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_979824.xls
BOQ • 0.26 MB
tenderdoc.pdf
Tender Documents • 4.97 MB
Download all tender documents and submit your bid