Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 LAccepted-Finance 91 B LAXMI NAGAR AIRPORT ROAD INDORE INDORE MADHYA PRADESH 452005 UDYAM MP 23 0000211 | INDORE | MADHYA PRADESH | 452005 | 1 | Accepted-Finance L1 | |
| 2 | 2₹6.5 L+₹21,999.80 (3.52%)Accepted-Finance | 2 | Accepted-Finance L2 | |
| 3 | 3₹6.5 L+₹23,106.42 (3.70%)Accepted-Finance | 3 | Accepted-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-GST submitted is not activated |
Tender Value
₹7.6 L
EMD Value
₹15,217
Closing Date
9 May 2023, 3:00 pmClosed
Executive Engineer PRI Lucknow Mayabunder
Office of the Executive Engineer PRI Mayabunder
Construction Retaining wall back side of Kasim house, Shanti house, Rama Rao house, Duryodhan house to Salar house at Pokhadera ward no. 04 under GP, Pokhadera.
2023_RDPRI_10212_1
162/EE/PRI/MB/22-2023
Open Tender
Civil Works - Others
Works
150 days
pokhadera
Refer Tender Documents
5 documents required · 5 mandatory
₹500
Executive Engineer PRI N and MAD Mayabunder
₹15,217
15 May 2023
28 Apr 2023
9 May 2023
28 Apr 2023
9 May 2023
28 Apr 2023
28 Apr 2023 - 1 May 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 pulverised sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
1:3:6 (1 Cement : 3 pulverised sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :
1:1.5:3 (1 cement: 1.5 pulverised sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement
1:1.5:3 (1 cement : 1.5 pulverised sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centring and shuttering including strutting, propping etc. and removal of form for :
Foundation, footings,bases of columns, etc.for mass concrete
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
12 mm cement plaster of mix :
1:4 (1 cement : 4 River sand)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and Fixing PVC pipe for Weap hole as direction for engineer in charge.
50 mm dia
BHAGWAN SINGH
Ashini Sikder
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .